Work Order Management for Mineral processing companies
Track a production job from material issue to completed output.
Does this function belong in your operation?
Use when physical production needs a job-level record of materials and output.
A production plan releases a specific job.
A relining job or a cyclone swap becomes one order with its crew, its parts from the wear store and its stop time. Supervisors see which mill is down. Completed orders close with hours spent.
Bring the records the workflow depends on.
- Required output
- Approved material list
- Process steps and due dates
Outputs to check
- Released production-job record
- Material and output reconciliation
- Work-in-progress and variance list
Follow the work order management workflow.
Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.
Who uses the module, and who approves?
Keep responsibilities distinct even when one person holds more than one role.
Decide how exceptions are handled.
These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.
Can this work independently?
A work order needs an output definition and process instructions. It can use entered materials and progress, but bill-of-materials, stock and quality links make execution traceable. Sales orders provide demand; closing production is not the same as dispatching or invoicing the finished goods.
Systems and records it connects with
- Bill of materials: Approved component quantities and production-definition versions.
- Production planning: Demand, planned quantities and resource or material constraints.
- Stock: Item-location quantities and authorised stock movements.
- Job work delivery notes: Material dispatch and return references for outside processing.
Configure, test and introduce the workflow.
- Tell us the stages a job passes through, in your words. A stage list comes back to confirm.
- Sales orders are connected, and so is the bill of materials. A sample work order draws on each. A screen shows jobs by stage. The supervisor tries it beside the whiteboard.
- Supervisors and the store use live work orders. The whiteboard is retired after a trial period.
Check the result before rollout.
Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.
- Output links to its work order.
- Material usage is traceable.
- Unfinished quantities remain visible.
How the business operates.
Ore arrives from one or more pits and goes onto stockpiles by grade. The crusher, the mills and the flotation or leach circuit then turn it into a concentrate that a smelter or trader pays for by assay. Weights, moisture and assays decide the invoice. Small errors cost real money.
The records that hold the operation together.
- Ore receipt and weighbridge. Record each load with source pit, haul ticket, gross, tare and net, and assign it to a stockpile block.
- Stockpile blocks and blend plan. Hold balances by block and grade, plan the blend the loader follows, and subtract what is fed to the crusher.
- Crusher and mill shift log. Capture feed rate, power draw, grind size, cyclone pressure and downtime with reasons for each circuit and shift.
- Sample register. Number every composite, record the point and time it was cut, and follow it to the laboratory and back.
Operational bottlenecks to check
Feed tonnes and assays sit apart
The weighbridge ticket is in one file and the feed assay is in the laboratory system. Nobody can multiply tonnes by grade for a single stockpile block without retyping.
Recovery is worked out weeks late
A metallurgist rebuilds the mass balance from shift sheets after month end. By then the mill has run a different blend for days and the cause of a low recovery is gone.
How work flows across this business
This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.
1. Ore receipt
A truck crosses the weighbridge. The clerk records the source pit, the haul ticket and the block, and the grade controller assigns a stockpile position. The load is counted once.
2. Blend and feed
The blend plan names which blocks the loader draws from. Feed tonnes entering the crusher are recorded and subtracted from the stockpile balances.
3. Shift operation
Operators log throughput, grind size, dosing, tank levels and any stop with its reason for each circuit.
4. Sampling and assay
Samplers cut composites from feed, concentrate and tailings. Each carries a number, goes to the laboratory and returns as an assay attached to its lot.
5. Balance
Tonnes and assays combine into recovery and mass balance for the shift. Differences beyond the limits your metallurgist sets are flagged. Review follows.
6. Dispatch and settlement
Concentrate is weighed out, sampled and shipped as a lot with its certificate. The buyer’s assay and any umpire result are filed against it.
Industry reports to connect with
- Feed tonnes and grade by stockpile block and blend
- Recovery and mass balance by shift, day and lot
- Assays awaited and assays released, by sample point
- Reagent and grinding media use per tonne milled, by circuit
Questions before implementation.
When should mineral processing companies consider work order management?
Use when physical production needs a job-level record of materials and output. A production plan releases a specific job.
What should we bring to the requirements discussion?
Bring anonymised examples of Required output; Approved material list; Process steps and due dates. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.
Does this replace our existing business software?
The starting point is your current system and the gap you need to close. Track a production job from material issue to completed output. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.
What is outside this module?
This is a production work order; field repairs and customer visits belong in job cards.
How are scope, price and rollout decided?
The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Output links to its work order. Use this check when reviewing the first working version.
Related functions for mineral processing companies.
Discuss work order management for your business.
Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements