In this guide 7 sections
Begin with a single record for each customer site that carries the survey, proposal, material issued, installation stages, utility file, invoices and service visits. Solar Installation Management Software holds that record. Once every team reads and writes the same job, the notebook, the stock register and the paperwork spreadsheet can finally be retired.
Begin with the enquiry and the survey sheet
Every solar job starts as an enquiry. Record each one whether it came from a call, a referral or a website form, assign a surveyor and keep the result on a single survey sheet. Roof orientation, tilt and the shade cast by a water tank or neighbouring wall are noted at the same visit, so sizing rests on what the surveyor saw.
The sheet holds roof details, shadow notes, electrical load and photos, and because those fields feed the proposal, nobody asks the surveyor to repeat a measurement. Stalled enquiries stay on the sales list. Photographs of the distribution board and the earthing point are attached to the same sheet, which saves a second trip when the cable route is drawn.
Set this up first. It costs the least to change later, and every proposal, stock issue and invoice that follows depends on the survey fields being filled in properly.
Build proposals from the survey and a price list
A proposal starts from the survey. The office sizes the plant, picks panels, an inverter and a structure from the price list, and issues a priced quotation the customer can accept. Cable runs, mounting rails and clamps are priced from the same list, so the quotation matches what the store will later issue.
Several options can share one enquiry. Every revision is kept against it, and the one the customer accepts travels with the job into billing and material planning without anyone retyping it.
Enter your standard packages first. Add the plant types, on-grid, off-grid and hybrid, with the panel and inverter brands you sell, and let the owner decide who may change a price.
- Plant type and system size
- Panel, inverter and structure choice
- Revision history against the enquiry
- Customer acceptance recorded on the job
Issue material and close installation stages from site
Stock holds panels, inverters, structures, cables and protection items, and when material is issued to a job, the panel and inverter serial numbers are logged against that customer. Claims start from that record. Isolators, arrestors and connectors are issued by quantity against the same job, so the closing stock count matches what was fitted on the roof.
Each accepted job is split into stages such as structure, panel mounting, wiring and earthing, and crews close a stage from a phone and attach photos. The office sees progress without a call.
Decide what closes a stage. The checklist should follow how your crews install today, with the photos, readings and notes a stage must carry before the office accepts it as finished.
Track grid files, billing and commissioning
Net-metering applications are files with their own steps, so the system lists the documents sent, the inspection and the meter change, and shows which file waits on whom.
The system files nothing itself. Filing happens with the utility, and the steps differ by utility and by scheme, so your own office keeps doing that part and only records what came back.
Invoices follow the stages agreed with the customer: advance, material and handover, and each payment, whether cash or bank transfer, is posted to the job. Commissioning then closes the job with a sheet of test readings, inverter settings and a signed handover checklist, filed beside the final invoice.
Decide what you need before buying anything
Small installers can cope on paper. Software justifies its cost once surveys, crews, paperwork and service visits sit with different people who each keep a private copy of the facts.
Ground-mounted plants with project scheduling are closer to construction project software, and an electrical contractor with no solar work needs a different product altogether.
List your records first. Note which ones exist, who keeps each, and which sit in a notebook, because the Solar Installation Management Software covers the rooftop job from enquiry to service visit.
Put the advice to work.
Use a test copy or fictional example to turn the discussion into something your team can check.
Track grid files, billing and commissioning
Can you explain the balance from its original documents?
Select a partly settled example in “Track grid files, billing and commissioning”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.
Background reading: ERPNext: outstanding invoices
Solar job record checklist
A single page naming every record a rooftop job should hold: survey, proposal revision, material with serial numbers, stage closures, utility file steps, invoices and service dates. Fill it for three recent jobs. Mark what still lives in a notebook.
Open a blank worksheet to printQuestions owners ask
What should a solar installer set up first?
Enter plant types, packages and the price list first, then build the stage checklist your crews will close from site, using the steps you already follow. Migrate customers and open jobs afterwards. Serial numbers come from existing stock registers.
Can crews update jobs from a phone?
Crews open the day’s jobs on a phone, close each stage from site and upload photos, so the office sees progress without calling anyone for an update. Required fields are agreed at set-up.
Does the software file the grid application for me?
It does not file anything. Filing happens with the utility, and the software only tracks which documents went, when the inspection is due and when the meter changes.