How the business operates.

Ore arrives from one or more pits and goes onto stockpiles by grade. The crusher, the mills and the flotation or leach circuit then turn it into a concentrate that a smelter or trader pays for by assay. Weights, moisture and assays decide the invoice. Small errors cost real money.

Ore receipt and stockpile blocks

Record each truck at the weighbridge with its source pit and haul ticket, and hold stockpile balances by block and grade for the blend plan.

Mill shift log

Operators enter feed rate, grind size, cyclone pressure, dosing and downtime by circuit, so a shift report builds itself from what was logged.

Sample register and assays

Track each composite from the sampler to the laboratory, with the assay result tied to the feed, concentrate or tailings lot it came from.

Metallurgical balance

Combine feed tonnes, assays and concentrate weights into recovery and mass balance by shift, day and lot. Gaps are flagged for review.

Reagent and consumables store

Issue collectors, frothers, lime and grinding media against a circuit and a shift, then read use per tonne milled.

Wear parts and maintenance

Hold running hours for mills, pumps, screens and conveyors, with planned liner changes and work orders raised from them.

Concentrate dispatch

Build each shipment lot with bag or bulk weights, moisture, sampling certificate and buyer reference, and keep the umpire assay that settles it.

Tailings dam inspection log

The tailings operator records pond level, freeboard, seepage and pipe condition on each round. Photos sit against the dam cell. A raised level goes to the plant manager the same day.

Stockpile survey reconciliation

Surveyors enter measured stockpile volumes and the density used. The record sets them against book tonnes from receipts and feed. Gaps reach the grade controller before blending starts.

Process water and discharge readings

The environment officer logs pH, turbidity and flow from each sampling point on the site. Readings stay beside the permit limit. Out-of-range values open an action for the shift metallurgist.

The records that hold the operation together.

  • Ore receipt and weighbridge. Record each load with source pit, haul ticket, gross, tare and net, and assign it to a stockpile block.
  • Stockpile blocks and blend plan. Hold balances by block and grade, plan the blend the loader follows, and subtract what is fed to the crusher.
  • Crusher and mill shift log. Capture feed rate, power draw, grind size, cyclone pressure and downtime with reasons for each circuit and shift.
  • Sample register. Number every composite, record the point and time it was cut, and follow it to the laboratory and back.
  • Assay results. Enter or load results for feed, concentrate and tailings, and tie each one to the lot it describes.
  • Metallurgical balance and recovery. Combine tonnes and assays into mass balance and recovery by shift, day and lot, with variances above your limit shown.
  • Reagent and grinding media store. Receive drums and media, issue them to a circuit and a shift, and read consumption per tonne milled.
  • Liner and maintenance planning. Hold running hours for mills, screens, pumps and conveyors, and raise work orders for liner and deck changes.

Operational bottlenecks to check

Feed tonnes and assays sit apart

The weighbridge ticket is in one file and the feed assay is in the laboratory system. Nobody can multiply tonnes by grade for a single stockpile block without retyping.

Recovery is worked out weeks late

A metallurgist rebuilds the mass balance from shift sheets after month end. By then the mill has run a different blend for days and the cause of a low recovery is gone.

Reagent use cannot be tied to a shift

Collector, frother and lime are drawn from the store in drums. The consumption per tonne milled is a guess because the drum issue and the mill log are never read together.

Liners and mill parts wear out unnoticed

Mill liners, pump impellers and screen decks are changed when something fails. The hours run since the last change are in a maintenance planner’s head.

Concentrate shipments differ from the contract

The buyer’s weight, moisture and assay come back different from yours. Without the sample split record and the lot history, the dispute is a matter of whose paper is trusted.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Ore receipt

    A truck crosses the weighbridge. The clerk records the source pit, the haul ticket and the block, and the grade controller assigns a stockpile position. The load is counted once.

  2. 2. Blend and feed

    The blend plan names which blocks the loader draws from. Feed tonnes entering the crusher are recorded and subtracted from the stockpile balances.

  3. 3. Shift operation

    Operators log throughput, grind size, dosing, tank levels and any stop with its reason for each circuit.

  4. 4. Sampling and assay

    Samplers cut composites from feed, concentrate and tailings. Each carries a number, goes to the laboratory and returns as an assay attached to its lot.

  5. 5. Balance

    Tonnes and assays combine into recovery and mass balance for the shift. Differences beyond the limits your metallurgist sets are flagged. Review follows.

  6. 6. Dispatch and settlement

    Concentrate is weighed out, sampled and shipped as a lot with its certificate. The buyer’s assay and any umpire result are filed against it.

Roles and responsibility boundaries.

For plant managers

Read feed, recovery, concentrate produced and stock held by shift and by month, with cost per tonne milled beside them. Dispatch and commercial staff settle each shipment from the assay on file.

For metallurgists

Review mass balance, flag variances and compare blends against recovery without rebuilding sheets. Nothing is rekeyed.

For shift supervisors and operators

Log throughput, dosing and stops from a phone or a control-room screen, and see sample requests waiting.

For laboratory staff

Receive numbered samples, enter assays and release results against the lot they belong to. Queues are visible.

For maintenance planners

See mill and pump hours, due liner changes and open work orders, and plan stops with the metallurgist.

Reports your managers need.

  • Feed tonnes and grade by stockpile block and blend
  • Recovery and mass balance by shift, day and lot
  • Assays awaited and assays released, by sample point
  • Reagent and grinding media use per tonne milled, by circuit
  • Mill and pump running hours against the next liner change
  • Concentrate stock and shipments by lot, with moisture and weights
  • Buyer and umpire assay differences by shipment

Connections to scope

  • Weighbridge output file
  • Laboratory results file
  • Email
  • SMS
  • WhatsApp or other messaging
  • Accounting export
  • Process historian export

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Circuits and sample points

Crushing, milling, flotation or leach stages and every sample point are entered as your plant runs them.

Balance formulae

The recovery and mass balance formulae your metallurgist uses are entered and checked against a past month before use.

Stockpile blocks

Block names, grade classes and blend rules follow your mine plan and your grade controller’s practice.

Laboratory link

Results are keyed in or loaded from the laboratory’s output file, as the laboratory prefers.

Contracts and units

Each buyer contract carries its own currency, tax treatment and weight unit, and a metallurgist checks them against one signed contract before go-live.

Hosting

We host it, so the control room, the assay laboratory and the head office read identical lots.

Limitations to settle before implementation

  • An open pit mine whose main job is drilling, blasting and hauling will find Mining Company Management Software closer.
  • A plant that only washes and screens aggregate by the lorry load can run on weighbridge software alone.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • A grade list with the specification for each
  • A sample and certificate routine
  • Standing order follow-up
  • Packing and dispatch records
  • Listings that match how buyers search
  • Cross-sale of related grades
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.