Goods Receipt (GRN) for Mineral processing companies
Record what physically arrives against a supplier order.
Does this function belong in your operation?
Use when purchased physical goods need quantity and acceptance checks on arrival.
Purchased goods arrive at a receiving location.
Reagent deliveries and spare mill parts are counted at the plant gate against the purchase order. A short drum or a damaged liner is noted at once. The haul ticket stays with ore receipts instead.
Bring the records the workflow depends on.
- Purchase order
- Delivery note
- Acceptance and storage rules
Outputs to check
- Numbered receipt and inspection record
- Accepted and rejected quantity statement
- Purchase-order balance and bill-match inputs
Follow the goods receipt (grn) workflow.
Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.
Who uses the module, and who approves?
Keep responsibilities distinct even when one person holds more than one role.
Decide how exceptions are handled.
These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.
Can this work independently?
Goods receipt needs item and supplier references; a purchase order is preferred or an explicitly approved unplanned receipt is required. Stock posting, quality release and invoice approval are separate handoffs. Receiving a delivery note does not prove that the stated goods were counted or accepted.
Systems and records it connects with
- Purchase orders: Authorised supplier commitments and open line balances.
- Stock: Item-location quantities and authorised stock movements.
- Vendor bills: Supplier invoice lines and authorised posting status.
- Quality control: Inspection results and authorised hold or release decisions.
Configure, test and introduce the workflow.
- We watch how material comes in and who signs for it. You describe the problems met at the gate. A short list of what needs recording returns to you.
- Open purchase orders and the item list are brought in. The purchase team checks a sample for accuracy. The storekeeper enters real deliveries on a trial screen next to the paper register. Gaps in the form are found and fixed.
- Hold rules, batch numbers and weighbridge entries are set where they apply. You approve which items need them. Storekeepers and the accounts desk practise on phones and screens. The paper register stops on an agreed date.
Check the result before rollout.
Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.
- Receipt quantities link to the purchase order.
- Rejected goods remain distinct from accepted stock.
- Partial deliveries leave the correct balance due.
How the business operates.
Ore arrives from one or more pits and goes onto stockpiles by grade. The crusher, the mills and the flotation or leach circuit then turn it into a concentrate that a smelter or trader pays for by assay. Weights, moisture and assays decide the invoice. Small errors cost real money.
The records that hold the operation together.
- Ore receipt and weighbridge. Record each load with source pit, haul ticket, gross, tare and net, and assign it to a stockpile block.
- Stockpile blocks and blend plan. Hold balances by block and grade, plan the blend the loader follows, and subtract what is fed to the crusher.
- Crusher and mill shift log. Capture feed rate, power draw, grind size, cyclone pressure and downtime with reasons for each circuit and shift.
- Sample register. Number every composite, record the point and time it was cut, and follow it to the laboratory and back.
Operational bottlenecks to check
Feed tonnes and assays sit apart
The weighbridge ticket is in one file and the feed assay is in the laboratory system. Nobody can multiply tonnes by grade for a single stockpile block without retyping.
Recovery is worked out weeks late
A metallurgist rebuilds the mass balance from shift sheets after month end. By then the mill has run a different blend for days and the cause of a low recovery is gone.
How work flows across this business
This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.
1. Ore receipt
A truck crosses the weighbridge. The clerk records the source pit, the haul ticket and the block, and the grade controller assigns a stockpile position. The load is counted once.
2. Blend and feed
The blend plan names which blocks the loader draws from. Feed tonnes entering the crusher are recorded and subtracted from the stockpile balances.
3. Shift operation
Operators log throughput, grind size, dosing, tank levels and any stop with its reason for each circuit.
4. Sampling and assay
Samplers cut composites from feed, concentrate and tailings. Each carries a number, goes to the laboratory and returns as an assay attached to its lot.
5. Balance
Tonnes and assays combine into recovery and mass balance for the shift. Differences beyond the limits your metallurgist sets are flagged. Review follows.
6. Dispatch and settlement
Concentrate is weighed out, sampled and shipped as a lot with its certificate. The buyer’s assay and any umpire result are filed against it.
Industry reports to connect with
- Feed tonnes and grade by stockpile block and blend
- Recovery and mass balance by shift, day and lot
- Assays awaited and assays released, by sample point
- Reagent and grinding media use per tonne milled, by circuit
Questions before implementation.
When should mineral processing companies consider goods receipt (grn)?
Use when purchased physical goods need quantity and acceptance checks on arrival. Purchased goods arrive at a receiving location.
What should we bring to the requirements discussion?
Bring anonymised examples of Purchase order; Delivery note; Acceptance and storage rules. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.
Does this replace our existing business software?
The starting point is your current system and the gap you need to close. Record what physically arrives against a supplier order. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.
What is outside this module?
A goods receipt does not replace specialist inspection or approval of the supplier's invoice.
How are scope, price and rollout decided?
The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Receipt quantities link to the purchase order. Use this check when reviewing the first working version.
Related functions for mineral processing companies.
Discuss goods receipt (grn) for your business.
Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements