Skip to main content
GullySystem
Real estate and construction

Business solutions for Waterproofing contractors

Explore software for work such as “Photographs of waterproofing at each layer, before cover”. Review each business function below, including when it fits and what to check before implementation.

Waterproofing contractors

How the business operates.

Nobody judges waterproofing on the day. They judge it in the rain. Your warranty record needs the material applied, covered area and application date.

Leak inspection report

Record photos, moisture spots, the area measured and the likely source on a phone, standing on the terrace. The report is done on site.

Treatment quote by system

Quote by area and treatment type, with surface preparation, number of coats and the warranty period listed.

Job record with test photos

Log surface preparation, primer, each coat, the mesh and the protection screed, with the ponding test and its photographs. That is the file you want three years later.

Warranty register and re-visits

Record every warranty with its area and end date, so a wet-season complaint is checked before a crew is sent.

Material issue per job

Record chemicals and membranes issued and returned, and set each site’s use beside what the quotation allowed.

Crew and applicator day plan

Assign supervisors, applicators and helpers to sites by day, and see which jobs are waiting for a free crew.

Stage bills and retention

Raise advance, running and final bills against job stages, and keep the retention held by each builder in view.

Ponding test log

Records the date a terrace or tank was flooded for a test, the water depth and the level drop after the hold period. Photos of any damp patch are attached. Supervisors sign off before the screed is laid.

Applicator gang payments

Tracks each gang’s completed area and the rate agreed per square metre. Advances taken are set off against it. The accounts person pays only from the measured and approved quantity.

Monsoon seepage callout list

Collects the leak complaints that arrive when heavy rain starts, sorted by building and earlier warranty. The supervisor assigns visits by urgency. Customers hear when someone is coming.

The records that hold the operation together.

  • Enquiries and leak complaints. Log enquiries from clients, builders and referrers, with the address, the type of leak and the inspection visit assigned. A tender request from a builder keeps its own due date.
  • Site inspection records. Record measurements, surface condition, damp patches, cracks, expansion joints and photographs for each area before anything is quoted, so the supervisor’s notes travel with the estimate to the office.
  • Quotations by area and system. Price terrace, bathroom, basement, sump and tank work from measured square feet and the treatment system chosen for each area, whether membrane, slurry, injection grout or crystalline coating.
  • Treatment stage records. Log hacking, surface preparation, primer, coats, mesh and protection screed as each stage is finished, with the date and the crew, so a skipped stage shows.
  • Material issue and consumption. Issue coating pails, membrane rolls, cement, sealants and grout to a site, and compare use with what the quotation allowed. Over-use by one applicator is visible.
  • Crew and applicator scheduling. Assign supervisors, applicators and helpers to sites by day, and see which jobs are waiting for a free crew or for a dry spell between rains.
  • Ponding test and handover. Record the water-holding ponding test with its start time, end time and result, and take the client’s signature when a treated area is handed over. The warranty clock starts there.
  • Warranty register. Keep the system used, the handover date and the warranty terms for every treated area, with end dates that raise reminders weeks ahead so a renewal can be offered.

Operational bottlenecks to check

What was applied cannot be proved

There is no record of the coats, the client says the leak came from your work, and nothing shows the ponding test ever happened.

Re-visits are free and endless

Every wet season brings calls from jobs finished years ago, and nobody checks whether the leak is even in the area you treated. The crew goes out anyway.

Chemical use is a guess

Coating pails and membrane rolls go out and some come back part used, and the real cost of a job is not known until the year ends.

Retention is never chased

A running bill goes to the builder, retention is held against the warranty, and nobody follows it once the site closes.

The first heavy rains swamp the office

Dozens of calls a day come in, inspections are missed while the phone keeps ringing, and some of those callers go to a competitor.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Enquiry

    A leak complaint or a builder’s tender request is logged with the address, the area affected and who referred it. An inspection visit is booked for a supervisor, who carries a moisture meter and a tape.

  2. 2. Inspection

    The supervisor records measurements, the surface, cracks, damp patches, expansion joints and any earlier treatment, with photographs for each area, so the quotation starts from facts and not from a guess.

  3. 3. Quotation

    The estimator picks the treatment system for each area, such as polyurethane membrane, cementitious slurry or crystalline coating, and prices it from the measured square feet. The client receives the quotation and the proposed warranty terms.

  4. 4. Treatment

    Crew are assigned to the job and material is issued from the store. Each stage is logged as it is finished, from hacking and surface preparation to the final coat and protection screed.

  5. 5. Test and handover

    The ponding test is recorded with start and end times and the result. The client signs the handover, and the warranty register opens for that area.

  6. 6. After the job

    Stage bills and retention are followed up. Leak callbacks within the warranty are logged against the original treatment, and warranty end dates raise a reminder for the office to call the client.

Roles and responsibility boundaries.

For owners

See jobs on hand, quotations awaiting a reply, dues and retention outstanding, warranties ending soon and callbacks by treatment system, without ringing each supervisor.

For estimators

Open inspection notes, price each area, send the quotation and follow the enquiries that have not been answered. Chase the builder’s tender before it closes.

For site supervisors

See the day’s sites. Record stages and material, run the ponding test and take the client’s handover signature on the same phone before leaving the terrace.

For accounts

Raise stage bills, record receipts, follow retention held by builders and pass reports to the accountant at month end without retyping a single bill.

Reports your managers need.

  • Enquiries by source and quotations converted
  • Jobs in progress by stage and crew
  • Material issued against quoted use, by site
  • Warranties ending soon, by client and area
  • Leak callbacks by treatment system and supervisor
  • Dues and retention outstanding by client

Connections to scope

  • WhatsApp
  • SMS
  • Email
  • Payment links and gateway
  • Accounting package export

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Your treatment systems

The systems you apply, the coats each one needs and the material for each coat are set up as you quote them.

Rate list and measurement rules

Rates per square foot, how parapets and skirting are measured and what counts as an extra are entered the way you work.

Warranty terms

The warranty period for each system and what it covers are decided with you and stored against each treated area.

Open jobs and dues migrated

Jobs in progress, balances due and warranties still running are brought across from your register.

Hosting and changes

GullySystem hosts the system. When a treatment system, rate or warranty term changes, you ask and the GullySystem team updates it.

Limitations to settle before implementation

  • A single applicator who takes a few jobs a month and is paid in cash can manage with a notebook and WhatsApp.
  • A contractor whose work is mainly painting and finishing will find Painting Contractor Management Software fits that work better.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Photographs of waterproofing at each layer, before cover
  • Written scope for every leak survey
  • Approved applicator listings with brands you are trained on
  • Consultant and builder introductions for new projects
  • A reply routine for leak enquiries sent by WhatsApp
  • Follow-up on every quotation after committee meetings
  • A record of every job's guarantee period and its end date
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements