Skip to main content
GullySystem
Manufacturing

Business solutions for Control panel manufacturers

Explore software for work such as “Reaching machine builders and system integrators in your region”. Review each business function below, including when it fits and what to check before implementation.

Control panel manufacturers

How the business operates.

An order arrives as a single-line diagram, a load list and a consultant’s specification. You size the enclosure and copper busbar, price moulded case breakers, contactors, soft starters and relays, and send a general arrangement drawing for approval. Revision C is not revision B. Parts are bought against whichever one the customer signed, and a large air circuit breaker or drive can set the delivery date.

Enquiry pricing from load lists

Price a board from the load list and single-line diagram using your rates for enclosures, copper busbar and breakers.

Drawing revision control

Hold each general arrangement and schematic revision with the consultant’s approval status and comments.

Panel component lists

Keep the bill of components per panel, with counter substitutions recorded so it matches what was fitted.

Procurement against lead times

Order drives and air circuit breakers by panel and see which late item holds which delivery.

Build, wiring and test records

Track each cabinet through fabrication, plate mounting, wiring and test, with insulation readings kept on the panel record.

Dispatch and as-built set

Release the as-built drawings, test sheet and rating plate details with the delivery note.

Customer inspection and witness tests

The buyer’s inspector is booked for a witness test on the finished panel with the test sheet and any drawing points. Signed results are saved with the panel. Dispatch waits for the inspection release.

Copper and busbar stock

Copper bars, flexibles, lugs, insulators and heat-shrink sleeves are stocked by size and current rating. Offcut lengths go back to the rack. Fabrication draws against a panel’s busbar cutting list.

Site commissioning and warranty

Engineers record energising checks, relay settings, protection test results and handover to the client’s electrician. Warranty starts from the handover date. Site faults are logged against the panel serial.

Recommended spares list

A spares list of fuses, contactors, relays and indicator lamps is issued with each panel and priced. Customers order from it later. Sales staff see which panel a spare belongs to.

The records that hold the operation together.

  • Load list enquiries. Enter motors, feeders and control functions from the customer’s load list, then pick the panel type, whether an MCC bay with withdrawable starters or a changeover panel with an ATS controller. Enquiries start here.
  • Panel pricing. Price enclosure, tinned copper bar, components and labour from rate tables, and keep every revision of the offer that went out. Compare any two side by side.
  • Drawing revisions. Hold general arrangement and schematic revisions with their comment rounds, and mark the single one approved for release to the bay. Every other print is locked out of circulation.
  • Panel component lists. List the MCCBs, contactors, relays and terminal blocks for each cabinet, with any substituted make shown beside the specified one. Totals follow without a second spreadsheet.
  • Component orders and lead times. Raise supplier orders per panel and watch the promised date of every drive and breaker, so that a late line names the cabinet and the customer it holds. Chasing becomes specific.
  • Component store and kitting. Receive parts by lot and kit them to the cabinet, with reorder levels for ferrules, cable lugs, end clamps and control cable. Shortfalls show at kitting, not at the wiring bench.
  • Cabinet build jobs. Follow each cabinet through enclosure fabrication, back plate mounting, wiring and ferruling, with the wiring team named at every stage. The office reads progress without walking the bay.
  • Outside fabrication. Send enclosures and busbars out for punching, bending or powder coating, and check the quantity that comes back against the quantity sent. Short returns are flagged on the day.

Operational bottlenecks to check

Drawing revisions drift from the shop floor

Schematics are revised after the consultant’s comments, yet the wiring team may still hold the earlier print on the bench, because nobody collected it when the new sheet was issued. The board is wired to the wrong revision. It surfaces at the megger test and goes back to the bay.

Component lists are rebuilt for every panel

Breakers, contactors, thermal overload relays, DIN rail terminals, ferrules and drives are listed in a spreadsheet per job, and each copy drifts. Substitutions made at the counter are not written back. The as-built list then differs from the drawing that was approved.

Lead times are known to one buyer

Which variable frequency drive, soft starter or air circuit breaker is late sits in one buyer’s inbox. Nobody else sees it. The project manager learns of it when the customer calls about the dispatch date.

Test results live on loose sheets

Insulation resistance readings, relay trip settings and witnessed test signatures are on paper or in phone photographs. Finding them for a warranty claim means searching folders. It rarely goes well.

Panel serials and nameplates are not linked

Rating plate details such as rated current, short-circuit withstand and serial are typed separately from the drawing set. A service engineer on site cannot tell which as-built folder belongs to which cabinet.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Enquiry and load list

    A customer sends a single-line diagram and load list, and each DOL starter, star-delta set, feeder and control function is entered before the panel type is chosen. Nothing is retyped later.

  2. 2. Quotation

    The panel is priced from enclosure, busbar, component and labour rates, and because customers keep changing motor ratings, every revision of the offer is kept with the figures that were sent. Old offers stay readable.

  3. 3. Drawings and approval

    General arrangement and schematic revisions go out for comment, remarks are logged by round, and only the approved revision is released to the wiring bay. Older prints are withdrawn at once.

  4. 4. Procurement and kitting

    The component list becomes supplier orders for MCCBs, thermal overload relays and DIN rail terminal blocks, and parts that arrive are checked against the list and kitted to the cabinet. Shortages show early.

  5. 5. Build, wiring and test

    The bay cuts the enclosure, mounts the back plate, then wires and ferrules the cabinet, and the test engineer records megger and functional readings against the approved drawing. A witnessed test carries the witness’s name.

  6. 6. Dispatch and service

    As-built drawings, the test sheet and nameplate details travel with the delivery note, and later site calls are logged against the cabinet serial. The record stays open for the life of the panel.

Roles and responsibility boundaries.

For panel designers

Release schematics, answer customer comments on each revision, and see which revision every cabinet in the bay is built to. Stale prints stop circulating from the first release.

For the purchase desk

Raise component orders per panel and chase the VFDs and air circuit breakers that are running late, with the cabinet and customer named on every line. No more bare order numbers.

For store staff

Receive components against the list, flag any substitution, and kit lugs, ferrules, relays and breakers to the right cabinet. Leftover pieces go back to stock with their lot.

For wiring supervisors

See which cabinets have their kit and approved drawing, assign wiring teams, and mark stages complete. A cabinet without a full kit cannot start, so benches stay busy.

For test engineers

Enter megger and functional readings, note who witnessed the test, and send a failed cabinet back with a remark. The report prints from the same record, with the serial on top.

Reports your managers need.

  • Panels by build stage and customer
  • Schematic revisions awaiting approval by age
  • Late VFDs and breakers by the panel they hold
  • Megger and functional failures by type and cabinet
  • Quoted against actual enclosure, busbar and component cost
  • Open site calls by cabinet serial

Connections to scope

  • Email
  • WhatsApp
  • Accounting export
  • Label printer
  • Drawing file storage

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Panel types

Motor control, power control and automation panels are set up with the build stages your bay follows, from back plate mounting to ferruling and door-mounted devices.

Component catalogue

Makes, ratings and reorder levels for MCCBs, contactors and terminals are loaded with the suppliers you buy from, so the first component list needs no retyping.

Test sheet layouts

Megger readings and limits follow your inspection routine and whatever each customer’s specification asks for. The layouts are yours, down to the column order.

Opening records

Panels in progress, drawing revisions and supplier orders are copied in from the workbooks your office keeps, and the design office checks them before real orders begin on the new system.

Currency and tax

Quotes for a control panel can be priced in the buyer’s money, and the invoice applies whatever tax rules govern that buyer’s country. Exports follow the same rule.

Limitations to settle before implementation

  • A site electrician who wires one small distribution board a month can work from a notebook.
  • Companies that only trade in ready-made enclosures have no schematic revisions to control.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Reaching machine builders and system integrators in your region
  • Turning one OEM job into a standing arrangement
  • Qualifying sketch-stage enquiries before an engineer spends a day on them
  • Showing finished panels with the drive, PLC and test details
  • Winning retrofit and upgrade work from existing plants
  • Being found for PLC and VFD panel searches
  • Following up every open quotation
  • Keeping past customers informed about spares and upgrades
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements