Sixty Bags of Cement, on One Site’s Account
The lorry drops at whichever gate it reaches first. Twelve bundles meant for one job end up at another, and by Sunday, when the store register is written up, nobody remembers.
The indent comes from the site
The site engineer asks for what he needs, by item and quantity, against the site and the stage it is for. It goes to whoever approves indents in your firm. Approved, it reaches the storekeeper as a list instead of a phone call after the gate has shut.
What the store does with it
Issued against the indent
Sixty bags of cement issued against indent IN-118. Stock at the store falls by sixty, and the site’s material account rises by the same.
The site owns the material
Issued stock sits on that site, not in a general heap. When your project manager asks what the villa job has consumed, the answer is a list.
Short issues stay visible
Asked for eighty, issued sixty. The balance stays open on the indent, so the site engineer knows what is still to come.
Returns carry a reason
Material sent back is recorded with who sent it and why. Unused steel coming back at the end of a stage is normal, and it should still be written down.
What this answers later
Most of these questions turn up in the same review meeting.
- Material issued to each site this month, against its indents
- Spend against the material budget head, while the site is still running
- Indents waiting for approval, which is often the real delay
- Stock left at the central store, without walking the yard
- What reached the site on the day a stage was poured
Frequently asked questions
Does the storekeeper need a computer?
A phone does for issues and returns. Receiving material and checking the vendor bill are easier on a screen in the office, and most storekeepers do that part sitting down anyway.
Will the stock figure be accurate?
Only as accurate as what gets entered. If a lorry is unloaded at the gate on a Sunday and nobody records it, the figure is wrong, and no software fixes that. The indent makes the gap obvious rather than invisible.
Can it stop material going to the wrong site?
It cannot stop a driver. What it does is put every issue against a named site with a signature, so the wrong delivery is found on Tuesday instead of at the end of the stage.