Skip to main content
GullySystem
Other industries

Business solutions for Signage companies

Explore software for work such as “Shop front ACP boards with LED letters”. Review each business function below, including when it fits and what to check before implementation.

Signage companies

How the business operates.

One order from a retail chain can mean forty boards at forty addresses, each with its own size, landlord and permission letter. Excel cracks around the tenth, and by the fifteenth the office is ringing crews.

Site measurement sheet

Let the surveyor record sizes, mounting surface, power point and photos on a phone form tied to the job, so the workshop cuts from a record.

Rate card and per square foot quotation

Hold separate rates for flex, ACP, acrylic letters, LED modules and installation, and build the quote from them with the mock-up attached for approval.

Workshop job card

List what to fabricate, which material was issued and who is on it, with a status the office can see.

Outside job work

Record routing, laser cutting or large format printing given to an outside fabricator against the job, with what it cost you.

Installation photo and sign-off

Let the crew add the installed photo and the client’s sign-off from the site, before they leave.

Branch rollout tracker

Show every location in an order in one view, marked measured, approved, fabricated, installed and billed.

Repair and service calls

Log a dead LED module or a board loosened by rain against the original job, so the crew is told what was fitted there.

Artwork and mock-up approval log

Keeps each mock-up version sent to a client with the date, the changes asked and the approval received. The workshop cuts only from an approved version. Superseded artwork is marked.

Permission and municipal licence tracker

Records the licence or landlord permission needed for each hoarding or fascia, with the application date and expiry. Sales staff see what blocks installation. Renewal dates are listed.

Vehicle and ladder crew roster

Lists the crews, vans, ladders, lifts and safety harnesses assigned to each day’s installations. Supervisors avoid double bookings. Equipment needing inspection is held back from the roster until checked.

The records that hold the operation together.

  • Site survey and measurements. Record sizes, mounting surface, height, power point and photos on a phone form tied to the enquiry, so the workshop cuts from a record.
  • Quotations and rate card. Build quotations from square foot rates for flex, ACP, acrylic, letters and lighting, with installation and transport added as lines.
  • Artwork and mock-up approval. Keep each mock-up version, the client’s changes and the approved file together, so cutting starts only from the approved artwork.
  • Workshop job cards. Give the workshop one card per job with sizes, materials, finish and steps, and mark fabrication and printing stages as they complete.
  • Material stock and offcuts. Track ACP sheets, flex rolls, acrylic, LED modules and power supplies against jobs, with reorder levels and reusable offcuts listed.
  • Outside vendor jobs. Record printing, laser cutting, powder coating or CNC work sent to outside vendors, with what went out, what came back and the vendor’s bill.
  • Installation crew schedule. Assign crews to sites by date, with address, scaffolding or ladder need, job sheet and the installed photo collected on completion.
  • Branch rollout tracker. Follow a multi-store order store by store, from survey to permission letter, fabrication, installation and client sign-off.

Operational bottlenecks to check

The board does not fit

Sizes come as a photo of a paper sketch, one figure is read as eight where it said three, and a sheet of ACP becomes scrap. Time and material are lost.

Rollouts lose their thread

A client asks which of their thirty stores are live, and the answer takes a day of phone calls.

Stock never matches the register

ACP sheets, vinyl rolls and LED modules go out for one job and get used on another, and offcuts are never booked back. A rush order then stops for want of one module.

Billing waits on a photo

Crews forget to send the installed-board picture, and a week of billing waits behind it. Cash is delayed.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Enquiry and site visit

    A client asks for a fascia, a glow sign, acrylic letters or a flex banner. The surveyor records sizes, mounting surface, height and photos on a phone form against the enquiry.

  2. 2. Quotation

    The quotation is built from your square foot rates for material, lighting and installation. The artwork mock-up goes with it for the client to approve.

  3. 3. Job card

    A confirmed quotation becomes a job card with the approved artwork, final sizes, material list and delivery date. The workshop cuts from this record.

  4. 4. Fabrication and printing

    Material is issued against the job. Printing and fabrication steps are marked as they finish, including any work sent to an outside printer or fabricator.

  5. 5. Installation

    The crew gets the address, scaffolding or ladder need and the job sheet. They add the installed photo and the client’s sign-off from the site.

  6. 6. Billing and service

    The tax invoice comes off the job as quoted, with any variation noted. Later repair calls attach to the same sign.

Roles and responsibility boundaries.

For owners

See jobs by stage, quotations awaiting reply, money pending against installed boards and material running low.

For the sales and estimating team

Prepare quotations from the rate card, follow up open ones and see which surveys are still to be done.

For surveyors

Open the day’s site visits on a phone and record sizes, mounting details and photos at the wall.

For the workshop

Read the job card, see approved artwork and material issued, and mark each fabrication step as it finishes.

For installation crews

See the address, the job sheet and the site contact for the day, then add the installed photo and sign-off.

Reports your managers need.

  • Jobs by stage, from survey to installed
  • Quotations sent, converted and still awaiting reply
  • Material stock to reorder and sheets used per job
  • Installations due and crew days booked
  • Invoices held for a completion photo
  • Branch rollout position by client and store
  • Repair calls open and chargeable

Connections to scope

  • WhatsApp
  • SMS
  • Email
  • Payment links and gateway
  • Accounting export

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Your rate card and board types

Flex, vinyl, ACP, acrylic letters, LED boards and your per square foot rates go in first, so quotations match how you price.

Survey form and job card layout

The measurement form and the workshop job card are set to the fields your surveyors and fabricators already use.

Clients, quotations and running jobs

Client lists, open quotations and running jobs come across from your register or spreadsheet before the first day of use.

Crews and vendors

Installation crews, outside printers and fabricators are set up with how you pay and track them today.

Hosting and changes

GullySystem hosts the system. Our team handles any change to rates, job stages or invoice layout when you ask.

Limitations to settle before implementation

  • A painter of hand-lettered boards who works a few shops a week is well served by a diary and a rate list.
  • Offset and digital printing presses with large print runs fit a printing-press product better than this one.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Shop front ACP boards with LED letters
  • Franchise and multi-outlet signage rollouts
  • Corporate office reception and wayfinding signs
  • Builder site hoardings and project branding
  • Hospital and school directional signage
  • Neon signs for cafes and restaurants
  • Digital signage screens and standees
  • Signboard repair and annual maintenance contracts
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements