Skip to main content
GullySystem

Leak Complaint and Enquiry Log for Waterproofing Contractors

Every call about a leaking terrace, a damp bathroom wall or a seeping basement is logged in one list. Each entry carries the address, the type of leak and the supervisor sent to inspect it.

What an enquiry records

A waterproofing enquiry rarely arrives in one tidy form. It may be a homeowner on the phone, a builder asking for a tender rate or an apartment association writing about a roof.

Who and where

Name, phone number, site address and the person who referred the client. A builder’s enquiry also records the project and the block or floor concerned.

The type of leak

Terrace seepage, bathroom leak, wall dampness, basement seepage, sump or overhead tank. The type decides which supervisor goes and what the supervisor carries.

New work or a complaint

A fresh enquiry and a complaint about earlier work are kept apart. A complaint is linked to the original job so that the warranty can be checked.

Source of the enquiry

Referral, dealer, builder, signboard or online search. The owner can then see which source brings work that turns into jobs.

What the caller should be asked

A few questions on the first call save a wasted trip.

  • Where is the damp seen, and where is the room or roof above it?
  • Does it appear only after rain, or all year?
  • Has any waterproofing or plumbing repair been done before?
  • Is the leak from a bathroom above, which no roof treatment will cure?
  • When can someone let the supervisor in?

Seasonal peaks and how the log copes

Calls cluster after the first heavy rains. A log that takes a minute per call is fine in March and hopeless in July. Keep the entry short at the start: name, number, address and leak type. Fill the rest at the inspection. Triage matters too. A basement filling with water outranks a stained bedroom wall, and the office should be able to mark urgency so that supervisors see the worst first. The firm sets what counts as urgent.

From enquiry to inspection visit

Once an enquiry is logged, the office books an inspection and assigns a supervisor. The client is told the day. The visit appears on the supervisor’s list for that day. Notes taken on site go into the inspection record, which is the next page in the chain.

Follow-up on quiet enquiries

Some enquiries are inspected and then go silent. The list shows enquiries with no quotation sent and quotations with no reply, so the estimator knows whom to call.

What the client decides

  • Which enquiry sources are listed
  • Whether an inspection is free or charged
  • Which areas and pin codes the firm serves
  • How soon a complaint under warranty must be visited
  • Who may reassign an inspection

Handling leak calls on a busy phone line

A leak call can arrive at any hour, from a tenant, a society secretary or a homeowner standing under a dripping ceiling. These four moments show how the log is used between the first ring and the inspection visit. Each is short.

The call comes in

Whoever picks up opens a new entry, notes the caller’s name, the address and where the water shows. The leak type is picked from a list. A call with no address is flagged, and a callback number is asked for.

Checking the list before lunch

Every morning, the coordinator reads each entry from the previous day with no inspection date. It is a short list. A few are old customers with a warranty, so those jump the queue. The rest are given a slot by area, nearest sites grouped together.

Sending a supervisor

A supervisor receives the day’s inspection list with addresses, leak type and the caller’s phone. Each stop is marked reached or not reached. Anyone absent at the address is noted so a revisit is arranged.

Calling back the quiet ones

At week’s end, enquiries with no visit and no news are listed. The coordinator rings each caller and records the answer. Some have fixed it elsewhere. Others only needed a date, and now have one.

Rules to settle before the log goes live

A leak log works when everyone fills it the same way. Before the first call is entered, the contractor’s owner and coordinator agree a few rules. They decide what is asked, who closes an enquiry, and how past calls come across. Ten minutes now saves weeks of confusion.

Questions every call must answer

Fix a short set: address, floor, where the leak shows, since when, and whether it worsens in rain. Staff who answer the phone then ask the same things. Later, similar calls can be compared properly.

Who may close an enquiry

Decide who closes an entry. Either the office alone may, or the supervisor after the visit. Pick one now. Without a rule, old enquiries stay open for months and the list becomes impossible to read.

Naming the leak types

Agree a list such as terrace, bathroom, external wall, basement and joint. Keep it short. Ten types is too long for a phone call. Too few types hide patterns the owner would like to see.

Bringing old enquiries across

Choose whether the notebook of past calls is typed in or left behind. Typing in the last season’s calls is a fair compromise. It gives a repeat caller a history without weeks of data entry. Older notebooks can stay on the shelf.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

From enquiry to inspection visit

Who decides whether a failed result blocks the next step?

For “From enquiry to inspection visit”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.

Background reading: ERPNext: inspection criteria

Follow-up on quiet enquiries

Which assumptions stop being valid when the quotation changes?

For “Follow-up on quiet enquiries”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

FAQ

Frequently asked questions

Can a builder’s tender request be logged here?

Yes. It is entered with the project and the blocks or floors named, and the quotation can later be split the same way.

Does the log connect a complaint to the earlier job?

Yes. The complaint is attached to the treated area, so the supervisor sees the system used and whether the warranty still runs.

Can clients send enquiries on WhatsApp?

Enquiries arriving on WhatsApp can be typed into the log by the office. Automatic capture needs an approved business account and is scoped separately.

Who sees every enquiry?

The owner and the office by default. What a supervisor or estimator sees is set by role.

Why does my terrace leak even after waterproofing?

Common causes are poor slope, blocked outlets, unsealed pipe joints and cracked parapet junctions. Only an inspection can say which applies.

Is a leak inspection free?

Firms differ. Some inspect free and recover the cost in the quotation. The log holds whichever rule you set.

Can an enquiry be marked urgent?

Yes. An urgency flag puts the entry at the top of the supervisor’s list. What qualifies is your decision.

What if the same client calls twice?

Search runs on the phone number, which puts a repeat caller straight onto the earlier complaint.

Where it fits

How this feature fits the system.

Waterproofing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and leak complaints

The office logs enquiries from clients, builders and referrers with address and type of leak, and assigns the inspection visit.

Lead Management

Quotations by area and system

Terrace, bathroom, basement and tank work is priced from measured square feet and the treatment system chosen for each area.

Estimate/Quotation Management

Crew and applicator scheduling

Supervisors assign applicators and helpers to sites by day and can see which jobs are waiting for a free crew.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements