Reports for Waterproofing Contractor Owners and Managers
These reports are drawn from records the team already enters: inspections, quotations, stage logs, material issues, handovers, callbacks and bills. Nobody has to collate figures by hand when the month closes.
The reports
Each report comes from one or more of the modules. If a record has not been entered, the report shows the gap.
Who acts on them
Owners read enquiries, callbacks and dues. Estimators work from the list of quotations awaiting a reply. The store keeper reads stock and material variance. Accounts reads dues and retention. Supervisors need only their own sites.
Questions an owner should be able to answer in a minute
- Which enquiry source gave the most accepted jobs this season?
- Which sites are behind because a coat has not been done?
- Which treatment system comes back most often?
- How much retention is held by builders, and when can it be claimed?
- Which warranties end next month?
Choosing a few numbers to watch
A long report list is easy to build and hard to use. Pick five numbers for the regular review: open quotations and their age, jobs waiting on a crew, stock below reorder, callbacks this month and money overdue. Look at them in the same order each week. When one moves, open the report behind it. Owners who do this catch a slow-paying builder or a failing product lot weeks before it shows in the bank balance.
Reading the figures
A report is only as full as the team’s entries. A stage not logged leaves a job looking behind, and a pail not recorded makes a site look frugal. A gap in a report points to an entry still to be made. Treat them as a to-do list before treating them as a verdict.
What the client decides
Further reports can be built whenever the figures already sit in the records. Which figures each role may see, and how the owner wants them grouped, is settled with the firm during implementation. Tax and accounting reports stay with the accountant’s own books.
Reading the reports during a month
Owners and managers of a waterproofing firm read reports at different rhythms. Some are for Monday, others for month-end. Following four such moments shows which report answers which question. It also shows who is expected to act on it, and when.
Choosing reports and checking the figures
Reports are worth reading only when the entries behind them are complete. Before the first review, the owner and managers agree which numbers matter, who confirms them, and which gaps in the entries need closing first. Do this once, in one meeting.
Questions to settle before rollout.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
The reports
What does one row mean before totals are combined?
Choose one period in “The reports” and compare it with the source records. Define the date basis and grouping before accepting a total that combines several kinds of entry.
Background reading: Microsoft: reporting grain and relationships
Material against quotation
Which assumptions stop being valid when the quotation changes?
For “Material against quotation”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.
Background reading: ERPNext: quotation terms
Frequently asked questions
Are the figures live?
They read from the records as they stand. A stage entered a minute ago appears in the next view.
Can a report be exported for the accountant?
Reports can be given as files, and bills and receipts can go out as a Tally export if scoped.
Can an owner see only one branch or one team?
Yes, where the firm has set up branches or teams. The owner can see them separately or together.
Will it show profit on each job?
It shows billed value against material and labour entered for the job. Overheads are included only if you decide to allocate them.
Which waterproofing report matters most to an owner?
Most owners start with quotations awaiting reply, dues and retention, and callbacks by system. Those three show money and quality quickest.
Will a supervisor see these reports?
Only the parts the role allows. A supervisor normally sees their own sites and not the firm’s margins.
Is weekly delivery of a report possible?
Scheduled delivery is possible if scoped. Otherwise the report is opened when needed.
Can I compare this monsoon with last year?
Yes, once a year of data is in the records. Older paper records need to be loaded first.
How this feature fits the system.
Waterproofing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and leak complaints
The office logs enquiries from clients, builders and referrers with address and type of leak, and assigns the inspection visit.
Lead ManagementQuotations by area and system
Terrace, bathroom, basement and tank work is priced from measured square feet and the treatment system chosen for each area.
Estimate/Quotation ManagementCrew and applicator scheduling
Supervisors assign applicators and helpers to sites by day and can see which jobs are waiting for a free crew.
Technician SchedulingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements