Skip to main content
GullySystem
Manufacturing

Project Document Management for PCB manufacturers

Keep project documents tied to the correct job, revision and approval.

Project Management

Does this function belong in your operation?

Use when project work depends on drawings, specifications, approvals or shared files.

A project file is issued, revised or approved.

Gerber, drill and netlist files arrive in zipped sets, one per revision. Fabrication drawings and customer notes sit beside the files they relate to. CAM staff open the latest revision without hunting.

Bring the records the workflow depends on.

  • Project references
  • Document types
  • Revision and access rules

Outputs to check

  • Issued project-document register
  • Revision and approval history
  • Pending-review list

Follow the project document management workflow.

Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.

  1. 1. Register the submission

    Identify project, document type, revision and author.

  2. 2. Check completeness

    Confirm the file and supporting references are ready for review.

  3. 3. Collect approval

    Record reviewer comments and the authorised decision.

  4. 4. Issue the version

    Make the approved copy identifiable to its permitted audience.

  5. 5. Control replacement

    Retain superseded files and notify affected work owners of the change.

Who uses the module, and who approves?

Keep responsibilities distinct even when one person holds more than one role.

Document author

Submits the file with its project, revision and purpose, and identifies what changed.

Reviewer or project manager

Checks the submission, records the decision and decides which version may be issued.

Project team member

Uses the issued version and raises discrepancies without overwriting the approved source.

Decide how exceptions are handled.

These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.

Superseded file used

Identify affected work and notify the responsible project owner before replacing the issued reference.

Conflicting reviewer comments

Retain both responses and require an authorised resolution.

External party loses access

Revoke sharing without deleting the project's approval evidence.

Can this work independently?

A project document library can operate independently with project identifiers and access roles. Tasks and timelines link to approved files, while a client portal controls external sharing. Uploading a drawing does not approve it for construction, manufacture or another regulated use.

Systems and records it connects with

  • Task management: Assigned work, due dates and completion evidence.
  • Project timelines with Gantt charts: Planned dates, dependencies and recorded milestone progress.
  • Client portal: Permitted customer documents, requests and account views.
  • Contract management: Operative agreement terms, amendments and obligation dates.

Configure, test and introduce the workflow.

  • You show how projects are filed today. You get a proposed folder layout that follows your office naming.
  • Documents from a running project are loaded with their revisions. You check that the current ones are marked correctly. Revisions are the usual trap. You decide what clients, vendors and staff see. Each group gets a test login.
  • Site staff upload photographs and drawings from their phones. The routine is shown on site. Further projects are brought across in turn. The old chat folders are marked as closed.

Check the result before rollout.

Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.

  • Readers can identify the current approved version.
  • Project access prevents unrelated file disclosure.
  • Superseded versions remain traceable.
PCB manufacturers

How the business operates.

A bare board order starts as a set of files and ends as a stack of boards in a vacuum bag. In between, a panel passes a dozen wet and dry steps, and every step has its own scrap. One late revision can sink a lot.

Order and file revision register

Hold the buyer’s Gerber set, fabrication note and revision, so CAM and the floor never image from an outdated pack.

Engineering query tracker

Log each CAM question, send it to the buyer, record the answer and release the lot only when all queries are closed.

See the full industry workflow, reports and implementation plan →

The records that hold the operation together.

  • Enquiries and quotations. Price boards from layer count, size, panel utilisation, finish and quantity bands, with every revision of a quotation kept.
  • File revision register. Attach the Gerber set, drill file and fabrication note to the order with a revision letter, and show the floor only the released set.
  • Engineering queries. Raise a CAM question, send it to the buyer, record the answer and block the lot until the query is closed.
  • Stack-up and panel plans. Hold the laminate, prepreg and copper weight of each build, with boards per panel and panel size.

Operational bottlenecks to check

The wrong Gerber revision gets imaged

The buyer resends files after CAM has started, and the film is made from the old set while the new revision waits in an inbox that the floor never opens. The error shows only on the electrical test.

Engineering queries wait in email

A clearance question to the buyer sits unanswered while the lot waits for tooling. The planner cannot tell which orders are blocked on a reply.

How work flows across this business

This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.

  1. 1. Enquiry and quotation

    A buyer sends files and a fabrication note. The estimator checks layer count, size, finish and quantity, and prices from panel utilisation.

  2. 2. CAM review

    CAM checks clearances and drill data, raises engineering queries and lays out the panel. The order is released only after the buyer’s answers.

  3. 3. Lot creation

    A lot opens with the file revision, stack-up and a traveller by process step. Laminate and prepreg are issued against it.

  4. 4. Process steps

    Imaging, etch, lamination, drilling, plating, mask, legend, finish and routing are each logged with quantity in, quantity out and scrap reason.

  5. 5. Test and inspection

    Open and short test results are saved by board. Final inspection checks dimensions, finish and visual defects.

  6. 6. Packing and shipment

    Boards are counted, bagged and labelled with the date code. The certificate of conformance, test report and packing list are issued.

Industry reports to connect with

  • Yield by process step, by week and by board type
  • Orders waiting on engineering queries
  • Scrap reasons for drilling, plating and etching
  • Lots affected by a given bath change or press load

Questions before implementation.

When should pcb manufacturers consider project document management?

Use when project work depends on drawings, specifications, approvals or shared files. A project file is issued, revised or approved.

What should we bring to the requirements discussion?

Bring anonymised examples of Project references; Document types; Revision and access rules. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.

Does this replace our existing business software?

The starting point is your current system and the gap you need to close. Keep project documents tied to the correct job, revision and approval. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.

What is outside this module?

Engineering approval and contractual interpretation remain with the authorised professionals.

How are scope, price and rollout decided?

The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Readers can identify the current approved version. Use this check when reviewing the first working version.

Talk to us

Discuss project document management for your business.

Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements