How to Track Waterproofing Treatment Records and Warranties

Ganesh HSStrategy and Technology, GullySystem
Practical advice · 5 min read

In this guide 7 sections
The short answer

Record the system, every coat with its date and crew, the ponding test and the handover date against each treated area. The end date follows from them. Waterproofing Contractor Management Software holds all of it on one record, so a callback is compared with the original treatment, coat by coat.

What a treatment record should hold

Treat the area as the unit. One contract may cover a terrace, two bathrooms and a sump, and each can carry a different system, a different coat count and a different warranty period. Name each area the way the supervisor says it on site, such as sunken slab, parapet wall, lift pit or podium deck, so the record matches the walk-round.

Each area gets its own page. On it, keep the inspection note, the system chosen and the measured square feet, then add each stage as it finishes: preparation, primer, coats, mesh and screed. The material grade belongs there as well, whether cementitious coating, bituminous membrane or polyurethane layer, because each cures and fails differently in service.

Dates and crew names matter. A record that names the crew and the day can be read by a supervisor years after the last coat dried, even after the crew has moved on.

  • Inspection note and photographs
  • System and coats applied
  • Stage dates and crew
  • Material issued against the quotation

The ponding test and the handover signature

Ponding is the proof. Capture the start time, the end time, the water level and the result, and keep the entry beside the coats applied so the two are always read together later. Note where the water stood: against the skirting, around the drain outlet or at the expansion joint, the places a seep is most likely to show first.

Agree the test period first. The system stores whatever period you set, so a contractor who runs longer tests on terraces than on bathrooms can record both without bending the form.

The client signs at handover. That signature closes the area’s record, and the handover date it carries becomes the day the warranty starts, so an unsigned area has no firm end date.

Warranty terms stored against each area

Terms differ by system. A warranty register lists every treated area with its system, handover date, period and cover, and because terms vary, each is stored per area and never per client. A bathroom treated with a cementitious coat under tiles may carry a shorter or different promise than a terrace under a brush-applied membrane, and the register keeps both.

Reminders run from the end date. The owner sees warranties ending soon, grouped by client and area, and can decide whether to offer a renewal, send an inspector or let the cover lapse quietly.

Send the terms with the quotation. Then the register matches what the client was promised, and a dispute over what the cover included can be settled from a page both sides have already seen.

  • System and coat count
  • Handover date and period
  • What the warranty covers
  • What voids it

Linking callbacks to the original treatment

Log every complaint against the area. The entry records the revisit date, the cause the supervisor found and the repair done, so the history of that terrace or bathroom reads in one place. Leaks at a pipe sleeve or a parapet joint may sit outside the treated surface, which is why the cause on the visit matters more than the complaint.

The register shows the cover status. It answers whether the complaint falls inside the warranty period, and the owner then decides whether the repair is chargeable under the terms the client was given.

Patterns appear over time. Callbacks grouped by treatment system and by supervisor show where leaks repeat, but that report reads from stage records, so a missing entry weakens it. Log the cause on every revisit.

Where paper registers are enough

A notebook can work. A contractor with a handful of jobs a year and no written warranty can keep a register in a notebook and lose very little by doing so. Records matter once warranties run for years. Several supervisors raise the stakes.

Decide what you promise first. Fix the warranty period for each system, what it covers and what voids it, because the register can store those terms but cannot invent them for you.

Put the advice to work.

Use a test copy or fictional example to turn the discussion into something your team can check.

Warranty terms stored against each area

What proves that a planned task was actually completed?

Select an overdue entry in “Warranty terms stored against each area”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.

Background reading: ERPNext: maintenance plans

Treated area warranty card

A card for each treated area listing the system, dated coats, ponding test result, handover date, warranty period and end date, with a column for callbacks. Fill in ten past jobs. Count the callbacks you can still trace.

Open a blank worksheet to print

Questions owners ask

When does a waterproofing warranty period start?

The terms are yours to set. Start it at handover. The date is recorded beside the ponding test result and the signature, and the end date and reminder are worked out from it, so nobody counts months.

Can a warranty register show which callbacks are covered?

The register can show that. Each complaint is logged against its treated area, and the register shows whether the visit falls inside the warranty period or after it. The owner decides the charge.

What should a callback entry contain?

Write down the date of the revisit, the supervisor who attended, the cause found and the repair done, because the repeat-leak report reads from those fields. Minor repairs deserve the same entry.

Browse all guidesBack to top ↑
Next step

Have a specific situation to work through?

This article covers the general case. Tell us what you’re actually dealing with and we’ll respond directly.

See the Waterproofing Contractor Management Software product