Skip to main content
GullySystem
Manufacturing

Business solutions for Precision component manufacturers

Explore software for work such as “Multi-process parts from one shop”. Review each business function below, including when it fits and what to check before implementation.

Precision component manufacturers

How the business operates.

You turn, mill and grind shafts, bushes, spindles and dowel pins to a drawing, and a micrometer, bore gauge or CMM decides whether each one passes. Runs are short. The same bush returns under a new revision letter.

Enquiries, drawings and revisions

Log each enquiry with its drawing and keep every revision letter against the part number. The order, the work order and the router all name the agreed revision, and a stale one is flagged before release.

Routers, work orders and job cards

Set the turning, milling and grinding sequence for each part, release a work order per lot, and record quantity passed, rejected and held at each stage. Operator and shift travel with every card.

Bar, sheet and consumable stock

Count bar, sheet, forgings and consumables by grade, diameter and heat number, with every issue tied to a work order. A tool and insert list is added as custom work.

Inspection readings and rejection

Save first-piece and in-process readings against the lot, hold a batch until the inspector clears it, and count rejection and rework by stage and reason. Gauge calibration dates are a separate addition, built with your quality head.

Job work dispatch notes

Send shafts and bushes out for plating, heat treatment or anodising on a dispatch note, and reconcile what came back against what went. Any shortfall stays on view until it is cleared.

Dispatch, invoices and buyer rejections

Pieces that pass inspection are packed into trays. Quantities on the dispatch papers come straight from what was counted into each tray. Nobody retypes a figure once the packing is done. A register linking each buyer rejection to the lot that shipped is built as custom work.

Machine load and the week’s plan

See the hours queued on each lathe, Swiss-type turning centre, mill and grinder, and move target dates by hand. There is no automatic scheduler.

Tool life and insert register

Cutting inserts, drills and taps are listed by job and machine, with pieces made before change. Operators log a swap. Planners see which tool is near its limit before a long run starts.

Customer first article approvals

First article reports are filed per drawing revision, with the buyer’s sign off and date. The inspector reads them before a repeat lot starts. A revised drawing asks for a fresh approval.

Plating and heat treatment lots

Parts sent for plating or hardening are booked by lot, process and outside vendor. Returns are checked for finish and hardness. Rejected lots stay with the vendor’s name for claims.

The records that hold the operation together.

  • Enquiries and production quotations. Log buyer enquiries with the drawing or sample attached, then cost bar weight, machine minutes and outside plating before a price goes back to the purchasing desk. Every costing revision is kept.
  • Sales orders and delivery commitments. Hold confirmed orders with part number, drawing revision, quantity, rate, schedule and the delivery week promised to the buyer, so a balance after each part delivery is always visible. Late orders stand out.
  • Multi-level bill of materials and routing. Keep each part’s material list and stage sequence. Drawing revisions, scrap allowance, the CNC lathe or press brake each stage runs on and the fixture it needs sit beside it. A sub-assembly carries its own list.
  • Work orders and batch planning. Release a work order for a batch, set its target date, and see the load already queued on each machine and stage. Planners move dates by hand. Overloaded stages stand out.
  • Job cards by production stage. Record quantity passed, rejected and held at sawing, turning, milling, welding, assembly, painting and packing, stage by stage, against the batch quantity on the work order. Each card names the operator and shift.
  • Raw material and consumable stock. Count bright bar, billets, sheets, castings, forgings, resin, fasteners, shrink film and consumables by grade and size, with every issue carrying a work order number. Heat numbers stay with their stock.
  • Purchase orders and supplier records. Raise orders on material suppliers from the shortage list, receive against them with inspection, and keep the supplier ledger and rate history. Rejected lots show by supplier.
  • Quality checks and rejections. Save inspection readings from vernier, bore gauge and torque wrench checks, count rejection, rework and scrap by stage and reason, and hold a batch until it is cleared. First-off approval and final inspection share one record. Each batch traces back to its work order.

Operational bottlenecks to check

An old revision gets machined

A buyer revises a drawing by email, yet the router at the lathe still says revision B. A lot of 800 shafts is bored to the superseded diameter and scrapped, because the email sat in one inbox.

Inspection readings stay on paper

Bore, runout and Ra readings are written on sheets kept in a drawer beside the surface plate. A buyer’s query a month later means digging through that drawer by hand.

Rejection is counted but not explained

Scrap is totalled at month end with no stage, machine or cause beside it, so taper, chatter marks and insert burrs recur on the same bores. Nobody wrote down which spindle ran them.

Job work goes out and is not chased

Shafts sent for plating or case hardening are noted in a bound book, and returns are never set against what left. A short count surfaces only when the buyer’s truck is already waiting at the gate.

Tool and gauge records sit apart

Insert changes live in the operator’s head and calibration dates in the quality head’s diary. Nothing warns before a plug gauge, thread ring or micrometer falls out of date.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Enquiry and costing

    A buyer sends a drawing. The unit works out bar weight, machine minutes and plating charges, and a quotation goes back against that enquiry with the drawing revision noted.

  2. 2. Sales order

    The buyer confirms by purchase order, mail or WhatsApp. Quantity, rate, part number, drawing revision and the promised delivery week go on the order, so planning starts from facts and nothing is retyped.

  3. 3. Work order and material planning

    A work order opens for a batch. The bill of materials lists the bar, sheet or granule that the store must issue by grade and size, with scrap allowance added for the cut length. Shortages go to purchase as a requirement.

  4. 4. Production stages

    The batch moves on its job cards through sawing, turning, welding, assembly or filling, and each stage records quantity passed, rejected and sent for rework. The operator, machine and shift are named on every card, so piece counts reconcile when the batch closes and nobody argues about a shortfall.

  5. 5. Quality and packing

    Final inspection records go/no-go gauge results. Accepted pieces are packed in cartons, labelled and taken into finished goods, while any held lot waits for a decision from the quality head and the planner.

  6. 6. Dispatch, billing and follow-up

    The delivery note and the tax invoice both come from the work order, and payment follow-up is tracked after dispatch along with the next order from the same buyer.

Roles and responsibility boundaries.

For owners

See open orders, work orders by stage, machine load, rejection by reason, bar shortages, dispatches made and money due from buyers, each morning before the first shift starts.

For production planners

Release work orders, read the bill of materials, check material availability and sequence batches on lathes, press brakes and moulding machines, keeping to what the store holds. Dates move after a breakdown.

For shop floor supervisors and operators

See the cards queued for your machine. Mark quantity passed and rejected. Raise a hold on a doubtful piece, and the supervisor sees it before the next batch loads onto the same fixture or press.

For stores and buyers

Issue material against a work order, receive supplier deliveries with inspection, and watch grades that fall below reorder level before the planner notices the shortage. Short bright bar is flagged early.

For accounts and dispatch

Raise delivery notes and tax invoices from closed work orders, record payments, and read buyer outstanding by order, with the gate slip and dispatch date beside each line. No digging through carbon copies.

Reports your managers need.

  • Work orders still open, grouped by stage and promised week
  • Production by stage, machine and operator each shift
  • Material consumed against the bill of materials
  • Rejection and scrap by stage and reason
  • Job work out, returned and short, by job worker
  • Bar, sheet and resin stock against shortages
  • Dispatches and buyer outstanding by order

Connections to scope

  • WhatsApp
  • SMS
  • Email
  • Payment links and gateways
  • Accounting software export (quoted separately)
  • Barcode or label printers
  • Weighing scales
  • Biometric attendance devices

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Your parts, grades and stage names

Part numbers, material grades, sizes and the stage names your floor uses go in, and words like deburr, temper, chamfer or fettle stay exactly as your people say them.

Your bill of materials and revisions

Material lists, scrap allowance and routing per part are entered, and how a drawing revision is numbered follows your present practice in the drawing office. Sub-assembly structures are built from the bottom up.

Issue, rejection and job work rules

Who may issue material, who may pass a rejection and how outside vendors are reconciled are set the way your unit works today. Approvals are added only where you already have them.

Masters and balances migrated

Buyer and supplier lists, item masters, opening bar stock and finished goods arrive from your spreadsheets, and the store checks counts against the racks before go-live.

Hosting across shed, store and office

GullySystem runs the hosting, so the shed, the store and the office all read one set of work orders from a plain browser tab on any phone. When a product changes, our staff add the new stage, jig or part to the routing, and supervisors never have to edit it themselves.

Limitations to settle before implementation

  • A firm that only buys and resells, with no making at all, should look at our wholesale ordering product instead.
  • A single craftsman working to order with no stages, store or job work may find a notebook and a basic invoicing app enough.
  • A plant that runs continuous process control from instruments, with loops tuned on a control panel, needs plant automation rather than a production record system.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Multi-process parts from one shop
  • Medical and instrument components
  • Electronics and connector parts
  • Defence and aerospace vendor registration
  • First article inspection reports
  • Material and lot traceability
  • Export documentation and packing
  • Small-lot and prototype precision parts
  • Sustained supply after approval
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements