Skip to main content
GullySystem
Manufacturing

Work Order Management for PCB manufacturers

Track a production job from material issue to completed output.

Manufacturing

Does this function belong in your operation?

Use when physical production needs a job-level record of materials and output.

A production plan releases a specific job.

A traveller moves with each panel lot through imaging, lamination, drilling, plating, mask and finish. Operators sign each step with a start and end time. A held lot shows where it is stuck.

Bring the records the workflow depends on.

  • Required output
  • Approved material list
  • Process steps and due dates

Outputs to check

  • Released production-job record
  • Material and output reconciliation
  • Work-in-progress and variance list

Follow the work order management workflow.

Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.

  1. 1. Release the job

    Record output quantity, instructions and the approved material version.

  2. 2. Issue resources

    Link materials and assigned production stages to the work order.

  3. 3. Record progress

    Capture completed operations, interruptions and additional material requests.

  4. 4. Inspect output

    Pass the produced quantity to the agreed quality or acceptance check.

  5. 5. Close the job

    Reconcile accepted output, scrap, unused material and unfinished quantities.

Who uses the module, and who approves?

Keep responsibilities distinct even when one person holds more than one role.

Production in-charge

Releases jobs, moves them between stages, and holds the ones waiting on material with a reason typed in.

Supervisor

Marks the stage done from a tablet near the machine.

Storekeeper

Issues material against the job number and sees what is still due to it.

Owner

Looks at what is late, and at what is late for the same reason every week.

Decide how exceptions are handled.

These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.

Material issued beyond plan

Record the reason and obtain the required approval.

Output below target

Keep the uncompleted balance or close it with an authorised shortfall reason.

Job paused mid-process

Retain work-in-progress quantities and the stage from which work will resume.

Can this work independently?

A work order needs an output definition and process instructions. It can use entered materials and progress, but bill-of-materials, stock and quality links make execution traceable. Sales orders provide demand; closing production is not the same as dispatching or invoicing the finished goods.

Systems and records it connects with

  • Bill of materials: Approved component quantities and production-definition versions.
  • Production planning: Demand, planned quantities and resource or material constraints.
  • Stock: Item-location quantities and authorised stock movements.
  • Job work delivery notes: Material dispatch and return references for outside processing.

Configure, test and introduce the workflow.

  • Tell us the stages a job passes through, in your words. A stage list comes back to confirm.
  • Sales orders are connected, and so is the bill of materials. A sample work order draws on each. A screen shows jobs by stage. The supervisor tries it beside the whiteboard.
  • Supervisors and the store use live work orders. The whiteboard is retired after a trial period.

Check the result before rollout.

Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.

  • Output links to its work order.
  • Material usage is traceable.
  • Unfinished quantities remain visible.
PCB manufacturers

How the business operates.

A bare board order starts as a set of files and ends as a stack of boards in a vacuum bag. In between, a panel passes a dozen wet and dry steps, and every step has its own scrap. One late revision can sink a lot.

Order and file revision register

Hold the buyer’s Gerber set, fabrication note and revision, so CAM and the floor never image from an outdated pack.

Engineering query tracker

Log each CAM question, send it to the buyer, record the answer and release the lot only when all queries are closed.

See the full industry workflow, reports and implementation plan →

The records that hold the operation together.

  • Enquiries and quotations. Price boards from layer count, size, panel utilisation, finish and quantity bands, with every revision of a quotation kept.
  • File revision register. Attach the Gerber set, drill file and fabrication note to the order with a revision letter, and show the floor only the released set.
  • Engineering queries. Raise a CAM question, send it to the buyer, record the answer and block the lot until the query is closed.
  • Stack-up and panel plans. Hold the laminate, prepreg and copper weight of each build, with boards per panel and panel size.

Operational bottlenecks to check

The wrong Gerber revision gets imaged

The buyer resends files after CAM has started, and the film is made from the old set while the new revision waits in an inbox that the floor never opens. The error shows only on the electrical test.

Engineering queries wait in email

A clearance question to the buyer sits unanswered while the lot waits for tooling. The planner cannot tell which orders are blocked on a reply.

How work flows across this business

This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.

  1. 1. Enquiry and quotation

    A buyer sends files and a fabrication note. The estimator checks layer count, size, finish and quantity, and prices from panel utilisation.

  2. 2. CAM review

    CAM checks clearances and drill data, raises engineering queries and lays out the panel. The order is released only after the buyer’s answers.

  3. 3. Lot creation

    A lot opens with the file revision, stack-up and a traveller by process step. Laminate and prepreg are issued against it.

  4. 4. Process steps

    Imaging, etch, lamination, drilling, plating, mask, legend, finish and routing are each logged with quantity in, quantity out and scrap reason.

  5. 5. Test and inspection

    Open and short test results are saved by board. Final inspection checks dimensions, finish and visual defects.

  6. 6. Packing and shipment

    Boards are counted, bagged and labelled with the date code. The certificate of conformance, test report and packing list are issued.

Industry reports to connect with

  • Yield by process step, by week and by board type
  • Orders waiting on engineering queries
  • Scrap reasons for drilling, plating and etching
  • Lots affected by a given bath change or press load

Questions before implementation.

When should pcb manufacturers consider work order management?

Use when physical production needs a job-level record of materials and output. A production plan releases a specific job.

What should we bring to the requirements discussion?

Bring anonymised examples of Required output; Approved material list; Process steps and due dates. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.

Does this replace our existing business software?

The starting point is your current system and the gap you need to close. Track a production job from material issue to completed output. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.

What is outside this module?

This is a production work order; field repairs and customer visits belong in job cards.

How are scope, price and rollout decided?

The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Output links to its work order. Use this check when reviewing the first working version.

Talk to us

Discuss work order management for your business.

Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements