Business solutions for Electrical equipment manufacturers

Explore software for work such as “LT panels and motor control centres”. Review each business function below, including when it fits and what to check before implementation.

Electrical equipment manufacturers

How the business operates.

You make low-voltage panels, motor control centres, power factor correction panels, high-voltage switchgear, distribution transformers or busducts, mostly against a purchase order carrying its own specification. Very little is built for stock.

Order-wise bill of materials with revisions

Keep the material list for each panel or transformer against the drawing revision, with sub-assemblies such as busbar sets, cores or windings carrying their own lists. A unit built to an older revision stays identifiable.

Shortages turned into purchase orders

Set the bill of materials against stock, raise purchase orders from the shortage list, and receive breakers, relays and copper with an inspection entry.

Job cards through each shop stage

Move every order through sheet metal, busbar, assembly, wiring or winding and testing, with quantity, operator and shift on each card.

Test readings and inspection hold

Record routine test readings against the order and hold it until quality clears it for the buyer’s inspection call.

Powder coating and outside machining

Track enclosures sent for powder coating or parts sent for machining and galvanising, and reconcile what came back against each delivery note.

Dispatch, invoices and order outstanding

Raise the dispatch note and tax invoice from the closed work order, then read what each buyer still owes against that order.

Drawing approval register

General arrangement drawings go to the client or consultant and are logged with comments and the approved revision. Shop floor release waits for approval. Design staff see which orders are still stuck.

Busbar and copper cutting list

Copper bars for each panel are cut to a list of lengths, bends and drilled holes. The shop records offcuts returned to the rack. Costing sees the weight actually used.

Type test certificate file

Switchgear and transformer designs carry type test reports from the test laboratory. Sales staff attach the right report to a tender. The file shows the design revision covered.

Site defects and call-backs

After dispatch, the service engineer logs each fault found at commissioning against the panel serial. The works manager sees repeat defects by design. Fixes are tracked until the client signs off.

The records that hold the operation together.

  • Customer specification and approved makes
  • Drawing revision, comments and approval
  • Order-specific bill of materials and shortage list
  • Stage job card, serial number and test readings
  • Inspection release, dispatch note and invoice

Operational bottlenecks to check

Drawing approval stalls unnoticed

A GA drawing sits with the consultant for comments, and purchase cannot book breakers until it returns. No one owns the follow-up.

Bought-out items arrive after the enclosure

Breakers, relays and meters are booked late against a bill of materials kept in Excel. The finished enclosure waits empty.

The wiring bay builds from an old print

Comments on the approved drawing reach the office, but the bay works from the earlier revision. Rework follows at inspection.

Test reports are typed again for each dispatch

Routine test results, serial numbers and component makes are copied into every report from scattered sheets. Mistakes reach the inspector.

The last instalment drifts out of sight

Money held until commissioning and the end of the defect liability period sits in an accountant’s sheet, order by order. Old balances get forgotten.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Review the enquiry

    Record the technical requirement, approved makes and deviations. Link the priced quotation to the specification used for it.

  2. 2. Approve drawings and material lists

    Retain customer comments and release a named drawing revision with its bill of materials. Hold unapproved changes outside the shop instruction.

  3. 3. Procure and build

    Order shortages and issue accepted components to the job. Record the applicable fabrication, assembly, wiring or winding stages.

  4. 4. Test and obtain clearance

    Attach test readings to the order or serial number. Quality controls the inspection call, observations and clearance to dispatch.

  5. 5. Dispatch and follow the order

    Send the identified equipment with its approved documents. Link later commissioning faults and customer payments to the same order.

Roles and responsibility boundaries.

Estimation and design engineers

Estimation prices the specified equipment and records deviations. Design controls customer comments and approved drawing revisions.

Purchase and shop supervisors

Purchase follows bought-out components and shortages. Supervisors record enclosure, busbar, assembly, wiring or winding work against the released order.

Quality, dispatch and accounts

Quality records test evidence and inspection clearance. Dispatch identifies the equipment shipped; accounts follows the order invoice and outstanding amount.

Reports your managers need.

  • Drawing approvals awaiting action
  • Bought-out component shortages by order
  • Stage completion and inspection holds
  • Order dispatch, invoice and receivable position

Connections to scope

  • Drawing repository: approved versions and comments
  • Accounting: supplier purchases and customer invoices
  • Test records: serial-linked readings and approved reports

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Agree the revision rule

Define which approval releases a drawing and how a change affects material already ordered or equipment already assembled.

Trial one equipment order

Follow a sample order through shortages, build stages, inspection and dispatch. Include a component substitution requiring approval.

Set up inspection and handover

Train design, stores, production and quality on their hand-offs and on keeping the final document set attached to the shipped unit.

Limitations to settle before implementation

  • Electrical design, test limits and acceptance remain with qualified engineering and quality personnel.
  • Product certification or test compliance is not established by storing a certificate or reading in software.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • LT panels and motor control centres
  • Distribution boards and MCBs for housing projects
  • Industrial high-bay and warehouse lighting
  • Street and area lighting for municipal and campus tenders
  • Architectural and façade lighting for hotels and retail
  • Decorative and residential lighting through interior designers
  • House wires and building cables through dealers
  • Modular switches for builder tie-ups
  • Transformers and power equipment for factories
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.