Skip to main content
GullySystem

Charges bought and sold on each freight job

Buying and selling charges sit side by side on the job. Each charge sold is lined up with the cost from the carrier, terminal, haulier or agent, held in the currency of whoever bills it. Margin is readable while the job is open, and selling invoices are raised from the same lines.

What a charge line on a freight job holds

A charge line has two halves. One half is the amount sold to the shipper, and the other is the cost bought from a vendor. Both sit under a charge head from the forwarder’s own list, in the order its sheet uses.

Charge head and description

Each line carries a charge head such as ocean freight, terminal handling or documentation, taken from the forwarder’s list. The order matches the existing job sheet. A new head is added when a new kind of charge appears.

Cost in the vendor’s currency

The cost is entered in the currency of the party who bills it, whether carrier, terminal, haulier or overseas agent. The line keeps that currency. When the vendor’s bill arrives, it is compared with this line, so a difference shows.

Amount sold to the shipper

Beside each cost sits the amount charged to the shipper, carried over from the accepted quote. The margin on that line can be read at once. A later change to the sale is recorded. Charges agreed after booking are added the same way.

Margin while the job is open

Total sold less total cost gives the margin, line by line and for the whole job. It shows before the invoice goes out. Lines still waiting for a vendor bill stay visible, so a thin margin is not mistaken for a full one.

Charges on a freight job across its life

Charges build up as a shipment moves. Early lines come from the quote. Later lines arrive with carrier and terminal bills. Four moments show how both sides are kept together. Accounts, operations and the owner all look at the same lines.

Carrying the quote onto the job

The quote is accepted and the job opens. Its lines become the first selling charges, each carrying the margin that was quoted. Operations adds a cost as each vendor confirms it, so the matching halves fill in over the days that follow.

Adding a terminal surcharge

The terminal advises a handling charge nobody had quoted. The operations clerk enters it as a cost. The sales desk adds a matching sale, or decides to absorb it. The job margin changes at once.

Recording an agent’s collect charges

An overseas agent bills a delivery charge in its own currency. The clerk records the cost on the job. The agent’s statement later carries it, in the same currency, with the job number beside it.

Reviewing margin before invoicing

Before the selling invoice goes out, the accounts clerk reads the job margin. One line looks thin. The clerk checks the vendor bill behind it and asks operations whether a charge was missed or entered twice.

Who reads the charges and what each sees

Charges are read by every desk, but not for the same reason. Sales reads the sale, operations reads the cost, and the owner reads the margin. Accounts reads both sides.

Sales staff watching line margins

They compare the sold amount with the cost on each line of a job they quoted. A line below the margin they promised is plain to see. They raise it with operations. That happens before the invoice goes out.

Operations entering vendor costs

They record each cost as the carrier, terminal, haulier or broker confirms it. The entry sits beside the sale it covers. A cost with no sale beside it is a prompt to ask sales. Haulier bills follow the same pattern.

Accounts raising selling invoices

They raise the selling invoice from the charges on the job, each lined up with the cost it must cover. Vendor bills are matched to the same lines. Statements for agents print from them too.

Owners reading margin by job

They read margin by job, shipper, lane and salesperson without asking each desk for a sheet. A loss-making shipment is visible while the file is open. Month end holds no surprise for the owner. Each desk keeps its own list.

Decisions to settle before charges go live

Charge lines decide what margin the owner sees, so the rules deserve a short meeting. Bring accounts, operations and the sales lead together. Four points need settling before the first live job is costed.

Who may alter amounts

Decide who may change the amount sold and who may change a cost. Splitting the two is wise. Sales then cannot quietly alter a cost to flatter a margin, and operations cannot alter a quoted price.

Which charges stay off the job

Decide whether general overheads, such as office rent, stay off the job or are shared across jobs by a rule. Say so in writing. Margin figures mean little if staff load them differently from one another.

Charge heads and open jobs

Your charge head list and the order of charges on the sheet are entered first. Open jobs with costs paid and sales raised are then imported. The team compares each against the original sheet. Each job is ticked off.

Margin report to read first

Begin with margin by job, then by shipper and lane. Decide who reads it, and when the desks meet to discuss a thin job. Keep the first meeting short.

How charges connect to the rest of the product

Charges take their sold lines from the quote and their costs from vendors. Then they hand figures on. Invoices, agent statements and bill matching all draw on them. The lines below show where each flow comes in and where it goes out. Read them top to bottom.

  • Quotations pass their sold lines to the job
  • Job files hold the charges for each shipment
  • Vendor bills are matched against the recorded costs
  • Overseas agent accounts take costs paid and charges collected
  • Shipper credit and receivables follows invoices raised from sold lines

Where the charge record stops

This feature records what is sold and what is bought, and shows the margin. It does not set a price, decide a margin policy, or settle how a foreign currency is treated in the books. Tax set-up for each country is gone through with the forwarder’s adviser. The accountant keeps the ledgers. A forwarder with very few jobs may do well with a sheet.

FAQ

Frequently asked questions

Can a cost be entered before the vendor bill arrives?

Yes, from the vendor’s confirmation, as soon as operations has it. The line then shows a cost that is expected, not yet billed. When the bill arrives it is matched to that line. Any difference is plain to see.

Is each charge held in the vendor’s own currency?

Each charge is held in the currency of the party who bills it. A carrier invoice in one currency and an agent charge in another sit on the same job. Neither is forced into the other.

Where does the selling invoice come from?

It is raised from the charges recorded on the job. Each sold line sits beside the vendor cost it has to cover. The invoice and the margin are read from one source. Nothing is retyped.

Can we keep our existing charge heads?

Yes, your charge heads and the order in which they appear on the sheet are entered as your team uses them. Nobody has to learn a new list. Nobody has to learn a new order.

Does the margin change as late costs arrive?

The job margin is recalculated each time a cost or sale is recorded. Lines still waiting for a vendor bill are listed. Everyone can see when a margin is not final. False comfort is avoided.

Where it fits

How this feature fits the system.

Freight Forwarder Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotations

A quote adds margin and local charges to a valid buying rate, and every revision and outcome stays on the shipper’s record.

Quote & Proposal Management

Job file per shipment

An accepted quote opens one job that carries parties, routing, vendors and cargo through booking, movement and delivery until the file closes.

Order Management

House bill and document drafts

Bill drafts, shipping instructions and arrival notices are prepared from the job, checked by documentation staff, and filed with the version that was released.

Document Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements