Skip to main content
GullySystem
Retail

Business solutions for Plywood and timber dealers

Explore software for work such as “BWP and marine plywood for kitchens and bathrooms”. Review each business function below, including when it fits and what to check before implementation.

Plywood and timber dealers

How the business operates.

Your counter serves three kinds of buyer. The carpenter buys every second day, the contractor buys on credit for a distant site, and the interior designer brings a client to touch laminates for an hour.

Sheets by brand, grade, size and thickness

Hold moisture-resistant (MR), boiling-water-resistant (BWR) and boiling-waterproof (BWP) plywood, block board, flush doors and pre-laminated boards as separate items. Chipped sheets and cut pieces are counted apart.

Laminates, veneers and edge band

Keep laminate codes, face veneers and ABS or PVC edge band against their brand and finish, so the designer is shown what is actually on the rack.

Rate list by kind of buyer

Keep carpenter, contractor and retail rates as separate lists, each rate carrying the date it applies from, so old bills keep the old rate.

Timber by cubic feet

This part is custom work on top of the yard stock. Logs and sawn sizes convert to cubic feet, with cutting and wastage recorded against the order.

Contractor credit by site

Group bills by contractor and by site, with a credit limit and an overdue list, so the weekly follow-up starts from a page and not from memory.

Carpenter and designer points

A points ledger is written for you separately, with points or commission recorded on each bill.

Depot schemes and claims

Purchases are recorded with freight and unloading. Tracking depot schemes and claims until they settle is a custom addition.

Timber pass and transit record

Permits for moving sawn timber are stored with the species, volume and vehicle. The yard manager checks them before a load leaves. Expiry dates show on the day’s dispatch list.

Cutting and sizing service

Boards cut to a carpenter’s sizes are logged with the sheet used, pieces cut and offcuts left. Billing adds the cutting fee. Offcuts return to stock as odd sizes.

Damaged and moisture-affected stock

Warped sheets, delaminated boards and wet timber are recorded by brand and lot. The owner decides on discount or claim. A claim to the company carries the photo and bill.

The records that hold the operation together.

  • Board brand, grade, dimensions and thickness
  • Timber specification, dimensions and volume basis
  • Buyer rate, contractor account and site
  • Cutting instruction, delivered pieces and offcut record
  • Delivery acknowledgement, credit balance and supplier claim

Operational bottlenecks to check

Stock by size and grade is never right

Your accounting package shows one plywood total. It cannot show the available quantity of 8x4 sheets of 18 mm marine ply, so the counter cannot confirm the sale.

Rates change faster than the list

A depot price rise or a new scheme lands on Monday, staff quote Friday’s rate all week, and the gap comes out of your margin. It surfaces at stock-taking.

Contractor credit runs too long

Bills for four sites under one contractor pile up quietly in the running account. Nobody follows up until the figure is large enough to worry everyone.

Carpenter points turn into arguments

Points promised on purchases are worked out from memory, and the carpenter remembers a bigger number than you do. The carpenter takes the next order elsewhere.

Depot claims are never collected in full

Scheme discounts, damaged-sheet claims and short deliveries are raised on a call and then forgotten. The depot settles what you can prove.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Confirm the material specification

    Record the exact board or timber requirement and its units. Keep a proposed substitution visible for the buyer’s approval.

  2. 2. Check stock and credit

    Identify available stock and the customer’s agreed rate and credit position before releasing the order.

  3. 3. Pick or cut the material

    Record the pieces or sheets issued and any authorised cutting. Keep remaining material and damaged stock distinct from delivered quantity.

  4. 4. Deliver to the correct site

    Record what was loaded, accepted, short or returned against the contractor’s site and delivery reference.

  5. 5. Reconcile the account

    Allocate customer receipts and approved adjustments, and follow supplier claims separately from credits actually received.

Roles and responsibility boundaries.

Counter and contractor-account team

Records the requested boards or timber, applicable buyer rate and contractor site before confirming the order.

Yard and cutting team

Controls stock by material specification, records cutting or sizing and identifies damaged stock and usable offcuts.

Delivery and accounts teams

Reconciles loaded and accepted quantities, site credit, customer receipts and supported supplier claims.

Reports your managers need.

  • Board stock by grade, size and thickness
  • Timber pieces, volume and usable offcuts
  • Contractor outstanding by site
  • Delivery differences, damage and supplier claims

Connections to scope

  • Accounting: site invoices, receipts and approved credits
  • Stock and cutting records: actual quantities and remaining material
  • Supplier records: accepted claims and relevant transport-document references

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Agree measurement rules

Define sheet, piece, length and volume units and the conversions used for the materials actually sold.

Trial a cut-and-deliver order

Reconcile the starting stock, cut pieces, offcuts, site delivery and invoice using a real specification.

Train substitution and credit handling

Agree who authorises grade changes, credit exceptions and damage adjustments before staff use live balances.

Limitations to settle before implementation

  • Material grade and condition are established through the business’s inspection process, not the item description alone.
  • Carpenter incentives, timber-specific documents and depot-claim workflows require explicit scope where absent from the chosen trading product.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • BWP and marine plywood for kitchens and bathrooms
  • MR and commercial plywood for wardrobes and furniture
  • Laminates and veneers through interior designers
  • Teak and hardwood main doors and frames
  • Imported pine and rubber wood for furniture workshops
  • Flush doors for builder projects
  • Shuttering ply for construction sites
  • MDF and particle board for modular furniture makers
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements