Charges bought and sold on each freight job
Buying and selling charges sit side by side on the job. Each charge sold is lined up with the cost from the carrier, terminal, haulier or agent, held in the currency of whoever bills it. Margin is readable while the job is open, and selling invoices are raised from the same lines.
What a charge line on a freight job holds
A charge line has two halves. One half is the amount sold to the shipper, and the other is the cost bought from a vendor. Both sit under a charge head from the forwarder’s own list, in the order its sheet uses.
Charges on a freight job across its life
Charges build up as a shipment moves. Early lines come from the quote. Later lines arrive with carrier and terminal bills. Four moments show how both sides are kept together. Accounts, operations and the owner all look at the same lines.
Who reads the charges and what each sees
Charges are read by every desk, but not for the same reason. Sales reads the sale, operations reads the cost, and the owner reads the margin. Accounts reads both sides.
Decisions to settle before charges go live
Charge lines decide what margin the owner sees, so the rules deserve a short meeting. Bring accounts, operations and the sales lead together. Four points need settling before the first live job is costed.
How charges connect to the rest of the product
Charges take their sold lines from the quote and their costs from vendors. Then they hand figures on. Invoices, agent statements and bill matching all draw on them. The lines below show where each flow comes in and where it goes out. Read them top to bottom.
- Quotations pass their sold lines to the job
- Job files hold the charges for each shipment
- Vendor bills are matched against the recorded costs
- Overseas agent accounts take costs paid and charges collected
- Shipper credit and receivables follows invoices raised from sold lines
Where the charge record stops
This feature records what is sold and what is bought, and shows the margin. It does not set a price, decide a margin policy, or settle how a foreign currency is treated in the books. Tax set-up for each country is gone through with the forwarder’s adviser. The accountant keeps the ledgers. A forwarder with very few jobs may do well with a sheet.
Frequently asked questions
Can a cost be entered before the vendor bill arrives?
Yes, from the vendor’s confirmation, as soon as operations has it. The line then shows a cost that is expected, not yet billed. When the bill arrives it is matched to that line. Any difference is plain to see.
Is each charge held in the vendor’s own currency?
Each charge is held in the currency of the party who bills it. A carrier invoice in one currency and an agent charge in another sit on the same job. Neither is forced into the other.
Where does the selling invoice come from?
It is raised from the charges recorded on the job. Each sold line sits beside the vendor cost it has to cover. The invoice and the margin are read from one source. Nothing is retyped.
Can we keep our existing charge heads?
Yes, your charge heads and the order in which they appear on the sheet are entered as your team uses them. Nobody has to learn a new list. Nobody has to learn a new order.
Does the margin change as late costs arrive?
The job margin is recalculated each time a cost or sale is recorded. Lines still waiting for a vendor bill are listed. Everyone can see when a margin is not final. False comfort is avoided.
How this feature fits the system.
Freight Forwarder Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Quotations
A quote adds margin and local charges to a valid buying rate, and every revision and outcome stays on the shipper’s record.
Quote & Proposal ManagementJob file per shipment
An accepted quote opens one job that carries parties, routing, vendors and cargo through booking, movement and delivery until the file closes.
Order ManagementHouse bill and document drafts
Bill drafts, shipping instructions and arrival notices are prepared from the job, checked by documentation staff, and filed with the version that was released.
Document ManagementTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements