Skip to main content
GullySystem

Field Services · Waterproofing Contractor Management SoftwareOne connected system for inspections, quotations, treatment records and warranty.

Manage terrace, bathroom, basement and tank waterproofing jobs in one system. Leak enquiries and site inspections become measured quotations. Each coat applied is entered on the job card, the ponding test is logged at handover, and the warranty register shows what is still covered. Stage bills follow the work.

  • Treatment systems, rate list and warranty terms entered the way you quote
  • Open jobs, dues and warranties migrated from your register
  • Treatment system and warranty term changes handled by the GullySystem team

Waterproofing Contractor Management Software keeps terrace, bathroom, basement and tank jobs on one file, set up by GullySystem. Leak enquiries and site inspection measurements become the quotation. Each coat and screed is entered on the job card, the ponding test is logged at handover, and the warranty register shows what is still covered. Stage bills follow the work.

Where it breaks today

What goes wrong before the software.

Inspection notes are not kept with the quote

The supervisor sees the damp patches, hairline cracks and choked outlets on site, and the estimator quotes later from memory and a few photographs. The two are never joined. Surprises follow.

Area and system are quoted by guess

Terrace area, parapet height, skirting run and the number of coats decide how much membrane and slurry is needed. When measurements are not written down, the quotation and the work drift apart.

Coats are applied without a record

Primer, first coat, mesh, second coat and protection screed happen on different days with different crew. Nobody can say later which stage was done, on which date, or by which applicator.

Material goes out and is not matched to the job

Pails of coating, membrane rolls, cement and sealant are issued from the store against a verbal word, and what each site used and what came back is not recorded. Stock disappears.

Warranty details are held in files

A client calls about a leak years later. The system used, the date of handover and the terms of the warranty are somewhere in a folder, and the supervisor who did the work has left.

Stage payments are chased from memory

Advance, mid-work and final bills are raised when someone remembers, and retention held by a builder stays on a separate list. The owner finds the gap only when cash is short.

How it runs

How the work flows through it, step by step.

Illustration with sample figures. Your screens are built around your own records.
  1. 1

    Enquiry

    A leak complaint or a builder’s tender request is logged with the address, the area affected and who referred it. An inspection visit is booked for a supervisor, who carries a moisture meter and a tape.

  2. 2

    Inspection

    The supervisor records measurements, the surface, cracks, damp patches, expansion joints and any earlier treatment, with photographs for each area, so the quotation starts from facts and not from a guess.

  3. 3

    Quotation

    The estimator picks the treatment system for each area, such as polyurethane membrane, cementitious slurry or crystalline coating, and prices it from the measured square feet. The client receives the quotation and the proposed warranty terms.

  4. 4

    Treatment

    Crew are assigned to the job and material is issued from the store. Each stage is logged as it is finished, from hacking and surface preparation to the final coat and protection screed.

  5. 5

    Test and handover

    The ponding test is recorded with start and end times and the result. The client signs the handover, and the warranty register opens for that area.

  6. 6

    After the job

    Stage bills and retention are followed up. Leak callbacks within the warranty are logged against the original treatment, and warranty end dates raise a reminder for the office to call the client.

Modules

What is inside.

Every module can be switched on, left out or changed to match how your team already works.

Enquiries and leak complaints

Log enquiries from clients, builders and referrers, with the address, the type of leak and the inspection visit assigned. A tender request from a builder keeps its own due date.

Learn more

Site inspection records

Record measurements, surface condition, damp patches, cracks, expansion joints and photographs for each area before anything is quoted, so the supervisor’s notes travel with the estimate to the office.

Learn more

Quotations by area and system

Price terrace, bathroom, basement, sump and tank work from measured square feet and the treatment system chosen for each area, whether membrane, slurry, injection grout or crystalline coating.

Learn more

Treatment stage records

Log hacking, surface preparation, primer, coats, mesh and protection screed as each stage is finished, with the date and the crew, so a skipped stage shows.

Learn more

Material issue and consumption

Issue coating pails, membrane rolls, cement, sealants and grout to a site, and compare use with what the quotation allowed. Over-use by one applicator is visible.

Learn more

Crew and applicator scheduling

Assign supervisors, applicators and helpers to sites by day, and see which jobs are waiting for a free crew or for a dry spell between rains.

Learn more

Ponding test and handover

Record the water-holding ponding test with its start time, end time and result, and take the client’s signature when a treated area is handed over. The warranty clock starts there.

Learn more

Warranty register

Keep the system used, the handover date and the warranty terms for every treated area, with end dates that raise reminders weeks ahead so a renewal can be offered.

Learn more

Leak callbacks and rework

Log a complaint against the original treatment and record the revisit and its cause. See whether it falls inside the warranty, so seepage from a new crack is not charged as a failed coat.

Learn more

Stage billing and retention

Raise advance, running and final bills against job stages, and track retention and dues from builders and homeowners, with the oldest unpaid stage bill at the head of the list.

Learn more
Solutions inside

The business modules it is built from.

Each one is also available on its own, or inside a system built for you.

  • Lead Management

    The office logs enquiries from clients, builders and referrers with address and type of leak, and assigns the inspection visit.

  • Estimate/Quotation Management

    Terrace, bathroom, basement and tank work is priced from measured square feet and the treatment system chosen for each area.

  • Technician Scheduling

    Supervisors assign applicators and helpers to sites by day and can see which jobs are waiting for a free crew.

  • Stock Tracking and Alerts

    Coating pails, membrane rolls, cement and sealants are issued to a site, and use is compared with what the quotation allowed.

  • Invoice Management

    Advance, running and final bills are raised against job stages, with retention and dues tracked for builders and homeowners.

  • Ticket Management

    A leak complaint is logged against the original treatment, the revisit and its cause are recorded, and the office sees whether warranty applies.

  • Asset AMC Tracking

    Every treated area has its system, handover date and warranty terms on the register, and end dates raise reminders.

Services

How we would put it in.

Setup, data migration, integrations and anything built on top.

Who uses it

One system, each person sees their part.

For owners

See jobs on hand, quotations awaiting a reply, dues and retention outstanding, warranties ending soon and callbacks by treatment system, without ringing each supervisor.

For estimators

Open inspection notes, price each area, send the quotation and follow the enquiries that have not been answered. Chase the builder’s tender before it closes.

For site supervisors

See the day’s sites. Record stages and material, run the ponding test and take the client’s handover signature on the same phone before leaving the terrace.

For accounts

Raise stage bills, record receipts, follow retention held by builders and pass reports to the accountant at month end without retyping a single bill.

Reports

The numbers the owner asks for.

  • Enquiries by source and quotations converted
  • Jobs in progress by stage and crew
  • Material issued against quoted use, by site
  • Warranties ending soon, by client and area
  • Leak callbacks by treatment system and supervisor
  • Dues and retention outstanding by client
Good fit

Who this is built for.

  • Terrace and roof waterproofing contractors working for homeowners and apartment associations
  • Specialist applicators who work as sub-contractors for builders
  • Contractors who treat bathrooms, basements, sumps and water tanks
  • Firms that also do crack injection, grouting and external wall treatment
  • Teams that give a written warranty and expect callbacks within it
Honest answer

When it is not the right choice.

  • A single applicator who takes a few jobs a month and is paid in cash can manage with a notebook and WhatsApp.
  • A contractor whose work is mainly painting and finishing will find Painting Contractor Management Software fits that work better.
Made to fit

Adapted to your business before it goes live.

You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.

Your treatment systems

The systems you apply, the coats each one needs and the material for each coat are set up as you quote them.

Rate list and measurement rules

Rates per square foot, how parapets and skirting are measured and what counts as an extra are entered the way you work.

Warranty terms

The warranty period for each system and what it covers are decided with you and stored against each treated area.

Open jobs and dues migrated

Jobs in progress, balances due and warranties still running are brought across from your register.

Hosting and changes

GullySystem hosts the system. When a treatment system, rate or warranty term changes, you ask and the GullySystem team updates it.

Works alongside

  • WhatsApp
  • SMS
  • Email
  • Payment links and gateway
  • Accounting package export
Make an informed decision

Questions to settle before choosing the system.

Review these scenarios against the product configuration and record anything that still needs to be agreed.

Warranty register

What proves that a planned task was actually completed?

Select an overdue entry in “Warranty register”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.

Background reading: ERPNext: maintenance plans

Stage billing and retention

Can you explain the balance from its original documents?

Select a partly settled example in “Stage billing and retention”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

Common questions

Questions owners ask before a demo.

Is it built for waterproofing or for general contractors?

It is built for waterproofing contractors. Inspection notes, treatment systems, coats, the ponding test and the warranty register follow how a waterproofing job runs, from the first damp patch to the last callback.

Can quotations be priced by square feet?

Yes. Each area is measured on inspection and priced from your rate list for the system chosen. How extras such as skirting, parapet and minimum charges apply is decided with you.

Can each coat be recorded on site?

Yes. Supervisors log each stage as it is finished, with the date, the crew and the material used. The record stays with the job, so a callback years later can be traced to the exact coat.

How does the warranty register work?

Each treated area carries the system, the handover date and the terms you gave. Reminders appear before a warranty ends, and callbacks are logged against it. Inspection notes and photographs sit beside the entry.

Does it record the ponding test?

Yes. The start time, end time, result and client signature are stored against the area. How long the test runs is decided with you.

Can builders’ retention be tracked?

Yes. Retention held on a bill is listed separately until it is released. The terms come from each builder’s contract, not from the software.

Can the accounts go into our accounting package?

Not built in. Bills and receipts remain on file, ready for the accountant to read. Once the format is known, the accounting package export is quoted separately.

Can open jobs and warranties be moved across?

Yes. Jobs in progress, dues and running warranties are brought across from your paper register or spreadsheet, and your team reviews them before go-live.

Who owns the data?

You do. Taking your data out when you leave is covered in the proposal, ahead of the first day of work.

Is this worth having with only a few crews?

Probably not needed if you take a handful of jobs and give no written warranty. Otherwise crews, users and your treatment systems set the price. Payment links and accounting export add work, as do open jobs and dues. A quotation itemises crews, users, payment links and export.

How long before the supervisors log treatments on it?

Enquiries and leak complaints, site inspection records and quotations by area and system start the work, so they are done before the rest. Treatment stages, material issue and crew scheduling follow. Ponding tests, warranty register, callbacks and stage billing come last. Dates for each step are written into the proposal.

What does the contractor need to find?

Find your rate list and measurement rules, the list of treatment systems, your warranty terms, and the open jobs with dues. An inspection sheet, a quotation, a ponding test record and a stage bill show the forms. Contacts are needed for the owners, an estimator, a site supervisor and accounts. Accounting package access matters for export.

Wondering what it would cost? Share your requirements and an engineer will come back with a scope.

Industries

Built for.

The trades this product is set up for. Pick yours to see how the work runs there.

Related

Related products.

Your requirements

See Waterproofing Contractor Management Software set up around your records.

Tell us how you run things today. An engineer reads it and writes back with what fits as it is, what would need changing, and what we would start with.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements