Skip to main content
GullySystem
Real estate and construction

Invoice Management for Waterproofing contractors

Create and track invoices against billed goods or work.

Finance & Accounting

Does this function belong in your operation?

Use when bills need links to orders, delivery or completed work.

A supply or milestone becomes billable.

Bills follow stages such as surface preparation, primer and final coat, with retention held back. A basement tanking job is billed on completed area. Retention release is dated against the warranty.

Bring the records the workflow depends on.

  • Customer details
  • Approved billing lines
  • Numbering and tax settings

Outputs to check

  • Issued invoice register
  • Customer outstanding statement
  • Billing and receipt reconciliation

Follow the invoice management workflow.

Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.

  1. 1. Identify billable work

    Use the approved order, delivery or milestone reference.

  2. 2. Prepare invoice lines

    Check customer details, quantities, rates and tax settings.

  3. 3. Approve and issue

    Assign the authorised number and retain the issued document.

  4. 4. Send required handoffs

    Pass applicable documents to accounting or electronic registration processes.

  5. 5. Track settlement

    Allocate receipts and handle disputes or credits without overwriting the issued invoice.

Who uses the module, and who approves?

Keep responsibilities distinct even when one person holds more than one role.

Accounts assistant

Raises the day’s bills, applies receipts and works the overdue list from the top.

Sales executive

Sees whether their customer has paid before they ask for the next order. It saves an awkward conversation.

Owner

Sees what was billed this month, what was collected, and the difference still outstanding.

Decide how exceptions are handled.

These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.

Duplicate billing request

Check the source order or milestone before creating another invoice.

Customer disputes a line

Retain the issued document and use the approved correction or credit process.

Partial payment

Allocate the receipt and leave the remaining amount outstanding without marking the invoice fully settled.

Can this work independently?

Invoicing can work from entered approved lines without order or stock modules. Connections bring in accepted quantities and pass receivables to accounting. e-Invoicing, payment collection and stock dispatch are distinct processes; issuing a bill does not confirm any of them occurred.

Systems and records it connects with

  • Receipts management: Recorded customer payments and invoice allocations.
  • E-invoicing: Applicable invoice-registration references and response status.
  • Credit control: Customer limits, current exposure and authorised order releases.
  • Accounting software: Posted financial entries and reconciliation references.

Configure, test and introduce the workflow.

  • Send sample invoices and your numbering. Staff see a list of tax details and the layout to match.
  • Confirm the face of the bill. A test invoice from a test order comes back for inspection. Share unpaid bills and customer balances. They load as a trial and show on the overdue list for accounts to check.
  • Sales and accounts staff practise on test orders. Short sheets for each role follow. The new series begins on the date you fix. The first overdue list is reviewed together.

Check the result before rollout.

Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.

  • Invoice numbers are unique.
  • Totals reconcile with approved lines.
  • Partial payments leave accurate balances.
Waterproofing contractors

How the business operates.

Nobody judges waterproofing on the day. They judge it in the rain. Your warranty record needs the material applied, covered area and application date.

Leak inspection report

Record photos, moisture spots, the area measured and the likely source on a phone, standing on the terrace. The report is done on site.

Treatment quote by system

Quote by area and treatment type, with surface preparation, number of coats and the warranty period listed.

See the full industry workflow, reports and implementation plan →

The records that hold the operation together.

  • Enquiries and leak complaints. Log enquiries from clients, builders and referrers, with the address, the type of leak and the inspection visit assigned. A tender request from a builder keeps its own due date.
  • Site inspection records. Record measurements, surface condition, damp patches, cracks, expansion joints and photographs for each area before anything is quoted, so the supervisor’s notes travel with the estimate to the office.
  • Quotations by area and system. Price terrace, bathroom, basement, sump and tank work from measured square feet and the treatment system chosen for each area, whether membrane, slurry, injection grout or crystalline coating.
  • Treatment stage records. Log hacking, surface preparation, primer, coats, mesh and protection screed as each stage is finished, with the date and the crew, so a skipped stage shows.

Operational bottlenecks to check

What was applied cannot be proved

There is no record of the coats, the client says the leak came from your work, and nothing shows the ponding test ever happened.

Re-visits are free and endless

Every wet season brings calls from jobs finished years ago, and nobody checks whether the leak is even in the area you treated. The crew goes out anyway.

How work flows across this business

This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.

  1. 1. Enquiry

    A leak complaint or a builder’s tender request is logged with the address, the area affected and who referred it. An inspection visit is booked for a supervisor, who carries a moisture meter and a tape.

  2. 2. Inspection

    The supervisor records measurements, the surface, cracks, damp patches, expansion joints and any earlier treatment, with photographs for each area, so the quotation starts from facts and not from a guess.

  3. 3. Quotation

    The estimator picks the treatment system for each area, such as polyurethane membrane, cementitious slurry or crystalline coating, and prices it from the measured square feet. The client receives the quotation and the proposed warranty terms.

  4. 4. Treatment

    Crew are assigned to the job and material is issued from the store. Each stage is logged as it is finished, from hacking and surface preparation to the final coat and protection screed.

  5. 5. Test and handover

    The ponding test is recorded with start and end times and the result. The client signs the handover, and the warranty register opens for that area.

  6. 6. After the job

    Stage bills and retention are followed up. Leak callbacks within the warranty are logged against the original treatment, and warranty end dates raise a reminder for the office to call the client.

Industry reports to connect with

  • Enquiries by source and quotations converted
  • Jobs in progress by stage and crew
  • Material issued against quoted use, by site
  • Warranties ending soon, by client and area

Questions before implementation.

When should waterproofing contractors consider invoice management?

Use when bills need links to orders, delivery or completed work. A supply or milestone becomes billable.

What should we bring to the requirements discussion?

Bring anonymised examples of Customer details; Approved billing lines; Numbering and tax settings. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.

Does this replace our existing business software?

The starting point is your current system and the gap you need to close. Create and track invoices against billed goods or work. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.

What is outside this module?

Your accountant confirms tax treatment and invoice requirements.

How are scope, price and rollout decided?

The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Invoice numbers are unique. Use this check when reviewing the first working version.

Talk to us

Discuss invoice management for your business.

Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements