Skip to main content
GullySystem
Manufacturing

Business solutions for Furniture manufacturers

Explore software for work such as “Modular kitchens and wardrobes”. Review each business function below, including when it fits and what to check before implementation.

Furniture manufacturers

How the business operates.

You make sofas, divans, wardrobes, dining sets and office workstations. Some are catalogue models for dealers. The rest are built to order, with the buyer’s carcass width, upholstery swatch and veneer shade pencilled on a drawing.

Showroom orders to factory work orders

Convert a showroom order into a factory work order that carries the sketch, carcass sizes, fabric code and veneer shade. The two products are joined at set-up, so nothing gets retyped on the way to the shop.

Material list and cutting list

Draw up the list of materials per order for pre-lam board, MDF, laminate, edge tape and fittings. The cutting list then reaches the beam saw on a job card, one sheet for each order and one line for each panel.

Job work dispatch notes

Log frames and tabletops sent for lacquer or upholstery, and note what came back. The balance sitting at every vendor stays on screen, down to the last leg.

Stock of boards and hardware

Hold stock by board thickness, make and fitting type. Shortages against open orders are listed for purchase well before the beam saw runs dry.

Delivery and installation schedule

Plan the dispatch date, the fitting crew and site snags against the order. A customer asking about a dining set can be told exactly which stage it has reached.

Material and labour by order

Record board, fittings, foam, job work and piece-rate output against the work order. A cost-per-piece view is added during implementation, so the next quotation stands on a real figure.

Offcut and leftover board register

Leftover plywood, MDF and laminate sheets are measured and listed after each cutting job. Planners check the list before ordering fresh boards. Small orders such as shelves are cut from offcuts first.

Finishing and polish queue

Every piece waiting for sanding, stain, lacquer or upholstery appears in one queue with its colour code. Finishing supervisors see what is drying and what is blocked. Assemblers know when a frame returns.

Warranty and repair complaints

The record notes the fault, the visit and the fix. Owners see which model fails repeatedly.

Timber and hardware supplier rates

Current rates for teak, plywood, hinges, channels and fabric are held per supplier with the date each was quoted. Buyers compare before ordering. Estimators read the same figures when pricing a new design.

The records that hold the operation together.

  • Customer order and approved sketch or drawing
  • Material list, cutting list and board or hardware issue
  • Stage job card and outside-processing dispatch
  • Finish, shade, fitting and packing check
  • Delivery, installation acceptance and balance-payment record

Operational bottlenecks to check

Orders reach the factory late

The showroom’s order book and the factory’s cutting register are separate notebooks, and the gap between them belongs to nobody. Saw operators cut whichever sketch reached the shop first, not the one promised to a customer for Friday.

Material is short when cutting starts

No bill of materials was drawn up, so laminate, edge tape or hinge sets run out halfway through a wardrobe and the job halts. The beam saw idles while a dealer is phoned.

Pieces sent out for finishing go missing

Tabletops sent for lacquer and sofa frames sent for webbing and foam come back incomplete, and the dispatch slip never shows what still sits at the vendor. Nobody notices the missing legs or seat cushions until the buyer asks.

Profit on custom orders is unknown

Board, hinges, foam, carpenter hours and lacquer are never costed against the order, so the next quotation for a similar six-door wardrobe is a hopeful guess.

Piece-rate wages are added up by hand

Carpenters and polishers earn per piece or per square foot, tallied from a pocket diary at week end. Each Saturday brings arguments over a missed drawer unit or a disputed headboard.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Approve the order specification

    Record dimensions, materials, finish and installation scope before releasing the order to the factory.

  2. 2. Plan materials and cutting

    Prepare the material and cutting lists, check boards and fittings, and record any approved substitution or shortage.

  3. 3. Build and track outside work

    Record shop-stage progress and reconcile parts sent for finishing or upholstery with the items returned.

  4. 4. Inspect and prepare delivery

    Check the finished pieces against the released specification and record rework, packing and delivery readiness.

  5. 5. Install and settle

    Record delivery, installation observations and customer acceptance. Reconcile approved changes and the remaining payment against the order.

Roles and responsibility boundaries.

Showroom or design coordinator

Records the customer order, approved dimensions, finish and installation requirements and passes the released version to the factory.

Factory supervisor and material store

Controls the cutting list, board and hardware issues, shop stages and outside finishing or upholstery work.

Quality, fitting and accounts teams

Checks the finished pieces, records delivery and installation acceptance, and reconciles the customer’s advance and remaining balance.

Reports your managers need.

  • Order progress from cutting to installation
  • Board and hardware shortages
  • Outside-processing items awaiting return
  • Rework, installation observations and customer balances

Connections to scope

  • Showroom orders: approved specifications and advances
  • Production records: material issues and job-stage output
  • Accounting: supplier costs and customer settlement

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Agree the order identifier

Keep one reference across showroom, factory, outsourced work and installation.

Trial a made-to-order job

Test a drawing revision, board shortage and outside-finishing return before accepting the finished pieces.

Train factory and fitting hand-offs

Agree who records readiness, rework and customer acceptance so delivery does not prematurely close an incomplete installation.

Limitations to settle before implementation

  • Joining showroom orders to production and installation requires explicit implementation scope.
  • The system records specifications and checks; craft quality and structural suitability remain with the responsible designers and makers.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Modular kitchens and wardrobes
  • Office workstations and seating
  • Sofas, beds and dining furniture
  • Outdoor and garden furniture
  • Made-to-order carpentry
  • Hotel and hospitality furniture contracts
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements