Skip to main content
GullySystem

Progressive Web App Development

A progressive web app is a web application that can be installed on supported devices. It can cache selected screens and hold offline entries when those behaviours are built into the workflow.

Why businesses choose this route

A browser link lets staff and dealers try the app before installing it. Sign-in, device support and the work available offline still need to be designed for your users.

No store review

A browser-delivered update does not need an app-store review. The release plan still needs to handle cached versions, open sessions and unsent entries.

One shared application

One codebase can serve phones, counter tablets and desktops. Each supported browser, screen size and device workflow still needs testing.

Easy to hand out

A dealer opens a link and follows the installation steps for their browser. Business accounts, sign-in and password recovery remain part of the application.

The offline side

This is where much of the engineering sits. A screen has to behave the same in a warehouse where the signal drops for stretches.

Cached screens

Selected lists and screens can be saved on the device. Agree what stays available, how old it may be and what happens if storage is cleared.

Queued entries

Offline forms can be saved locally and retried when the app reconnects. Show pending, failed and accepted entries separately; background delivery depends on browser support.

Notifications

Push requires permission and a supported browser. On iPhone and iPad, WebKit introduced push for installed home-screen web apps in version 16.4; check the devices your team uses.

Where this stops being enough

The limits are stated before any build starts.

Heavy hardware use

Test the actual printers, scanners and location requirements before choosing a PWA. Browser hardware APIs differ, and continuous background access may need a native app.

Store presence matters

If customers search the app stores, a store listing helps.

Long stretches offline

Long offline periods need explicit local storage, conflict handling and recovery tests. Browser storage can be limited or cleared, so critical records need a recovery plan.

What makes a web app installable

Installation rules vary by browser. Secure delivery and an app manifest support the experience; offline behaviour is a separate engineering decision.

HTTPS

The site must be served securely. This is standard now.

A web app manifest

A small file with the app’s name, icons at 192 and 512 pixels, a start page and a display mode such as standalone.

Offline and update handling

A service worker can handle requests and serve cached resources. It is useful for offline workflows, but it should not be described as a universal installation requirement.

Phones and platforms

Support differs between Android and iPhone.

Android Chrome

Offers install prompts and supports most features, including push notifications.

iPhone Safari

Installing is a manual step from the share menu. Apple’s WebKit team added push for home screen web apps in iOS 16.4, and only after the app is installed and the user taps to allow.

Hardware limits

Deep Bluetooth, background tasks and some sensors remain limited. List needs before choosing this route.

When to pick something else

A PWA is not always the answer.

Constant device access

Continuous Bluetooth or background location suits native apps.

Customers who search stores

If discovery through an app store is essential, include packaging, store policies and release review in the scope. A browser link alone will not provide that presence.

Older devices

Very old browsers lack service worker support.

A shift with an installable web app

Consider a stock-counting workflow designed for intermittent signal. Staff need separate statuses for entries still on the device, entries accepted by the office and uploads that failed.

Adding the app to the home screen

On the first day, a worker opens the web address and chooses to add it to the home screen. After that, an icon opens it. No store account or download link is involved. That is the whole install.

Taking entries in a dead zone

In a basement store, a worker records stock counts. The screen shows each entry as saved on the phone. A small badge counts what is waiting. The worker keeps going. Work carries on. Each entry gets a time stamp from the phone.

Entries reach the office

When the app reconnects, it retries waiting entries and checks the server response. Each entry keeps a stable identifier to prevent duplicate counts. A rejected entry stays visible for correction.

A fix without any reinstall

A label correction is published with an update policy for cached screens. Test how an open app receives the change and protect unsent work before asking staff to reload.

What the business settles before it is built

An installable web app holds records on phones, which brings business choices ahead of technical ones. These calls belong to you and decide what is stored, who may use it and how it connects to the office. Decide before the build.

Signing in on a shared phone

Some handsets are passed between staff. Decide whether each person signs in separately and how a lost phone is cut off. Write the rule and tell staff before launch. Shared phones are normal in shops. Agree a sign-out habit.

What may be kept on the phone

Offline use means data stays on the device. List the records that may be stored and for how long. Customer details are worth extra thought. Clear them when a worker signs out. Log what was cleared and when.

How existing lists come across

Items, customers and locations must be loaded before anyone works offline. Choose the source list and its owner. Mistakes found now cost minutes. Mistakes found in the field cost trips. Check a sample by hand. Fix errors at the source list.

The first alert the office wants

Choose one notice, such as a failed upload that is stuck, and who receives it. Start there. A single alert read by the right person is worth more than ten ignored ones. Keep alerts few. Review them monthly with the office.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

The offline side

Which actions still need a connection, even if the screen opens offline?

For “The offline side”, interrupt a save on a test device and reconnect it. Agree how pending work and conflicting edits should be shown before promising offline operation.

Background reading: Android: offline data handling

FAQ

Frequently asked questions

Will a progressive web app work on iPhones?

Mostly, with caveats. Installation and offline caching work on recent iOS versions, while some notification and background behaviour is more limited than on Android.

Can it be listed on the Play Store?

Yes, wrapped as an Android package, which is a common route for dealer and field apps. The same web code serves both the store listing and the plain browser link.

Is it cheaper than a native app?

A shared web codebase may reduce duplicated work, but cost depends on offline behaviour, integrations, hardware access and testing. Compare the same agreed scope before choosing.

Is a PWA the same as an app in the Play Store?

Not quite. It is a website that behaves like an app. It can be listed in some stores, though most people reach it through a link.

Can a PWA send notifications?

On Android, yes. On iPhone, yes for installed apps on recent versions of iOS. Check the version your users hold.

What does a browser check before offering install?

Requirements vary by browser and operating system. A secure site and a suitable app manifest are common foundations. Confirm the installation route on the devices your users actually have.

Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements