Build a plumbing system around the record you make before the tiles go on.
Most of your work is invisible within a week. Concealed lines, diverters and floor traps disappear behind plaster and tile within a fortnight of going in.
If something weeps two years later, the only argument you have is the record you made before it was covered. Usually that record is a photograph of a pressure gauge, sitting in a WhatsApp group under two hundred messages.
A plumbing system designed at GullySystem puts that proof first, and then carries the fittings, the stage bills, the snag list and the service calls that follow handover.
Plumbing businesses we can build for.
Concealed work for builders and maintenance for apartment associations are two trades under one licence. Write the scope around the work you take on.
- Plumbing contractors
- Sanitary contractors
- Building services contractors
- Residential project plumbing firms
- Commercial and hotel plumbing contractors
- Industrial piping contractors
- Apartment maintenance plumbing firms
- Society and association service contractors
- Water supply and distribution contractors
- Drainage and sewerage contractors
- Borewell and sump contractors
- Overhead tank and pump installers
- Water treatment plant contractors
- Rainwater harvesting contractors
- Sewage treatment plant operators
- Sewer and drain cleaning services
- Bathroom renovation specialists
- Sanitaryware dealers with fitting teams
- Plumbing AMC service providers
- Multi-city plumbing contractors
The modules, and what each one covers.
Nothing here is a fixed package. Each module is built, left out or changed to match how your organisation already works.
Enquiries and site survey
- Enquiry from a builder, architect or homeowner
- Site address and stage of construction
- Drawings received
- Number of bathrooms and kitchens
- Tanks, sumps and pumps required
- Survey visit and measurements
- Photographs from the survey
- Competing quotes expected
- Follow-up dates
- Won and lost with reason
Quotation by points and metres
Bathrooms, points, running metres of pipe and fixture count, priced from this week’s dealer rate rather than last quarter’s.
- Rate list by item and size
- Points per bathroom and kitchen
- Running metres of CPVC, UPVC and SWR
- Fixture and fitting count
- Tanks, pumps and valves
- Labour rates by activity
- Material supplied by you or by the client
- Exclusions written plainly
- Revisions with dates
- Quotation to the builder or homeowner
Work orders and contracts
- Client and project
- Scope agreed
- Contract value
- Rate schedule attached
- Payment stages
- Retention terms
- Defect liability period
- Escalation and rate revision clauses
- Site engineer on the client side
- Signed documents on file
How a site is laid out
A hundred elbows should not vanish between two towers.
- Project, tower and block
- Floor
- Flat or unit
- Bathroom, kitchen and utility
- Points per location
- Stage reached at each location
- Crew working there
- Materials issued against it
- Tests done
- Photographs by location
Material planning
- Requirement worked out from the drawing
- Pipe sizes and lengths
- Elbows, tees, couplings and unions
- Valves and diverters
- Floor traps and nahani traps
- Solvent cement, tape and consumables
- Fixtures and CP fittings
- Quantity per floor
- Buffer allowed
- Planned against issued
Fittings issued to site
Elbows and tees are bought by the hundred, and nobody can say how many went to which tower.
- Issue note per site and floor
- Item, size and quantity
- Person who received it
- Return of unused material
- Damaged and wasted material
- Balance standing at each site
- Transfer between sites
- Godown stock
- Material reconciliation at closure
Reconciliation only works if returns are recorded as carefully as issues. Most losses show up as a balance that was never sent back, not as a theft.
Buying material
- Dealer and supplier master
- Rates by brand and size
- Purchase order
- Credit terms with each dealer
- Goods receipt at godown or site
- Purchase invoice
- Rate changes recorded by date
- Supplier outstanding
- Material cost against the quotation
First fix
Concealed lines going in while masonry is still running, and disappearing behind plaster soon after.
- Floors ready for first fix
- Chase cutting completed
- Concealed line laid
- Diverters and mixers fixed
- Floor trap and drainage lines
- Shaft and riser work
- Photographs before covering
- Crew and dates
- Work completed per unit
Pressure test records
The one record everybody wants later, and the one nobody keeps properly.
- Bathroom or location tested
- Test pressure
- Duration held
- Gauge photograph
- Date and time
- Plumber who ran the test
- Site engineer sign-off
- Pass or fail
- Retest after rectification
- Test certificate for the builder
The record exists only if the supervisor takes the photograph at the site. The system can refuse to mark a location complete without it, which is usually the only discipline that works.
Second fix
- Floors where tiling is finished
- Sanitaryware installation
- CP fittings and accessories
- Wash basin and counter fixing
- Health faucet and connections
- Water meter fixing
- Testing after installation
- Unit-wise completion
- Snags noticed during fixing
Client-supplied fixtures
A tap arrives chipped from the client’s own supplier, and your crew gets blamed at handover.
- Item received from the client
- Brand and model
- Quantity
- Photograph at receipt
- Condition noted before anybody touches it
- Missing parts recorded
- Stored where
- Issued for installation
- Damage during installation recorded separately
Tanks, pumps and systems
- Sump and overhead tank capacity
- Pump make, model and rating
- Booster and pressure pumps
- Level controllers
- Water meters
- Filtration units
- Rainwater harvesting arrangement
- Commissioning record
- Warranty documents from the manufacturer
Crews and daily labour
Mistris, helpers and a contract gang that changes between Monday and Thursday.
- Crew and gang master
- Plumbers, helpers and supervisors
- Site allocation for the day
- Attendance at the site
- Labour contractor and rate
- Daily wages and advances
- Overtime
- Skill and speciality
- Tools issued
- Labour cost per site
The daily site report
- Work done today by location
- Crew present
- Material consumed
- Tests completed
- Photographs
- Hold-ups and reasons
- Instructions from the site engineer
- Material required tomorrow
- Report to the office without a phone call
Measurement and stage bills
Bills follow the points and fixtures actually installed, not the ones in the original drawing.
- Measurement sheet by location
- Points and metres completed
- Fixtures installed
- Extra items outside the original scope
- Rate applied from the contract
- Running account bill
- Client engineer certification
- Deductions and retention
- GST invoice
- Bill against contract value
Payments and retention
- Bills raised, and the amount certified by the client’s engineer
- Payments received
- Retention held by the client
- Retention release date
- Advance adjusted
- Outstanding by project
- Ageing beyond agreed terms
- Follow-up record
- Cash flow against upcoming wages
Snag list and handover
- Walk-through
- Snags listed by unit
- Assigned to a crew
- Rectified
- Verified
- Handover signed
- Snag raised by client or engineer
- Location and description
- Photograph
- Target date
- Status
- Repeat snags
- Handover document with test records attached
Defect liability period
- Period per project
- Complaints received during the period
- Attended within the agreed time
- Cause established
- Chargeable or covered work
- Material replaced
- Period expiry alerts
- Retention release after expiry
What your defect liability covers is written into your contract, not into the software. The system applies the terms you agreed and keeps the evidence for the arguments.
Service calls
A leak in a third-floor bathroom at nine at night, and a flat owner who wants somebody now.
- Complaint received and channel
- Customer, building and flat
- Problem described
- Priority and promised visit time
- Plumber assigned
- Travel and reaching time
- Work done
- Material used from van stock
- Visit charge and material charge
- Payment collected on site
- Reopened complaints
AMC contracts
For apartment associations, offices and factories that want somebody on call rather than somebody after a flood.
- Contract scope and covered items
- Buildings and units covered
- Visit frequency
- Visits due and visits done
- Call-outs included in the contract
- Items charged extra
- Contract value and billing schedule
- Renewal date and reminder
- Response time agreed
- Contract profitability
Preventive visits
- Pump and motor servicing
- Tank cleaning schedule
- Drain and sewer line jetting
- Valve and float checks
- Water meter readings
- Filter and cartridge replacement
- Checklist per visit
- Photographs and readings
- Overdue schedules
The plumber’s phone
One bar of signal in a basement pump room, and a job that still needs recording.
- Today’s sites and calls
- Work assigned
- Material received and used
- Pressure test entry with gauge photograph
- Photographs before and after
- Customer signature
- Payment collected
- Expense entry
- Attendance check-in
- Notes for the office
Client and builder access
- Progress by tower and floor
- Units completed at each stage
- Test records with photographs
- Snag list and status
- Bills raised and passed by the client
- Material supplied by the client
- Service complaints and closure
- Documents and handover files
Tools and equipment
- Pipe threading and cutting machines
- Pressure testing pumps
- Jetting and drain cleaning machines
- Drilling equipment
- Issued to which crew
- Service and repair records
- Hired equipment and rent
- Lost or damaged items
What the contractor checks weekly
- Sites running and stage reached
- Units pending first and second fix
- Tests not recorded
- Material issued against planned
- Labour cost by site
- Bills raised and passed by the client
- Retention held
- Outstanding by client
- Open service calls
- AMC visits overdue
- Project margin against quotation
Who logs in, and what they see
- Contractor and partners
- Project manager
- Site supervisor
- Plumber and crew
- Store keeper
- Purchase in-charge
- Billing and accounts
- Service coordinator
- Builder or client engineer
Messages and alerts
- Service call assigned to a plumber
- Visit confirmation to the customer
- Test completed at a location
- Material required at a site
- Bill raised to the client
- Payment reminder
- AMC visit due
- AMC renewal reminder
Telling a client the plumber is on the way is a message that gets approved easily. A measurement sheet with quantities on it is not, so that goes out as a link to the record.
Integrations
- Accounting software
- Payment collection and UPI
- WhatsApp and SMS providers
- Dealer price lists
- Payroll for wages
- Cloud storage for drawings
- Builder project management systems
A builder’s own project system rarely opens itself to a contractor’s software, so progress usually still goes across as a report rather than as data.
One connected workflow, end to end.
Every stage below can sit in one system, so nobody re-enters what the last stage already captured.
- Enquiry
- Site survey
- Quotation by points
- Work order
- Material planning
- First fix
- Pressure test
- Second fix
- Snag list
- Handover
- Stage bill
- Service call or AMC visit
You do not have to replace everything at once.
Each phase is usable on its own, so the system earns its place before the next part is built.
- 1
Sites and proof
Projects, floors, units, first and second fix stages and the pressure test record with its gauge photograph. This is the part that ends arguments.
- 2
Material and labour
Material planning, issue per site and floor, returns, purchase, crew allocation and the daily site report the office stops phoning for.
- 3
Billing and handover
Measurement sheets, stage bills, retention, snag lists, handover documents and the defect liability clock that starts after them.
- 4
Service and AMC
Complaint calls, plumber allocation, van stock, AMC contracts, preventive visits and the renewals that keep the service side alive.
How a build actually runs.
- 01
Understand
We chase one bathroom from first fix to second fix, asking for the proof at every step. Bring the WhatsApp photographs.
- 02
Map
Rate items, stages, material norms, test practice, billing terms, retention and the way your supervisors currently report a day.
- 03
Design
The site screen is built for a phone held in a half-built bathroom, with gloves on and one bar of signal.
- 04
Build
Sites, stages, material issue and test records first, because those three carry the evidence everything else depends on.
- 05
Test
One live project runs on it from first fix through a stage bill, and the bill is checked against your own measurement sheet.
- 06
Deploy
Go-live on new sites first, with running sites brought in at their next stage rather than mid-floor.
- 07
Improve
Service calls, AMC contracts and margin reporting once the site discipline has held for a couple of months.
Systems we can put together for you.
- Plumbing contractor management software
- Site and stage tracking systems
- Pressure test and quality record systems
- Material issue and reconciliation software
- Point and fixture quotation tools
- Measurement and stage billing systems
- Snag list and handover tracking
- Service call management software
- AMC and preventive maintenance systems
- Plumber field applications
- Crew attendance and wage tracking
- Builder and client portals
- Management dashboards
Questions owners ask before starting.
Why does a plumbing contractor need its own software?
Because the work disappears behind tile. The record of what went in, and the test that proved it held, is the only thing you can produce two years later.
Can pressure test records be kept properly?
Yes. Test pressure, duration, gauge photograph, date and the site engineer’s sign-off are stored bathroom by bathroom, which is how a builder will ask for them.
Can we track fittings issued to each site?
Yes, by site and by floor, with returns recorded too. The balance at each site is visible instead of being guessed at the end of the project.
Can we quote by points and running metres?
Yes. Points per bathroom, pipe lengths, fixtures and labour come off your own rate list, with the dealer rate as it stands this week.
Can stage bills be raised from actual work?
Yes. The measurement sheet is built from units and locations actually completed, so the running account bill matches what the client engineer will certify.
Can it handle client-supplied sanitaryware?
Yes. Items are checked in with photographs and condition noted before anybody touches them, which is what settles a chipped tap at handover.
Can it run the service side as well as projects?
Yes, and most contractors need both. Service calls, plumber allocation, van stock and on-site collection sit beside project work in the same system.
Can we manage AMC contracts for apartments?
Yes. Covered items, visit frequency, visits done, included call-outs, chargeable extras and renewal dates are all tracked per contract.
Will it work at a site with poor signal?
Entries can be captured offline and synced later. Photographs upload when the phone finds a connection, which in a basement pump room may be at the gate.
Can the builder see progress themselves?
Yes, through a portal restricted to their project, showing stages, tests, snags and bills. What they can see is set by you, not left open.
Where should we start?
Sites, stages, material issue and test records. Billing follows naturally from measurements, and the service and AMC side can come once the project side is steady.
How we work with this trade.
Build a system that keeps the proof.
The pipe was fine. The test passed. Two years later none of that matters unless somebody wrote it down with a photograph and a date against it.
Show us one running account bill and the measurement sheet behind it. That sheet is normally the first thing to fix, because a bill nobody can back with a reading is a bill that waits.
Tell us how your plumbing contractors runs today.
We will tell you what can be digitised, what can be connected, what is worth automating, and what you should leave alone.
- No obligation
- We reply the same working day
- Your details stay private