A practical guide

How to Track Solar Project Stages, Proposals and Service Visits

Ganesh HSStrategy and Technology, GullySystem
Practical advice · 5 min read

In this guide 7 sections
The short answer

Keep three things against every plant: its proposal revisions, its installation stages with closing dates, and its service visits with the technician’s findings. Solar Installation Management Software links all three through the customer record and the panel and inverter serial numbers, so a warranty question never starts from a blank page. One history replaces three.

Why stages, proposals and visits get separated

The proposal sits in an email, the stage notes in a crew chat and the service dates in a diary, kept by three different people. Each copy is right alone. None can see the others.

Which revision did the customer accept? Which stage is still open? When is the next panel cleaning due? A customer on the phone expects an answer in seconds, and the office is opening three apps and ringing the crew supervisor.

The fix is one record per site. Everything below hangs from it, each team writes to the same place, and sales, crews, the office and service technicians read one history instead of four separate ones.

Keep proposal revisions against the enquiry

A proposal begins with the survey. The office sizes the plant, selects panels, inverter and structure from the price list, and issues a quotation that carries a revision number from its first draft. Sloped tile roofs, flat slabs and metal sheds each need a different mounting method, and the survey sheet should say which one the surveyor found.

Keep every revision on the enquiry. A customer may ask for a smaller system, then a hybrid option, and the accepted revision moves with the job into material planning and billing. Customers compare a monocrystalline option against a cheaper module line, and keeping both revisions on file shows later what was offered and what was chosen.

Pending proposals stay visible. Sales staff follow up on the ones not yet accepted, while the owner decides who may change a price and which revisions the customer must sign.

  • System size and plant type
  • Components and structure selected
  • Price at each revision
  • Acceptance date and signed copy

Define installation stages and what closes them

Split each accepted job into stages. Typical ones are structure, panel mounting, DC and AC wiring and earthing, though your own list may differ, so write it down before the first crew goes out.

Decide what closes a stage. Photos and notes from site are the usual minimum, and panel and inverter serial numbers are logged earlier, at the moment material is issued from stock. Torque checks on the structure bolts, polarity readings on each string and the earth resistance reading are examples worth demanding before a crew may close the stage.

Crews open the day’s jobs on a phone, see the material issued and close the stage, while the owner sees jobs by stage and where work waits.

Commissioning, handover and the first service date

When the plant is switched on, the commissioning sheet records test readings and inverter settings, with the monitoring login and a checklist the customer signs. Generation meter readings and the first month’s output belong on the sheet as well, giving the technician a baseline to compare when a customer calls about low yield.

That sheet marks the start of service. Warranty dates are held by serial number for panels, inverters and your own workmanship, and cleaning and inspection visits can be scheduled from the commissioning date.

Net-metering paperwork runs alongside. The file is tracked with its documents, inspection and meter change, but filing is done with the utility and its steps differ by region and scheme.

Plan service visits and decide how to sell AMC

Book every visit against the plant. A technician opens the visit and sees the serial numbers and the warranty status, then records what was done, what was replaced and what is due next. Panel cleaning, string checks and inverter fault codes are the usual contents of a visit, and the technician records which of them were done and which were skipped.

Annual maintenance contracts carry their own dates. Visits due and renewals approaching show on the office list well before a contract lapses, so nobody discovers an expired contract after a fault call.

Decide whether you sell AMC. Settle what a visit includes, because without that decision the service side has little to schedule, and a handful of plants can live in a spreadsheet. Software pays for itself only beyond that point.

Put the advice to work.

Use a test copy or fictional example to turn the discussion into something your team can check.

Plan service visits and decide how to sell AMC

What proves that a planned task was actually completed?

Select an overdue entry in “Plan service visits and decide how to sell AMC”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.

Background reading: ERPNext: maintenance plans

Plant history sheet

One row per plant with the accepted proposal revision, each stage and its closing date, commissioning date, serial numbers, warranty end dates, AMC term and next visit. Build it for ten plants. Note which fields stay empty.

Open a blank worksheet to print

Questions owners ask

Can one plant carry several proposal options?

Several options can sit on one enquiry, and the revision the customer accepts stays with the job, so billing and material planning follow that revision.

Does the software read inverter monitoring data?

It does not by default. Monitoring portals differ by inverter make, so any link is confirmed during scoping, and the login details can still be stored on the commissioning sheet meanwhile.

How are warranty dates stored?

Dates are held by serial number for each panel and inverter, with a separate date for your own workmanship, so a claim shows its cover status at once. Visits are then scheduled from commissioning.

Browse all guidesBack to top ↑
Next step

Have a specific situation to work through?

This article covers the general case. Tell us what you’re actually dealing with and we’ll respond directly.

See the Solar Installation Management Software product