Production Planning for Mineral processing companies

Plan manufacturing quantities against demand, materials and capacity.

Manufacturing

Does this function belong in your operation?

Use when the business manufactures, assembles or prepares physical products.

Confirmed demand needs a production schedule.

The grade controller turns pit schedules and stockpile blocks into a blend plan for the crusher. Mill hours are set around planned liner changes. Shortfalls in feed grade show before the shift starts.

Bring the records the workflow depends on.

  • Demand and due dates
  • Material availability
  • Production capacity and calendars

Outputs to check

  • Demand-linked production schedule
  • Material and capacity exception list
  • Released-work requirement record

Follow the production planning workflow.

Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.

  1. 1. Collect demand

    Use confirmed orders and approved replenishment requirements.

  2. 2. Calculate output needs

    Apply the appropriate material and production definitions.

  3. 3. Check constraints

    Compare required materials and capacity with available resources.

  4. 4. Approve the sequence

    Set priorities and record any displaced or deferred work.

  5. 5. Release and monitor

    Create work-order handoffs and revise the plan using actual progress.

Who uses the module, and who approves?

Keep responsibilities distinct even when one person holds more than one role.

Production in-charge

Lays out the day or the week and adjusts it when a machine stops.

Storekeeper

Checks the materials required by released work and identifies shortages or unissued quantities.

Owner

Reads how much of the plan is being met, and where the same excuse keeps appearing.

Decide how exceptions are handled.

These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.

Material shortage

Identify the affected output and revise the release or purchasing action.

Machine unavailable

Reschedule the dependent work and check alternative capacity before confirming dates.

Urgent order inserted

Record which existing jobs move and obtain the required priority decision.

Can this work independently?

Planning needs demand, material definitions and capacity assumptions. These can be entered independently, but order, stock and work-order links keep the plan aligned with actuals. Releasing a plan does not issue material or record completed output; those execution steps need their own records.

Systems and records it connects with

  • Bill of materials: Approved component quantities and production-definition versions.
  • Work orders: Released production jobs, material issues and output records.
  • Stock: Item-location quantities and authorised stock movements.
  • Purchase orders: Authorised supplier commitments and open line balances.

Configure, test and introduce the workflow.

  • Walk us through machines, ovens or lines and the shifts they run. A written map of capacity comes back.
  • Tell us which items repeat daily. A set of standing quantities is returned for approval. Sales orders and stock arrive from your existing records. A trial plan appears for a sample day.
  • Overlap for a while. The floor uses the screen while the whiteboard stays up, and differences are noted.

Check the result before rollout.

Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.

  • Planned quantities reconcile with demand.
  • Shortages are visible before release.
  • Capacity assumptions are recorded.
Mineral processing companies

How the business operates.

Ore arrives from one or more pits and goes onto stockpiles by grade. The crusher, the mills and the flotation or leach circuit then turn it into a concentrate that a smelter or trader pays for by assay. Weights, moisture and assays decide the invoice. Small errors cost real money.

Ore receipt and stockpile blocks

Record each truck at the weighbridge with its source pit and haul ticket, and hold stockpile balances by block and grade for the blend plan.

Mill shift log

Operators enter feed rate, grind size, cyclone pressure, dosing and downtime by circuit, so a shift report builds itself from what was logged.

See the full industry workflow, reports and implementation plan →

The records that hold the operation together.

  • Ore receipt and weighbridge. Record each load with source pit, haul ticket, gross, tare and net, and assign it to a stockpile block.
  • Stockpile blocks and blend plan. Hold balances by block and grade, plan the blend the loader follows, and subtract what is fed to the crusher.
  • Crusher and mill shift log. Capture feed rate, power draw, grind size, cyclone pressure and downtime with reasons for each circuit and shift.
  • Sample register. Number every composite, record the point and time it was cut, and follow it to the laboratory and back.

Operational bottlenecks to check

Feed tonnes and assays sit apart

The weighbridge ticket is in one file and the feed assay is in the laboratory system. Nobody can multiply tonnes by grade for a single stockpile block without retyping.

Recovery is worked out weeks late

A metallurgist rebuilds the mass balance from shift sheets after month end. By then the mill has run a different blend for days and the cause of a low recovery is gone.

How work flows across this business

This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.

  1. 1. Ore receipt

    A truck crosses the weighbridge. The clerk records the source pit, the haul ticket and the block, and the grade controller assigns a stockpile position. The load is counted once.

  2. 2. Blend and feed

    The blend plan names which blocks the loader draws from. Feed tonnes entering the crusher are recorded and subtracted from the stockpile balances.

  3. 3. Shift operation

    Operators log throughput, grind size, dosing, tank levels and any stop with its reason for each circuit.

  4. 4. Sampling and assay

    Samplers cut composites from feed, concentrate and tailings. Each carries a number, goes to the laboratory and returns as an assay attached to its lot.

  5. 5. Balance

    Tonnes and assays combine into recovery and mass balance for the shift. Differences beyond the limits your metallurgist sets are flagged. Review follows.

  6. 6. Dispatch and settlement

    Concentrate is weighed out, sampled and shipped as a lot with its certificate. The buyer’s assay and any umpire result are filed against it.

Industry reports to connect with

  • Feed tonnes and grade by stockpile block and blend
  • Recovery and mass balance by shift, day and lot
  • Assays awaited and assays released, by sample point
  • Reagent and grinding media use per tonne milled, by circuit

Questions before implementation.

When should mineral processing companies consider production planning?

Use when the business manufactures, assembles or prepares physical products. Confirmed demand needs a production schedule.

What should we bring to the requirements discussion?

Bring anonymised examples of Demand and due dates; Material availability; Production capacity and calendars. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.

Does this replace our existing business software?

The starting point is your current system and the gap you need to close. Plan manufacturing quantities against demand, materials and capacity. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.

What is outside this module?

Production output depends on actual materials, equipment and execution. The plan records assumptions and revised decisions as those conditions change.

How are scope, price and rollout decided?

The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Planned quantities reconcile with demand. Use this check when reviewing the first working version.

Talk to us

Discuss production planning for your business.

Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.