Skip to main content
GullySystem
Manufacturing

Business solutions for Building and construction material manufacturers

Explore software for work such as “Builders and developers on live projects”. Review each business function below, including when it fits and what to check before implementation.

Building and construction material manufacturers

How the business operates.

A plant selling building material sells weight, volume and strength to buyers who never see the factory. What reaches the site must match the concrete grade or the brick class that was ordered. The paper behind it must say so.

Orders, price lists and dealer accounts

Take orders from dealers and project sites against their own price list, scheme and credit limit, and show the account balance at the moment of booking.

Mix designs and bills of materials

Hold the mix design for each product and grade, and compare what a batch should have drawn of cement, aggregate or clay against what stores issued.

Production batches and planning

Plan runs by batching plant, block machine, press or kiln from confirmed orders and regular stock, and record each batch with its date, shift and quantity made.

Test results and quality records

Note cube strength, slump, absorption and dimension results and rejections against each batch, so a load can be traced to the checks it passed.

Raw material and finished stock

Track receipts of cement, sand and clay, issues to batches, and finished stock by state: curing, drying, fired, graded, ready and dispatched.

Weighbridge, dispatch and vehicles

Record gross and tare weights, print the delivery note, and follow each truck and driver from plant gate to site.

Invoices, claims and dealer dues

Raise the invoice from the dispatch, record breakage and return claims with credit notes, and list dues by dealer with the oldest first.

Curing bay and ageing register

Blocks and precast lintels are logged against the bay or tank where they cure. Every batch shows its cast date and the day it becomes fit to lift. The yard supervisor releases only aged stock.

Breakage and rejection log

Cracked tiles, chipped blocks and rejected lintels are entered with the batch, the stage and the cause. Counts roll back to the press or kiln that made them. Plant managers read the pattern before it repeats.

Kiln and press maintenance record

Every kiln, block press and batching plant carries service dates, spares fitted and hours lost. Breakdowns are entered with the batch they interrupted. Stoppages are planned around booked orders.

The records that hold the operation together.

  • Orders and dealer price lists. Book orders from dealers, contractors and project sites against their own rate cards and rebate schemes. Delivery dates, quantities and the site contact for unloading sit on one list.
  • Credit limits and dealer accounts. Set a credit limit and a payment term for each dealer. The order desk is warned whenever a new order, an unbanked cheque or an overdue bill would push the account past either figure.
  • Mix designs and bills of materials. Hold the recipe for each product and grade, with cement, sand, coarse aggregate, fly ash, admixture and water quantities per batch or per unit. Planned use is then compared with what stores actually issued to the mixer.
  • Production planning and batches. Plan by vibro-press line, mould or kiln car. Every pour is logged with its date, shift, count made, pieces broken in handling and the cement and aggregate drawn.
  • Test results and quality records. Enter cube strength, water absorption, efflorescence and size checks against a batch. Units that fail are held out of finished stock until someone signs them off or scraps them.
  • Raw material stock and purchasing. Receive cement, aggregate, clay, fly ash, admixtures, diesel and kiln fuel from suppliers, issue them to batches and reorder when a level falls. Silo and yard bin balances are read together.
  • Finished stock by stage. Show units as in the mould, steam chamber, kiln, sorting bay, ready or dispatched. The sales desk quotes only what can be loaded today, and a pallet is never counted twice.
  • Weighbridge and dispatch. Record gross and tare weight, vehicle number and driver name at the weighbridge. Print the delivery note and link it to the batches that supplied the load, whether pavers, blocks or ready-mix.

Operational bottlenecks to check

Batches are not linked to tests

A 28-day cube result or an absorption figure sits on a lab sheet, while the dispatch sits on a weighbridge slip in another drawer. When a contractor complains about crumbling hollow blocks, nobody can name the batch the truck was loaded from.

Mix and consumption drift apart

The mix design calls for one weight of cement, fly ash or clay and the store issues another. The variance surfaces at stock-taking, long after the batch was cast.

Stock is counted in several states

Green, curing, fired, graded and saleable units are all tallied by hand on a clipboard. Sales promises glazed tiles still in the kiln or lintels still in the curing yard.

Dealer terms are scattered

Rates, rebates and credit limits for each dealer are held by different people. A load leaves for a dealer already over the credit limit, and the gatekeeper had no way to know.

Dispatch and billing are separate

Weighbridge tickets, delivery notes and invoices are written by different hands, so tonnes billed and tonnes delivered differ, and a short-load claim follows.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Order

    A dealer, a contractor or a project site places an order. It is booked against the account’s rate card, its rebate scheme and its credit limit, so the price and the exposure are both visible at booking.

  2. 2. Production plan

    Confirmed orders and standing stock lines become a plan by vibro-press line, mould or kiln. Cement, coarse aggregate, quarry dust, clay and admixtures are checked against the mix design before the run starts. Shortfalls surface early.

  3. 3. Batch and material

    Stores issues cement and aggregate against the batch number. Then the supervisor records the casting date, the shift, the quantity made and the wastage from broken units.

  4. 4. Curing and testing

    Units move through steam curing, water curing, drying or firing. Samples go to the lab, and the 7-day and 28-day cube result or the absorption figure is entered against the batch before the pallets are released to the yard.

  5. 5. Dispatch

    Vehicles are weighed in and out on the weighbridge. Loads are drawn from released batches only, and the delivery note prints at the gatehouse with the batch numbers on it.

  6. 6. Invoice and collection

    The dispatch record raises the tax invoice for the load. Receipts, breakage claims and credit notes are posted against it, and the dues of each dealer are followed from the oldest bill.

Roles and responsibility boundaries.

For owners and works heads

See open orders, batches cast, stock by stage, trucks dispatched and dues by dealer on one screen. A walk round the yard is no longer the only way to know.

For the sales and order desk

Book orders, check rates and limits, and tell a dealer exactly what can be loaded this afternoon and what must wait for curing.

For production supervisors

Record batches, broken units and cement drawn, and read the plan for each press line or kiln before the shift begins.

For the lab and quality team

Enter cube, absorption and size samples against batches, and mark failed units so that none ever reaches a truck.

For stores, dispatch and accounts

Issue material, weigh vehicles, print delivery notes, raise invoices and post receipts, all from the same batch and dispatch records.

Reports your managers need.

  • Orders open and delivered by dealer
  • Production by batch, line and shift
  • Raw material used against the mix design
  • Test results by product and batch
  • Finished stock by stage
  • Loads dispatched by vehicle and destination
  • Dues by dealer, oldest first

Connections to scope

  • WhatsApp or other messaging
  • SMS
  • Email
  • Weighbridge indicator
  • Barcode scanners
  • Accounting software export

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Products and mix designs

Product types, grades, recipes and units of sale go in first, in the terms your yard uses when it casts and quotes: 100 mm solid block, 60 mm interlocking paver, M25 kerbstone.

Process stages

Your own stages, whether steam curing, air drying, kiln firing or grading, become the states that stock moves through. Sales reads them in familiar words.

Test plans

The tests you run, the sample size and the pass limits are entered with your lab staff during implementation. Which standard applies, such as the cube strength clause of a national block specification, is for your quality team to confirm.

Dealers and balances migrated

Dealer accounts, rate cards, pending orders and unpaid invoices are brought over from your ledger or spreadsheet. The accounts head checks a sample before go-live.

Currency and tax settings

Dealer invoices for each country carry that country’s currency and tax rules. Both are confirmed with GullySystem staff while the rollout proceeds.

Hosted by GullySystem

The plant, the lab and the sales office read one shared set of records, held on servers that GullySystem runs. Edits to recipes and rate cards come from GullySystem staff on request.

Limitations to settle before implementation

  • A small yard turning out a few hundred solid blocks a week for neighbours will cope with a ledger book and a printed rate card.
  • Businesses that only buy and resell material will find Building Material Trading Software closer, and general plants may prefer Manufacturing Production Management Software.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Builders and developers on live projects
  • Dealer and hardware shop network
  • Contractors and mason groups
  • Architects and structural consultants
  • Government and public sector supply, with your own documents kept ready
  • Individual house builders through dealers
  • Export enquiries for tiles and fittings
  • Pre-monsoon and post-monsoon order pushes
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements