Business solutions for PCB manufacturers
Explore software for work such as “Multilayer boards for industrial controllers”. Review each business function below, including when it fits and what to check before implementation.
How the business operates.
A bare board order starts as a set of files and ends as a stack of boards in a vacuum bag. In between, a panel passes a dozen wet and dry steps, and every step has its own scrap. One late revision can sink a lot.
The records that hold the operation together.
- Enquiries and quotations. Price boards from layer count, size, panel utilisation, finish and quantity bands, with every revision of a quotation kept.
- File revision register. Attach the Gerber set, drill file and fabrication note to the order with a revision letter, and show the floor only the released set.
- Engineering queries. Raise a CAM question, send it to the buyer, record the answer and block the lot until the query is closed.
- Stack-up and panel plans. Hold the laminate, prepreg and copper weight of each build, with boards per panel and panel size.
- Lots and process travellers. Follow a lot from inner layer to routing, logging panels in, panels out and the operator who signed off each step.
- Step scrap and running yield. Log scrap with a reason at the step where it happened, and read the running yield of a lot.
- Plating bath and press logs. Link bath changes and lamination press loads to the lots that went through them, so a defect can be traced to its group.
- Electrical test results. Store open and short outcomes per board, failed board numbers and rework decisions against the lot.
Operational bottlenecks to check
The wrong Gerber revision gets imaged
The buyer resends files after CAM has started, and the film is made from the old set while the new revision waits in an inbox that the floor never opens. The error shows only on the electrical test.
Engineering queries wait in email
A clearance question to the buyer sits unanswered while the lot waits for tooling. The planner cannot tell which orders are blocked on a reply.
Yield is known only at the end
Scrap from drilling, plating and etching is counted in different departments, each with its own count sheet and its own reasons. The loss on a lot is clear only after the whole run closes.
Chemical bath changes are not tied to lots
A plating bath is adjusted or dumped, and the panels that passed through it before and after look the same on paper. A later defect has no cause to point at.
Customer certificates are typed by hand
Every shipment needs a conformance certificate and a test report quoting lot, quantity and date code. Clerks copy these from three records.
Follow the work across teams.
This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.
Roles and responsibility boundaries.
Reports your managers need.
- Yield by process step, by week and by board type
- Orders waiting on engineering queries
- Scrap reasons for drilling, plating and etching
- Lots affected by a given bath change or press load
- Electrical test failures by lot and customer
- Laminate and prepreg stock against open lots
- Quoted against actual panel utilisation
Connections to scope
- Test equipment result files
- Accounting export
- SMS
Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.
Setup decisions and adoption risks.
Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.
Limitations to settle before implementation
- Firms that buy bare boards and populate them will find PCB Assembly Company Management Software closer.
- A hobby prototyping bench that sends boards to an outside fabricator can run without it.
Modules to consider first.
These functions connect to the operating model above. Confirm each one against the work your business actually runs.
Choose the operation you want to improve.
Use these activities to explain your scope. Your business does not need every function in the directory.
- Multilayer boards for industrial controllers
- Metal-core boards for LED and power supplies
- Prototype and quick-turn orders from startups
- Flex and rigid-flex boards for compact devices
- HDI boards for telecom and networking equipment
- Automotive and EV board qualification
- Panelised volume lots for EMS companies
- Board sets for defence and aerospace programmes
Explore the business functions.
Production, stock, fleet and recurring billing functions apply only where your business runs those activities. Read the suitability conditions on each page.
Manufacturing
Batch and Serial Tracking
Trace goods using batch identifiers or individual serial numbers.
View workflow and suitability →Quality Control
Record specified inspections and the disposition of checked goods.
View workflow and suitability →Work Order Management
Track a production job from material issue to completed output.
View workflow and suitability →
Finance & Accounting
CRM
Project Management
Inventory Management
Platform
Start with the problem your team can describe.
Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements