Skip to main content
GullySystem
Manufacturing

Batch and Serial Tracking for Concrete block manufacturers

Trace goods using batch identifiers or individual serial numbers.

Manufacturing

Does this function belong in your operation?

Use when physical goods require lot history, expiry control or individual identification.

Traceable goods are received, produced or moved.

Every press run takes a batch number carried to the curing rack and the delivery slip. A site complaint quotes that number. The yard traces the mix and tests behind it.

Bring the records the workflow depends on.

  • Item tracking rules
  • Batch or serial identifiers
  • Movement and expiry records

Outputs to check

  • Lot or unit movement history
  • Trace-forward and trace-back report
  • Held or expiring stock list

Follow the batch and serial tracking workflow.

Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.

  1. 1. Set tracking rules

    Identify which items require lot, serial or expiry details.

  2. 2. Capture identity

    Record the required reference at receipt or production.

  3. 3. Carry it through movement

    Preserve identifiers during transfer, issue and supply.

  4. 4. Control held stock

    Apply the authorised inspection or restriction decision.

  5. 5. Trace an issue

    Find source and destination records for the affected lot or unit.

Who uses the module, and who approves?

Keep responsibilities distinct even when one person holds more than one role.

Storekeeper

Records the batch at goods receipt and issues the oldest one first.

Quality checker

Holds a batch, releases it, or marks it rejected, and the stock obeys.

Service desk

Types a serial number and sees the sale date, the warranty and every visit made since.

Owner

Asks one question after a complaint: who else received it.

Decide how exceptions are handled.

These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.

Unknown batch at receipt

Hold the affected quantity until identification is resolved.

Duplicate serial number

Investigate the physical units and source entries before accepting another movement.

Batch put on hold

Prevent the agreed issues or sales and record the authority that later releases it.

Can this work independently?

Traceability requires identifiers on the physical goods and their recorded movements. It can run from controlled imports, but goods receipt, production, stock and sales must preserve the same references. A trace report cannot recover identifiers that were never captured at a handoff.

Systems and records it connects with

  • Goods receipt: Counted, accepted and rejected supplier-delivery quantities.
  • Stock: Item-location quantities and authorised stock movements.
  • Quality control: Inspection results and authorised hold or release decisions.
  • Invoice management: Issued invoice references, line amounts and outstanding balances.

Configure, test and introduce the workflow.

  • You tell us which items carry shelf life or serials. We write back how each will be numbered.
  • The storekeeper shows how goods arrive. You get a goods receipt screen to try, with a field for the supplier’s lot. Send current stock. A trial import comes back with gaps listed for the team to fill, using whatever batch details exist.
  • Counter and service staff practise. They issue by batch and look up a serial, and you get a trained group and a corrected import.

Check the result before rollout.

Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.

  • Tracked items cannot move without required identifiers.
  • Serial references do not duplicate active units.
  • A lot can be traced to its recorded recipients.
Concrete block manufacturers

How the business operates.

Blocks look identical on a pallet, yet they differ in cement ratio, wet density and the days spent under tarpaulin. A mason who finds hairline cracks in a parapet wants to know the batch. Few yards can say.

Mix design register

Hold each block type with its cement, sand, aggregate and water ratio, plus the batch weighed out for a shift, so a change of mix leaves a dated entry. Earlier mixes are never overwritten.

Press run log

Record every run by press, mould size, operator and pallet count, with rejects and cracked units noted before the green blocks leave the machine.

See the full industry workflow, reports and implementation plan →

The records that hold the operation together.

  • Block orders and rate cards. Enter hollow, solid and paver orders by size and site, with the per-piece rate agreed for each builder so the invoice repeats the quotation.
  • Mix design register. Hold cement, river sand, 6 mm aggregate, fly ash and water per block type, with a dated version each time the recipe or the water-cement ratio changes.
  • Raw material stock. Track cement bags, crusher dust, sand, fly ash and plasticiser from receipt to the mixer hopper, with a reorder level for each silo and bin.
  • Batching and press run log. Record each pan mixer charge and each press run by machine, mould, operator and pallet count, with rejects and broken units tallied at the press.

Operational bottlenecks to check

Mix changes are not written down

Cement content drifts with the price per bag and the moisture in the sand, and the press operator adjusts by eye. Weeks later, nobody can match a failed batch to the mix that produced it.

Curing days are guessed

Blocks sit in the yard for an unknown number of days before loading. A customer in a hurry takes green units, and cracks show up on the gable wall. The yard hears about it last.

How work flows across this business

This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.

  1. 1. Order

    A builder, dealer or housing site orders 200 mm hollow, solid or interlocking paver units by size for a delivery date. Rate and carriage sit on the order.

  2. 2. Mix and material issue

    The supervisor picks the mix version for the block type, then cement, crusher dust and fly ash are issued to the pan mixer against it and deducted from stock. Each charge is weighed once.

  3. 3. Pressing

    The operator records each run by press, mould and pallet count, with rejects and the cause of any stoppage, such as a hydraulic hose or a mould change. Green blocks go to a curing bay. Bay and press date are noted.

  4. 4. Curing and testing

    The system counts the days each stack has cured. A sample is drawn at the age you set, crushed on the compression machine or measured for size, and the result is attached to that run.

  5. 5. Dispatch

    Loaders lift only cured stacks. A delivery note records the count by size, the vehicle and the driver, and yard stock falls by the same figure.

  6. 6. Billing and collection

    Delivered counts become an invoice at the agreed rate per piece, and breakage claims are netted off on the same builder account. Payments post as they arrive.

Industry reports to connect with

  • Pallets pressed by machine, mould and shift, with rejects
  • Cement and fly ash consumed against blocks pressed
  • Stacks standing in each bay by days cured
  • Cube crushing and dimension results by lot

Questions before implementation.

When should concrete block manufacturers consider batch and serial tracking?

Use when physical goods require lot history, expiry control or individual identification. Traceable goods are received, produced or moved.

What should we bring to the requirements discussion?

Bring anonymised examples of Item tracking rules; Batch or serial identifiers; Movement and expiry records. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.

Does this replace our existing business software?

The starting point is your current system and the gap you need to close. Trace goods using batch identifiers or individual serial numbers. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.

What is outside this module?

Traceability does not replace product testing, recall decisions or regulatory obligations.

How are scope, price and rollout decided?

The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Tracked items cannot move without required identifiers. Use this check when reviewing the first working version.

Talk to us

Discuss batch and serial tracking for your business.

Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements