In this guide 7 sections
Measure only what the work record shows. Four numbers are enough: visits completed against visits scheduled, repeat complaints inside the warranty period, chemical used per job, and service reports closed with the customer’s sign-off. Nobody argues with a list of dates.
Agree What a Good Day Looks Like Before You Score Anyone
Six cockroach treatments in one apartment complex and two anti-termite jobs across the city make different days, so a raw job count punishes the technician with the longer route. Fix the standard first.
Write down, service by service, how long the treatment takes and how many fit into a day once travel is counted, using your own past work orders.
Show the technicians that standard before you measure anyone against it, because a number nobody agreed to reads plainly as a trap. Expect workarounds by month two.
The Measures Worth Keeping, and the Ones That Mislead
Take numbers from the visit record. If a number needs somebody’s opinion to produce it, it belongs in the review conversation and not on the scorecard, however useful it feels in the moment.
These six pass the test.
- Visits completed against visits scheduled, with a reason recorded for each miss
- Repeat complaints from the same customer inside the treatment’s warranty period
- Chemical and bait quantity used per job, compared with others doing the same treatment
- Service reports closed on site with the customer’s sign-off and photos
- Arrival inside the slot the customer was promised
- Annual contract renewals on the routes that technician has been servicing
Two Numbers to Keep Off the Scorecard
Revenue per technician tempts and misleads. A contract’s value is set by whoever sold it and by the area it sits in, not by the person holding the sprayer.
Raw job count is the other one. A technician handed a tight apartment-complex route will beat one sent across three suburbs and back, every week, and neither of them chose the route.
Both numbers belong to the office. Scoring a technician on either number really scores your own scheduling, your own pricing and the territories you drew long before they joined.
Fix the Records Before You Fix the People
Every measure comes from a record somebody has to keep: the visit work order, the chemical issue note, the route plan, the complaint log and the renewal list.
If service reports are carbon copies carried in a technician’s bag and chemicals leave the store without a note, no review can be fair. Staff stop trusting such a review.
Get one clean quarter of records first. Only then compare two technicians against each other, because earlier comparisons mostly measure who happens to write things down more carefully on the old paper forms.
Run the Review as a Conversation, and Say When Software Helps
Give the technician their own figures before the review, with the visit list behind each one and the reason recorded for every miss. People argue with a score. They seldom dispute dates.
Separate what the technician controls from what the office controls, because a missed visit behind a shuttered shop is not the same as a visit nobody scheduled. Treating them alike loses good technicians.
Two technicians and a diary? Keep the diary. Once several routes and annual contracts fall due together, a pest control management system can record the treatment, chemical quantity, photos and customer sign-off on every work order. Its reports then show visits scheduled against completed by technician, chemical use by job and repeat complaints by customer inside the warranty period.
Put the advice to work.
Use a test copy or fictional example to turn the discussion into something your team can check.
The Measures Worth Keeping, and the Ones That Mislead
What does one row mean before totals are combined?
Choose one period in “The Measures Worth Keeping, and the Ones That Mislead” and compare it with the source records. Define the date basis and grouping before accepting a total that combines several kinds of entry.
Background reading: Microsoft: reporting grain and relationships
Technician quarterly review sheet
One page per technician with the six measures down the left and three months across the top, plus a column for the reason behind each miss. Fill it for your last quarter to see which gaps belong to the technician, which belong to the office, and which come from missing records.
Open a blank worksheet to printQuestions owners ask
What KPIs should a pest control company track for its technicians?
Track visits completed against visits scheduled, repeat complaints inside the warranty period, chemical used per job, service reports closed with a sign-off, and arrival inside the promised slot. Each comes from the visit record. Nobody relies on memory.
How often should a pest control technician be reviewed?
Hold the formal review on a fixed schedule and show every technician their own numbers beforehand, so nothing in the review comes as a surprise. A quarter evens out one bad week. It is still short enough to catch a problem before renewal season arrives and the customer quietly switches to a competitor who answered the phone sooner.
Can I pay a bonus on these numbers?
Carefully, and never on job count alone. Paying per job pushes technicians to rush treatments, and the cost returns as repeat complaints three months later, when the same customer phones the office again. If you pay a bonus, tie it to completed visits with clean service reports and no repeat complaint inside the warranty period.
