Skip to main content
GullySystem

RA Bill Four Knows What Bill Three Did

It is the 28th. Your billing engineer is copying last month’s figures into this month’s sheet, hoping the client’s engineer reads a deduction the same way he does.

Measurement first, bill after

Quantities measured this period go in against the stage and its rate. The bill is built from those lines rather than typed over the last one. Previous and cumulative figures come from the bills already raised on that site, so the arithmetic that usually goes wrong is not done by hand.

What the bill carries

This period against cumulative

Quantity measured now, quantity billed so far, and the balance under each item. The client’s engineer reads the three columns he always asks for.

Advance recovery

Whatever instalment of the advance is due back comes off this bill, in the pattern set on the work order. Nobody has to remember which instalment it was.

Retention held

A slice is held at the rate you agreed, and it moves to the retention list rather than into the payable figure.

Net payable, and who certified

The payment certificate prints the certified amount, the date and the name of the person who certified it. That page is what travels to the client’s office.

After it leaves the office

A bill that has gone out still has a life.

  • Bills raised, certified and still unpaid, client by client
  • The gap between what was claimed and what was certified
  • Receipts recorded against a bill, in full or in part
  • Retention building up on that site, bill by bill
  • The next bill, opening from where this one closed
FAQ

Frequently asked questions

Does it work for bills we raise and bills we certify?

Both. A contractor raises his running bills against a work order on your site. Where you are the one certifying, the claimed and certified figures sit side by side with the difference visible.

Can the bill format match what our client accepts?

The format follows what your clients already sign. Item descriptions, deduction lines and the numbering are yours, and all of it is settled before the first site is loaded.

Will it stop a measurement dispute?

No. A contractor with his own pocket diary will still disagree with your engineer. Now the measurement sits on a date against a stage, so the argument runs over a record instead of two memories.

Talk to us

Tell us what you need.

Send a short brief and one of our engineers will come back to you — usually the same day.

  • No obligation
  • We reply the same working day
  • Your details stay private

Your details are private and secure. Protected by reCAPTCHA.