Skip to main content
GullySystem
A practical guide

Questions a yarn spinner should ask a software vendor

Ganesh HSStrategy and Technology, GullySystem
Practical advice · 5 min read

In this guide 6 sections
The short answer

Make the vendor show a spinning mill, not a generic factory. Test count and blend records, stage-wise production entry, waste and process loss, bale and lot stock, and dispatch by count. If the demo cannot handle a mixing change or a cone lot, the product was not built for spinning.

Ask how the system describes yarn

A spinning mill sells a count, a blend and a quality, not a finished good with a size. Ask the vendor to create a 30s combed cotton and a polyester viscose blend on screen. Watch how many fields it needs.

The record should hold count, ply, blend ratio, twist and end use. It should also link to a mixing recipe that names the bale lots feeding it.

If the vendor calls it an item with a description field, you will fight the system every day. Ask whether a change in blend ratio creates a new product or edits the old one. Editing history away makes lot traceability impossible months later.

  • Count, ply and blend ratio as separate fields
  • Mixing recipe linked to bale lots
  • Twist, doubling and finish options
  • Customer-wise quality specifications

Test stage-wise production entry

Production in a mill is recorded at blowroom, card, draw frame, comber, roving, ring frame and winding. Each stage has its own output unit: laps, cans, bobbins, doffs, cones. Ask to enter one shift at each.

Operators must key fast on a plain screen. If entry needs a long form with unrelated fields, the shed will return to paper within a month.

Ask how the system links machine, shift and count. Then ask for the production report by frame. A real spinning product answers in minutes. Test the awkward cases too, such as a doff entered twice or a frame that stops halfway through a shift. The shed will meet both within the first week.

Press on waste and process loss

This is where generic software fails. Ask the vendor to book droppings, flat strips, comber noil, roving ends and hard waste. Then ask how soft waste is fed back into a mixing.

Request a stage-wise loss report for one lot. It should show weight in, weight out and waste at each stage. If it only shows a total, the data model is too shallow to find where weight goes.

Ask who sets the waste standards and how a variance is flagged. Good systems compare actual against norm for each count. A vendor who has built for spinning will mention regain, noil norms and waste sale routes unprompted. Listen for that vocabulary.

  • Waste types booked by stage
  • Soft waste reuse into mixing
  • Stage-wise loss for one lot
  • Variance against waste norms

Check bale, lot and dispatch handling

Cotton arrives in bales with lot numbers, grades and staple lengths. Ask how the system receives a purchase of several hundred bales, tracks them in the godown and issues them to the blowroom by lot.

On the sales side, ask how finished cones are packed into bags or cartons with count, lot and net weight, then dispatched against an order. Lot-wise traceability back to the bale mix matters when a customer complains.

Ask for a mock dispatch of one count to two buyers from the same lot. Watch whether lot and weight stay clear. Then report uneven yarn from that lot and see what the system shows. The answer reveals whether stock records really trace back to a bale mix.

  • Bale receipt with lot, grade and staple
  • Issue to blowroom by mixing
  • Cone, bag and carton packing
  • Dispatch by count and lot
  • Traceability from cone back to bale

Use your own data in the demo

Give the vendor one real week: your counts, your mixings and your waste sheets. Ask them to load it before the demo. A vendor who agrees is confident in the product.

Take two shed supervisors to the demo. Let them try the entry screens. Their reaction tells you more than the sales deck.

Print this list, put a tick or a cross beside each question and compare vendors by the crosses. Ask for the names of two spinning mills already running the system, and call them yourself instead of relying on a reference the vendor prepared.

Spinning software vendor question sheet

A checklist on one page, in five blocks: yarn and blend records, stage-wise entry, waste and loss, bale and lot stock, and dispatch. Each block lists three to five questions with columns for vendor answer, shown in demo, and a mark of yes, partly or no. A summary row totals the marks per vendor.

Open a blank worksheet to print

Questions owners ask

Should a spinning mill choose a generic ERP?

Only if it can handle counts, blends, mixing and stage-wise waste without heavy customisation. Test those four first, because they are the hardest to bolt on.

How long should the demo with our data take?

A few hours is reasonable for one week of sample data. If the vendor needs weeks to load it, expect long setup on the real rollout.

Who from the mill should attend?

The owner or general manager, the production head, a stores person and one shed supervisor. Each will test a different part of the flow.

Can a vendor build a missing feature?

Many can. Ask for a fixed scope, a delivery date and a demo before you pay for it, and check whether it works with future updates.

Browse all guidesBack to top ↑
Next step

Have a specific situation to work through?

This article covers the general case. Tell us what you’re actually dealing with and we’ll respond directly.

Share Your Requirements