Build a contracting system around your BOQ, your drums and your monthly bill.
An electrical contractor prices work in points, metres and numbers of DBs, buys copper at a rate that moves every month, and sends drums out to four sites at once.
The money leaks in the gaps between those facts. A drum goes to site, some of it comes back, nobody measures the offcut, and it walks to the next job on somebody’s shoulder. The BOQ was priced in January and the cable is being bought in June.
The software we build for electrical contracting follows the job itself. BOQ and rate analysis, material from godown to site and back, wiring teams on piece rate. Then the monthly measurement, the running account bill and the test readings the inspector will ask for.
Contracting businesses we can build for.
A residential wiring contractor and a panel and substation contractor keep different books, and the system is built around the one you keep. A pure solar installer belongs on the solar companies page, and an air conditioning contractor on the HVAC one.
- Electrical contractors
- Residential wiring contractors
- Commercial and office fit-out electrical contractors
- Industrial electrical contractors
- Panel building and switchgear contractors
- Substation and transformer contractors
- HT and LT cabling contractors
- Street lighting contractors
- Fire alarm and safety system contractors
- Data cabling and network contractors
- MEP contractors taking the electrical package
- Contractors taking electrical and plumbing on the same site
- Lift and escalator installation contractors
- Electrical maintenance contractors
- Government and municipal work contractors
- Builders with an in-house electrical division
- Contractors working across several districts
The modules, and what each one covers.
Nothing here is a fixed package. Each module is built, left out or changed to match how your organisation already works.
Enquiries and tenders
- Client and project
- Source: builder, architect, consultant, factory or tender
- Drawings and BOQ received
- Scope in brief
- Site location
- Submission due date
- Deposit paid on a tender
- Quoted, won or lost
- Rate at which the job went to somebody else, where you learn it
Estimation
Wiring points, conduit runs, cable metres, DBs, panels, earthing and fixtures, counted off a drawing by somebody with a scale rule.
- Item-wise quantities from the drawing
- Wiring points by type: light, fan, five ampere, sixteen ampere
- Cable runs by size in square millimetres
- Conduit by diameter and metre
- Distribution boards and their ways
- Panels and switchgear
- Earthing pits and strip
- Light fittings and fans
- Cable tray and ladder
- Quantity take-off saved against the drawing revision
Rate analysis
A point rate is a small sum with four moving parts inside it, and copper is the one that moves most.
- Material cost per item
- Copper and aluminium rate on the date of quoting
- Wastage allowance
- Labour cost per point or per metre
- Supervision and overheads
- Transport to site
- Margin
- Rate arrived at, with its working kept
- Rate used on previous projects for comparison
The rate of copper is a market fact, and the software only records which rate the quotation was built on. It cannot protect a margin against six months of price movement.
Quotation
- Drawings
- Take-off
- Rate analysis
- Quotation
- Negotiation
- Revision
- Work order
- Item-wise rates and amounts
- Supply and labour split
- Inclusions and exclusions
- Material make and brand offered
- Payment terms
- Validity, given the copper rate
- GST
- Revision history and what changed
Work order and contract terms
- Work order value and date
- Client and consultant contacts
- Agreed rates by item
- Mobilisation advance received
- Security deposit or retention terms
- Billing cycle agreed
- Completion schedule
- Penalty clauses recorded
- Scope excluded in writing
- Work order document on file
Project stages
- Slab conduiting
- Wall conduiting and chasing
- Wiring
- DB and panel installation
- Fixture fixing
- Earthing
- Testing
- Handover
Stage names are set to the way your site actually works. A factory job and a flat do not move through the same sequence.
Material planning
- Requirement worked out from the BOQ
- Requirement for the current stage only
- Material already at site
- Indent raised by the supervisor
- Approval before purchase
- Order placed to dealer or direct
- Expected delivery date
- Shortages holding up work
- Over-indenting flagged against the BOQ quantity
Purchase
- Supplier and dealer register
- Rate comparison across dealers
- Purchase order with make and size
- Copper rate on the purchase date
- Delivery to godown or straight to site
- Goods receipt with quantity checked
- Supplier bill matched to the order
- Payment due and paid
- Purchase against the estimated quantity
Godown and site material
Four sites, one godown, and a lorry that dropped half a load at the wrong gate on Tuesday.
- Stock at the godown
- Stock at each site
- Material issued to a site with a challan
- Received and signed at site
- Transfer from one site to another
- Material returned to the godown
- Consumption against the BOQ item
- Balance per site
- Material lying at a closed site
Cable and drum tracking
A drum is issued at four hundred metres and comes back with an unmeasured end. That end is your margin.
- Drum number and size
- Metres issued
- Site issued to
- Metres used against each run
- Offcut measured on return
- Drum returned or scrapped
- Scrap copper recovered and sold
- Wastage against the allowance
- Cable reconciliation per site
Wiring teams
- Teams and gang leaders
- Wiremen and helpers
- Site allotted
- Daily wage or piece rate
- Points wired per team per day
- Metres pulled
- Work measured and accepted
- Advance paid
- Weekly settlement
- Sub-contract labour bills
Site attendance
- Muster by site
- Mobile attendance with location
- Skilled and unskilled split
- Overtime
- Labour deployed against labour planned
- Attendance feeding the weekly payment
- Labour cost per site
- Workers moved between sites
Daily site report
- Work done today by item
- Floor or area covered
- Material received at site
- Manpower present
- Work held and the reason
- Instructions from the client’s engineer
- Photographs
- Safety observations
- Report sent to the office the same evening
Measurement
The client’s engineer counts fewer points than your supervisor, and the bill waits while two men walk a floor with a torch.
- Measurement sheet by item, floor and area
- Quantity claimed
- Quantity measured jointly
- Difference and the reason for it
- Date of joint measurement
- Person from the client’s side
- Cumulative quantity measured to date
- Balance quantity against the BOQ
- Measurement sheet attached to the bill
A joint measurement still needs two people and a tape. The system holds the record and the history, which is usually enough to shorten the argument.
Running account bills
- Measurement
- Joint check
- Bill preparation
- Submission
- Client verification
- Deductions
- Payment
- Bill number and period
- Cumulative and previous quantities
- Amount claimed this bill
- Advance recovered
- Retention deducted
- TDS and GST
- Client deductions and their reasons
- Amount passed against amount claimed
- Bills submitted and pending
Extra items and variations
- Work outside the original BOQ
- Instruction from the client or consultant
- Rate for the extra item
- Rate approval before the work starts
- Quantity executed
- Added to the running bill
- Extras done without written approval
- Value of unapproved extras
Extras executed on a verbal instruction are the commonest reason a final bill is short. The system records who asked and when, and it cannot make the client honour it.
Retention and deposits
- Retention deducted per bill
- Cumulative retention held
- Release on completion
- Balance held through the defect liability period
- Security deposit paid to the client
- Refund due date
- Deposits with the utility
- Amounts still unreleased from old projects
Client payments
- Payment against each bill
- Short payments and reasons
- Ageing by project
- Follow-up history
- Payment promised dates
- Cheque and transfer receipts
- Outstanding by client
- Money due against money spent on site
Sub-contractors
- Sub-contractor register by trade
- Work order issued to them
- Rates agreed
- Work measured
- Bills received
- Advances and recoveries
- Material supplied by you and recovered
- Payment status
- Performance notes
Testing records
Megger readings written on the back of a drawing, and the inspector standing there asking for them.
- Insulation resistance readings by circuit
- Earth resistance readings by pit
- Continuity checks
- Phase sequence and load balance
- Panel and switchgear test records
- Date and the person who tested
- Instrument used
- Photographs of the reading
- Test report kept with the project
Approvals and inspections
- Drawings submitted for approval
- Electrical inspectorate application
- Queries raised and replies filed
- Inspection date
- Observations to be closed
- Approval received
- Utility load sanction and meter application
- Fees and deposits paid
- Your own contractor licence renewal date
Inspections and load sanctions run on the authority’s own timeline. The system tracks the file, the fees and the observations, and it moves nothing along faster.
Safety records
- Work permits at industrial sites
- Height and hot work permits
- Safety equipment issued
- Toolbox talk record
- Incident and near miss record
- Worker insurance details
- Safety observations from site visits
- Client safety audit points closed
Tools and equipment
- Tool register
- Issued to a site or a team
- Returned
- Lost or damaged
- Testing instruments and their calibration dates
- Hired equipment and hire charges
- Ladders, drilling machines and welding sets
- Maintenance history
Handover and defect liability
- Snag list by area
- Rectification and closure
- As-built drawings handed over
- Test reports handed over
- Warranty documents for fittings
- Handover certificate
- Defect liability period and visits
- Complaints during the period
- Retention released at the end of it
Project cost against value
Turnover looks fine until somebody adds up what the copper, the labour and the wastage actually cost on one site.
- Estimated cost by item
- Material consumed at actual rates
- Labour cost paid
- Sub-contractor cost
- Site overheads
- Value billed to date
- Margin as it stands
- Loss-making items
- Cost overrun against the estimate
Role-based access
- Owner
- Project manager
- Estimator
- Site engineer
- Site supervisor
- Store in-charge
- Purchase
- Billing engineer
- Accounts
- Sub-contractor
Management dashboard
- Live projects and their stage
- Value of work in hand
- Quotations submitted and pending
- Bills raised and passed
- Outstanding by client
- Retention held
- Material consumption against estimate
- Labour cost by site
- Margin by project
- Sites behind schedule
- Stock lying at closed sites
What it connects to
- Tally or your accounting software
- WhatsApp and SMS providers
- Payment gateways
- Cloud storage for drawings
- Supplier price lists
- Existing project or billing software
Drawings stay on the drive your office already uses. The system holds the reference, the revision and the take-off made from it.
One connected workflow, end to end.
Every stage below can sit in one system, so nobody re-enters what the last stage already captured.
- Enquiry
- Drawings and BOQ
- Estimation
- Quotation
- Work order
- Material planning
- Procurement
- Site execution
- Measurement
- Running account bill
- Testing
- Handover
- Retention release
You do not have to replace everything at once.
Each phase is usable on its own, so the system earns its place before the next part is built.
- 1
Estimation and quotation
Take-off from drawings, rate analysis with the copper rate of the day, quotations and work orders. The office stops rebuilding the same sheet.
- 2
Material and site
Indents, purchase, godown and site stock, drum and cable reconciliation, teams, attendance and the daily site report.
- 3
Measurement and billing
Measurement sheets, joint measurement records, running account bills, extras, retention and client payments.
- 4
Records and analysis
Test readings, inspectorate files, safety records, handover documents and the project costing that says which jobs actually earned.
How a build actually runs.
- 01
Understand
We take one finished project and follow it backwards, from the final bill to the first take-off.
- 02
Map
Items, rates, stages, material flow, teams, measurement practice and the approvals each kind of client insists on.
- 03
Design
Screens for an estimator with a drawing open and a supervisor standing in an unplastered flat with no lights on.
- 04
Build
Estimation and site material first. Those two carry most of the loss in this trade.
- 05
Test
Your team runs a live site through it for a month, including one measurement and one running bill.
- 06
Deploy
Site by site rather than all at once, with supervisors trained on the phone screens they will actually use.
- 07
Improve
Test records, safety and costing analysis, once material and billing are being kept properly.
Systems we can put together for you.
- Electrical contracting management systems
- Estimation and rate analysis software
- BOQ and quotation systems
- Site material and godown tracking
- Cable and drum reconciliation systems
- Labour and piece-rate management
- Site attendance applications
- Measurement and running account billing software
- Project costing systems
- Testing and inspection record keeping
- Sub-contractor management
- Management dashboards
- Multi-site contracting platforms
Questions owners ask before starting.
What does custom software for an electrical contractor cover?
Estimation in points and metres, quotations, site material, wiring teams, measurement sheets, running account bills and test records. It is a project system, not a service ticketing system.
Can it price work in points and metres the way we quote?
Yes. Point types, cable sizes, conduit runs and DB ways are all priced from your own rate list, with the rate analysis kept behind each figure.
Can it track cable drums between sites?
Yes. Metres issued, metres used, offcuts returned and scrap recovered, per drum and per site. Somebody at site still has to measure the offcut.
Can it prepare running account bills?
Yes, from the measurement sheet, with cumulative and previous quantities, advance recovery, retention and the deductions the client applied.
Can supervisors use it on site?
Yes. Attendance, material received, daily progress, photographs and indents are built for a phone, because nothing else works in a building with no power yet.
Can we see the margin on a project while it is still running?
Yes. Material consumed at actual rates, labour paid, sub-contract cost and value billed, against the estimate. The numbers are only as good as what site records, though.
Can it keep our megger and earth readings?
Yes, circuit by circuit and pit by pit, with the date, the instrument and a photograph of the reading, kept with the project for the day somebody asks.
Will it handle approvals from the electrical inspectorate?
It tracks the application, the fees, the queries and the observations. The approval itself moves at the authority’s pace, and no software changes that.
Can it manage labour on piece rate?
Yes. Points wired and metres pulled per team, measured and accepted, with advances and the weekly settlement against them.
Will it work with Tally?
Usually. Purchase bills, sales bills and receipts can be posted across, and how they travel depends on which Tally you run. We look at yours first.
Can we run several sites at once?
Yes, with stock, labour, progress and billing tracked per site, and a consolidated view of what each is costing.
Can we start with only estimation and material?
Yes, and most contractors should. Those two are where the money goes. Measurement and billing can follow once site staff are used to recording things.
How we work with this trade.
Build a system that counts the offcut.
Electrical contracting is priced in small units and lost in small units. A few metres per floor, a few points disputed per bill, a drum that nobody closed off.
Take one completed floor and compare what left the godown with what you billed for it. That difference is the whole argument for a system here, and it is the first thing we would put right.
Tell us how your electrical contractors runs today.
We will tell you what can be digitised, what can be connected, what is worth automating, and what you should leave alone.
- No obligation
- We reply the same working day
- Your details stay private