Skip to main content
GullySystem
Home services

Business solutions for Painting contractors

Explore software for work such as “Full house interior repainting”. Review each business function below, including when it fits and what to check before implementation.

Painting contractors

How the business operates.

Painting looks simple and leaks money in the details: an extra putty coat nobody quoted, a shade changed after the first wall, and buckets that never came back from site.

Room-wise measurement sheet

Record rooms, walls, ceilings, doors, windows and grills with their sizes, and work out paintable area by surface, because a stairwell is not a bedroom.

Quotes by surface and coat

Price interior, exterior, wood and metal work from your own rate card, by area and by coat, with the prep work written into the scope.

Shade and product record

A record of brand, product and shade code for every wall, kept against the customer, is a custom addition.

Dealer account and site stock

Record dealer purchases, tins sent to each site, tins returned and the balance owed to each dealer, set beside what the quote expected for that area.

Foreman, painter attendance and wages

Mark daily attendance by site for painters, helpers and the foreman, with advances given and the balance due. Wages come from days worked or area painted.

Snag list and shade handover

List the walk-through points room by room, assign each to a painter, and close them before the final bill. A shade handover sheet can be added as an extra.

Scaffolding and ladder register

The register lists scaffold towers, ladders and sprayers by site and the foreman holding them. Hire and return dates sit beside each. The yard manager sees what is out before a new job starts.

Extra work approvals

A homeowner asks for the balcony grill to be done as well. The approval record holds the added area, the price and who agreed. Nothing is painted before it is signed.

Stage payment schedule

Large repaints are billed in stages, such as after putty, after primer and on handover. Each stage carries an amount and due date. Accounts staff raise the bill when the foreman marks the stage done.

Repaint call-back log

Peeling, patchy shade and damp stains reported after handover go into a call-back log. It shows the wall, the cause and who returns to fix it. Warranty terms stay linked to the original job.

The records that hold the operation together.

  • Enquiries and site visits. Log enquiries by address and type of work, such as distemper, texture, enamel or waterproofing. Schedule the visit. Chase every quotation that nobody answered.
  • Site measurement sheets. Record rooms, walls, ceilings, doors, windows and grills with their sizes. The system works out paintable area by surface, after deducting openings and adding the extra for cornices and beading.
  • Quotations and estimates. Price interior, exterior, wood and metal work from your rate card by area and coat. The scope is written out, including crack filling and damp treatment.
  • Paint and material planning. Work out wall putty, primer, emulsion, thinner, masking tape and sandpaper for a site from its measured area and number of coats, using the coverage figures you trust for each product.
  • Crew allocation and attendance. Assign painters, helpers and foremen to sites by day. Mark who was present where, including the half days when a crew split between two flats.
  • Job progress by coat. Tick off sanding, putty, primer and each finish coat room by room. Every site shows its stage at a glance, and the owner sees which flats are waiting on a second coat.
  • Stage billing and payments. Raise advance, running and final bills by agreed stage, with tax where it applies. Each payment is recorded against the bill it settles.
  • Dealer purchases and site stock. Record paint dealer purchases, tins sent to each site and tins returned. The dealer’s balance sits beside them.

Operational bottlenecks to check

Paint runs out mid-job

The estimate missed a putty coat, and a gang of six stops for half a day while somebody rides to the dealer. The whole day is lost.

Nobody recorded the shade code

The customer wants a touch-up after a leak repair, and the colour is now a guess with a fan deck. Nobody enjoys that call.

Wages and days do not add up

The supervisor’s attendance and the foreman’s count differ every week, and the difference always runs in the same direction. The gap is never explained.

The final bill waits on the snag list

Patches called out at the walk-through live on one supervisor’s phone, so nobody can say which rooms are still open.

A housing committee has twelve decision-makers

The committee changes the shade in a meeting you were not at, and nobody records who approved it. The dispute reaches you later.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Enquiry and site visit

    An enquiry arrives by phone, WhatsApp or a referral. It is logged with the address, the type of work and a date for the site visit.

  2. 2. Measurement and quotation

    Rooms, walls, ceilings, doors and grills are measured at the visit. The quote prices putty, primer, emulsion or enamel by area and coat, and lists the scope so the client knows what is included.

  3. 3. Planning the site

    After confirmation, tins and consumables are worked out from the measurements. Scaffolding is booked for exterior faces. A start date is set and a crew allotted.

  4. 4. Work at the site

    The supervisor marks the crew present. Sanding, crack filling, putty, primer and each coat are ticked off room by room as the painters finish.

  5. 5. Stage billing

    A bill is raised at each agreed stage, such as advance, after putty and primer, and on completion. Payments are recorded against it.

  6. 6. Handover and follow-up

    The snag list is closed with touch-ups and the final bill is settled. Clients stay on record for repainting and for referrals to their neighbours.

Roles and responsibility boundaries.

For owners

See quotes won and pending, sites running, client dues, dealer balances and what each site has cost.

For estimators and site visit staff

Record measurements, prepare quotes from the rate card and follow up on pending replies.

For site supervisors

See the crew and the day’s work per site. Mark attendance, tick off coats and note snags.

For accounts

Raise stage bills, record payments, keep dealer and painter balances and prepare figures for the accountant.

Reports your managers need.

  • Quotations sent, won and pending by month
  • Sites running and the stage each has reached
  • Paint and material used against the plan for each site
  • Painter days and wages payable
  • Stage bills raised and payments due from clients
  • Dealer purchases and balance owed to each dealer

Connections to scope

  • WhatsApp
  • SMS
  • Email
  • Payment links and gateways
  • Accounting software export

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Your rate card and surfaces

Interior, exterior, wood, metal and texture work are priced the way you quote today, by area, by coat or as a lump sum.

Quotation and bill format

Your scope wording, terms and stage plan go into the quotation and the bill, so documents look like the ones you already send.

Clients, dealers and painters migrated

Client lists, open quotations, dealer balances and painter advances arrive from your existing register or spreadsheet.

Wage rules for painters

Daily wage, area-based rates and advance recovery are set the way you pay your crews.

Messages and payments

Quotations and follow-up reminders reach clients through WhatsApp, a text or an email. Wallet and bank transfer receipts are keyed against the stage bill they clear.

Limitations to settle before implementation

  • A lone painter on small jobs may find a notebook and a phone wallet enough.
  • Businesses that run whole-house interiors, carpentry and furnishing will find the Interior Design Management System fits that wider work better.
  • Waterproofing and chemical treatment contracts keep different records and are better served by a separate product.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Full house interior repainting
  • Exterior and waterproofing combined jobs
  • Festival season bookings
  • New home and builder handover painting
  • Texture and decorative finishes
  • Commercial and office repainting
  • Wood polishing and finishing
  • Annual maintenance painting contracts
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements