Skip to main content
GullySystem
Manufacturing

Business solutions for API manufacturers

Explore software for work such as “Second-source qualification at formulators”. Review each business function below, including when it fits and what to check before implementation.

API manufacturers

How the business operates.

An API plant makes a molecule in stages. Starting materials become intermediates, intermediates become crude product, and crude product is purified, dried, milled and packed. At every stage a sample is tested, and a stage that fails its specification can send material back for rework, reprocessing or rejection, each of which must be written down. Every step leaves a record.

Route and stage master

Hold each product’s synthesis route as stages with inputs, solvents, equipment and in-process test points.

Batch manufacturing records

Record charges, temperatures, hold times, yields and sample draws for each stage, with a reviewer’s sign-off.

Intermediate and final lot genealogy

Show, for each lot, the intermediates, starting materials and any reprocessing that sit behind it.

Deviations and change control

Raise deviations against the batch, link investigations and track change requests to the route until they are closed.

Laboratory results

Post assay, impurity, solvent, water and particle size results for each sample, compared with the specification.

Retest and expiry tracking

Show retest dates for each final lot with a list of stock that needs retesting before dispatch.

The records that hold the operation together.

  • Starting materials and suppliers. Receive materials with supplier lot, quarantine status and sampling records, and keep approved supplier lists.
  • Route and stage master. Define each synthesis route as stages with inputs, solvents, equipment and test points, with revisions under change control.
  • Batch manufacturing records. Record charges, parameters, hold times, yields and sample draws for each stage and each reviewer’s sign-off.
  • Intermediate lot genealogy. Link final lots to their intermediates and starting materials, including reprocessed and recovered material.
  • Equipment use and cleaning. Log which reactor, centrifuge or dryer ran each stage, with cleaning records between products.
  • Laboratory results. Post assay, impurity, solvent, water and particle size results against samples and compare with the specification.
  • Deviations and investigations. Raise deviations against a stage, link investigations and keep them visible on the batch until closed.
  • Change control. Track requests to routes, specifications and equipment until approved and effective from a stated batch.

Operational bottlenecks to check

Intermediates lose their lineage

A final lot is built from three intermediate lots, and a reprocessed lot is blended in. The chain from final lot back to starting material is rebuilt from folders each time a customer asks.

Deviations sit in a separate file

A deviation raised during drying is tracked in a register that is not tied to the batch. Release goes ahead without anyone checking if it is closed. The gap is found later.

Campaign cleaning is poorly recorded

Equipment is cleaned between products, and the swab or rinse results sit on a sheet beside the reactor. Which clean belongs to which batch is unclear. Auditors ask.

Solvent recovery blurs lots

Recovered solvent is reused across batches, and the record of how much recovered material went into a lot is incomplete.

Retest dates are managed by hand

Final lots carry a retest date. The warehouse tracks them in a spreadsheet and expired stock is found during stocktaking.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Starting material receipt

    Materials arrive against a purchase order, are sampled and are held until released by quality staff.

  2. 2. Stage charge and reaction

    Charges, temperatures, pressures and hold times are logged against the stage and the reactor used.

  3. 3. Isolation and drying

    Filtration, centrifuging and drying are recorded with yields and samples drawn.

  4. 4. Test and review

    Results are posted against the specification. The batch record is reviewed with its deviations before the next stage or release.

  5. 5. Mill, blend and pack

    The final powder is milled, blended and packed in sealed drums, each with a recorded seal number.

  6. 6. Release and dispatch

    The lot is released, a certificate is produced and the load is shipped with the retest date visible.

Roles and responsibility boundaries.

For production heads

Follow batches in progress, equipment in use, yields by stage and open deviations.

For operators

Post charges and readings at the reactor on a tablet, with the stage instructions in view. Paper stays in the office.

For analysts

Post results against the sample and compare them with the specification.

For quality staff

Review each batch record, its deviations and test results before release.

Reports your managers need.

  • Batches by stage and product
  • Yield by stage across campaigns
  • Open deviations by age and stage
  • Intermediate lots and the final lots they fed
  • Equipment use and cleaning between products
  • Retest dates by lot
  • Dispatch by customer with certificate numbers

Connections to scope

  • Laboratory instruments by file import
  • Barcode and label printers
  • Weighing scales
  • Email
  • Accounting export

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Routes and stages

Each route’s stages, solvents and test points are entered with your technical team.

Specifications

Specifications and limits are entered as your quality unit sets them.

Review rules

Reviewers, deviation owners and release approvers are named during setup, with your quality, safety and regulatory heads confirming each step.

Opening data

Batches still open, lots on hand and retest dates are keyed in from the registers kept today.

Limitations to settle before implementation

  • A tablet or capsule maker will find Pharmaceutical Manufacturer Management Software closer.
  • A trader that only buys and resells active ingredients needs stock and invoicing, not a batch record.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Second-source qualification at formulators
  • Contract manufacturers who buy APIs for others
  • Overseas importers and distributors
  • Repeat orders from trialled buyers
  • Custom synthesis enquiries
  • New molecule launches
  • Technical document readiness
  • Reducing reliance on traders
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements