Business solutions for Switchgear manufacturers

Explore software for work such as “LT panels and motor control centres”. Review each business function below, including when it fits and what to check before implementation.

Switchgear manufacturers

How the business operates.

A switchboard maker takes sheet steel, copper bar and bought-in breakers, and hands over a lineup of panels that a client’s consultant has already approved on paper. The drawing revision decides what gets built. That is the rule. One late change to a feeder can alter the breaker, the busbar rating and the nameplate.

Feeder schedule and panel bill of materials

Build the bill for each panel from its feeders, so every breaker, busbar section and accessory is listed against the approved single-line diagram.

Drawing revision control

Hold the general arrangement drawing, the consultant’s comments and the approved revision with the order. The floor sees only the revision that was released.

Bought-in component tracking

Track breakers, relays and instrument transformers from purchase order to receipt, with the panel each one is reserved for.

Busbar and fabrication stages

Record cutting, punching, bending and plating of bar and sheet per panel, including pieces sent to an outside process and the date they return.

Routine test records

Capture insulation, wiring and functional test results against each panel serial number, with the witness inspector’s name where the client sends one.

Variations and dispatch

Record each client change as a priced variation, and release the packing papers only after the lineup clears its test.

Type test and certificate register

Type test reports for each panel design, with the test house and date, are held per product. Customers ask for the right certificate at tender stage. Sales staff attach it to quotes.

Short circuit and rating data sheet

Voltage, current rating, fault level and enclosure class are recorded for every panel. Engineers copy them into the drawing and nameplate. The test bay checks them before the panel is energised.

Nameplate and labelling record

Panel and feeder labels, nameplates and warning stickers are listed for each order with the text approved. A reprint is logged. Assembly staff use it to fit the right plate on each cubicle.

Site commissioning and snag list

After delivery, the commissioning engineer records tests done, settings applied and faults found on site. Snags have an owner and closure date. The customer signs the final list.

The records that hold the operation together.

  • Tender and panel templates. Price a lineup from stored incomer, coupler and feeder templates, then adjust ratings and accessories. Every tender revision is kept.
  • Feeder schedule. List each feeder with its rating, breaker type, metering and protection, so the schedule matches the single-line diagram.
  • Drawing revision control. Hold general arrangement drawings, consultant comments and the approved revision. Only the released revision reaches the floor.
  • Panel bill of materials. Break each panel into enclosure, busbar, breaker, relay and wiring items, with the quantity reserved for that feeder.
  • Bought-in components. Track purchase orders for breakers, relays and instrument transformers, with promised dates and the panel each is held for.
  • Busbar and fabrication stages. Record cutting, punching, bending and plating per panel, including pieces out for outside processes and their return.
  • Wiring and assembly board. See which panels are in the wiring bay, which await components and which are ready for the test bay.
  • Routine test records. Enter insulation, wiring and functional test results per panel serial number, with witness inspector details.

Operational bottlenecks to check

Drawing revisions drift from the floor

The consultant approves revision C, but the fabrication team still holds revision B on a printout. A feeder is built with the wrong breaker frame, and the fault shows at the witness test.

Bought-in breakers set the schedule

Breakers, relays and current transformers come from several makers on different lead times. A lineup waits for one missing relay while the finished frames take up bay space.

Busbar work is hard to trace

Copper bar is cut and bent against a drawing, then sent out for plating. Nobody can say which bar length belongs to which panel once it returns in a crate.

Test reports sit in loose files

Insulation readings and functional checks get pencilled onto paper beside the test set. Finding one panel’s report months later means a shelf search. It is slow.

Variations pile up after approval

A client asks for an extra feeder or a changed meter. The cost change travels by phone, and the invoice does not match the order.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Enquiry and tender

    The enquiry arrives with a single-line diagram and a feeder list. The estimator prices each section from stored panel templates and the current breaker prices.

  2. 2. Order and drawing approval

    The accepted order becomes a lineup. The design team issues the general arrangement drawing and tracks consultant comments until a revision is approved.

  3. 3. Component purchase

    Breakers, relays and meters are ordered against panels. Receipts are checked and each item is reserved for its feeder.

  4. 4. Fabrication and busbar

    Frames are cut, punched and bent. Busbar is made to length, with plating or painting sent as outside processes and tracked back.

  5. 5. Assembly, wiring and test

    Panels are wired and fitted. The test bay records insulation, wiring and functional results, and notes any witness inspector.

  6. 6. Dispatch and invoice

    Once a lineup clears test, its nameplates are printed and the packing papers are raised. The invoice follows the order and its priced variations.

Roles and responsibility boundaries.

For the design office

Issue drawing revisions, log consultant comments and release the approved set to the floor.

For estimators and sales

Price lineups from templates, follow tenders and keep each client’s variations against the order.

For stores and purchasing

Order breakers and relays against panels, check receipts and reserve items for their feeders.

For shop floor supervisors

See which panels are in fabrication, wiring or waiting on parts, and record stage completion.

For test bay engineers

Enter routine test readings and note witness visits, panel by panel.

Reports your managers need.

  • Lineups by stage, with panels held for missing components
  • Drawing revisions awaiting consultant approval
  • Bought-in items on order against the panel they are reserved for
  • Busbar pieces out for plating and their expected return
  • Routine test results by panel serial number
  • Variations raised against each order
  • Dispatches and invoices by client

Connections to scope

  • Email
  • WhatsApp
  • Accounting export
  • Drawing file storage
  • Label printer

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Panel templates and ratings

Incomer, coupler and feeder types go in with the ratings you quote, laid out as your estimators build a tender.

Test sheet layouts

Your routine test sheet, fields and acceptance limits included, is rebuilt page for page once your test engineers have looked it over.

Component catalogue

Breaker, relay and transformer makes and part numbers are loaded with their usual suppliers.

Open orders migrated

Lineups under way, their drawing revisions and unpaid invoices are brought over from what you keep today.

Currency and tax

Switchgear orders are priced and invoiced in the customer’s currency under the tax rules of that country.

Limitations to settle before implementation

  • An electrician who wires a few boards on site can work from drawings and a notebook.
  • Makers of cables or lighting fittings will find Cable and Wire Manufacturer Management Software or Industrial Lighting Manufacturer Management Software closer.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • LT panels and motor control centres
  • HT switchgear and ring main units
  • Air and moulded case circuit breakers
  • Distribution boards for buildings
  • Busbar trunking
  • Switchgear for solar and wind plants
  • Retrofit and refurbishment
  • Spares and breaker servicing
  • Utility and PSU rate contracts
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.