Skip to main content
GullySystem
A practical guide

What to ask a vendor before buying tile manufacturing software

Ganesh HSStrategy and Technology, GullySystem
Practical advice · 5 min read

In this guide 6 sections
The short answer

Press the vendor on lot stock by shade and caliber, grade sorting at the end of the line, breakage by stage and traceability from body mix to carton. If the demo only uses plain item codes with a single quantity, the product is not built for tile.

Ask how stock is held: by item, or by lot

Tiles of one design are not interchangeable. Two cartons of the same code can differ in shade and caliber, and a customer laying a floor will see it. Software holding one quantity per item cannot warn you.

Request a stock screen for one design. You want each production lot with its shade code, caliber, grade and cartons left, and then you should ask what happens when an order tries to mix lots. Watch what the vendor does when you ask for a hold on a lot.

Shade matters most for large formats and polished vitrified tiles, where a mismatch across two cartons shows in the first row of the floor. Ask how the system picks lots for an order of several hundred cartons.

  • Stock by lot, shade and caliber
  • Order lines that keep one lot together
  • Warning when an order spans two shades
  • Lot shown on the carton label

Ask how sorting and grades are recorded

At the end of the line, tiles are sorted into first, standard and commercial grades, with rejects set aside, and the grade decides price and customer. A generic ERP often has one quality status: pass or fail. Mixed-grade orders, where a dealer takes first and standard together, need separate lines for each.

Request a demo of the sorting entry. Who keys the counts, and how fast? Can a sorter on a tablet enter cartons by grade for a lot, and does the system compare tiles pressed with tiles sorted and show the gap?

Ask about reclassification as well. A lot sorted as first grade in March may be downgraded in May, and the cartons should move without losing the lot history. Watch the vendor’s face.

Ask where breakage is counted

Tiles break at the press, the dryer, the kiln, the polishing line and in packing. A plant that tracks only a final loss figure cannot find the stage at fault, so ask whether breakage is recorded per stage with a reason code.

Then ask for the kiln record. Firing curve, kiln number, car number and the lots loaded should be linked. When a batch comes out with pinholes or warping, you can then see which kiln run it shared.

Press scrap returned to the body mix needs a record. Otherwise reclaimed material hides inside a body batch. Ask to see it work.

  • Breakage by stage and reason
  • Kiln, car and lot linked
  • Glaze and body batch recorded
  • Polishing and edge-cut losses separated

Ask for traceability from raw material to carton

A customer sends back a complaint with a carton photo. Can the system trace that carton to its pallet, lot, kiln run, glaze batch and body mix? Have the vendor do it live, from a sample carton number.

Check clay, frit and glaze supplier lots as well. A change of supplier lot often explains a shade shift that nobody can otherwise find, and without that link you will argue about it for weeks.

Ask one more thing. What happens to the lot record when a carton is returned from a dealer? Returns carry shade information you can use, but only if the carton’s lot is scanned or keyed when it comes back in.

Run a trial with your own data before signing

Give the vendor one week of real production, sorting and dispatch figures, including the messy ones. Watch how they load it and what they cannot model, and keep a list of every workaround they suggest.

Then let your sorting supervisor and dispatch clerk try it for an hour. Their reaction tells you more than the sales deck.

Test the oddities too, such as sample boards, tiles sold loose to a local mason, or breakage credited by a distributor. Note which of these the vendor can show without a custom job, and which they promise later.

Tile software vendor scorecard

The scorecard has eight rows: lot stock, shade and caliber, grade sorting, stage breakage, kiln linkage, carton traceability, dispatch by lot and supplier lots. Columns are the question to ask, what a good demo displays, the vendor’s answer and a score from zero to three.

Open a blank worksheet to print

Questions owners ask

Is a general ERP good enough for a tile plant?

Only if it can be configured for lots with shade, caliber and grade, and for breakage by stage. If those need long custom work, a tile-specific product or a custom build may fit better.

Which person should join the vendor demo?

Bring the sorting supervisor, the dispatch clerk and whoever keeps the kiln records. They will notice missing fields that the owner and the accountant would not.

How do we judge a vendor’s experience with tile?

Ask them to walk a lot from press to dispatch in tile terms. Vague answers or generic manufacturing language suggest they have not worked with a plant like yours.

Should traceability cover raw materials too?

It helps when shade shifts or defects appear without an obvious cause. Linking glaze, frit and clay lots to production lots lets you compare the batches that went wrong.

Browse all guidesBack to top ↑
Next step

Have a specific situation to work through?

This article covers the general case. Tell us what you’re actually dealing with and we’ll respond directly.

Share Your Requirements