Skip to main content
GullySystem

Site Inspection Records for Waterproofing Contractors

A supervisor visits the site and records what is wrong with each surface. Measurements, cracks, damp patches and photographs stay with the job, so the estimator prices from what was seen.

What the supervisor records

The form follows the way a waterproofing inspection is done. Each area of the site is a separate entry, because a terrace, a bathroom and a sump are treated differently.

Measurements

Length and breadth of the slab, parapet height, number of outlets and any area that needs skirting. The square feet are worked out from these.

Surface and slope

The condition of the slab, whether the slope reaches the outlets and whether water stands anywhere after rain.

Cracks and damp patches

Where cracks run, where dampness shows on the ceiling below and where the plaster has blistered. Each is marked against the area.

Earlier treatment

Whether the surface has been coated before, with what and by whom. Old layers may need to be removed first.

Photographs

Photographs are attached to the area they show. Pricing is easier when the photographs are one click away.

Reading the source of the damp

Dampness on a ceiling is where water arrives, not always where it enters. Water can travel along a slab before it shows. A leaking bathroom pipe above looks like a roof leak below. Outlets, parapet junctions and the joint between wall and slab are the usual entry points. The supervisor’s notes should say what was ruled out as well as what was found.

Why it sits before the quotation

Quantity of material depends on area, condition and the number of coats. When these are written down on site, the price does not rest on memory or on a rough guess made in the office a week later.

Measuring a terrace without missing the corners

Terraces are rarely clean rectangles. Water tanks, staircase rooms and parapets cut them up. Measure each block separately and add skirting height along every wall that meets the slab. Count the outlets, the pipe penetrations and any expansion joints, because each needs hand detailing. A rough area from the building plan is a starting point, not a measurement. Write down what was left out, such as an area under a stored tank, so the estimator does not price it by mistake.

Handing over to the estimator

A finished inspection moves to the estimator with its photographs. The estimator chooses the treatment system for each area. That choice is recorded on the quotation, which is the next step.

Points to settle before roll-out

  • Which area types the form must cover, such as terrace, bathroom, sump and tank
  • What moisture reading, if any, you take and with which meter
  • How many photographs each area needs
  • Whether the supervisor works in places with no mobile signal

What the record does not decide

The inspection records what was seen. It does not diagnose the cause of a leak on its own. The supervisor’s judgment, and sometimes a flood test or a look at the floor above, decides the treatment before it is priced.

A supervisor’s inspection day, step by step

A site inspection is a few hours of looking, measuring and photographing, followed by typing it up. They show what is entered at each point. Nothing is skipped.

Starting at the first address

On arrival, the visitor opens the enquiry and confirms the address and the leak type reported. A first photograph of the building front goes in. The record is open before anyone climbs a step. Everything after attaches to it.

On the terrace

Lengths and widths are measured and typed against each surface. Cracks, ponding marks and a loose parapet get photographs and short notes. The corner by the water tank is measured separately. It is the one people miss.

Below the leak

A bathroom ceiling below shows a damp patch. The visitor records its size, colour and the room above. Matching the patch to the terrace layout lets the estimator see which area the water came from. That drives the price.

Handing over in the evening

Back at the office, the visitor checks that every surface has a number and a picture, then marks the inspection complete. The estimator sees it in the queue. A gap is spotted before pricing begins, not after the quotation is sent.

Agreeing what an inspection must capture

The quality of a quotation depends on the inspection record behind it. Before supervisors start using the form, the owner and estimator settle what must be measured and which photographs are compulsory. They also settle how an unreachable site is recorded. Keep it brief.

Fields every visit must fill

List the entries that must be completed before an inspection can be marked done: surface type, measured area, visible defects and photographs. Optional extras are fine. Required ones stop a half-filled form reaching the estimator and wasting a day.

Photographs required per surface

Decide the number of pictures, and of what, every surface needs. An overview, a close-up of the defect and a measuring reference make a sensible set. Keep it fixed. Then the estimator never has to ask for a return visit.

When a site cannot be reached

Agree how to record a locked flat, an unsafe roof or a blocked access. The entry should say why and who was told. The office can then rebook. Otherwise it wonders whether the visit happened at all.

Who corrects a measurement

Decide whether an estimator may change a supervisor’s figures, and how that change is shown. Keep a trail of who altered what. It saves an awkward conversation when the quotation and the site disagree on the roof area.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

What the supervisor records

Who decides whether a failed result blocks the next step?

For “What the supervisor records”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.

Background reading: ERPNext: inspection criteria

Measurements

Do purchasing, operating and billing quantities use the same unit?

Check the measurement unit and rounding used in “Measurements”. Compare the result with a known sample before accepting a converted quantity or calculated charge.

Background reading: ERPNext: units of measure

FAQ

Frequently asked questions

Can the inspection be filled in on a phone?

Yes. The supervisor enters measurements and photographs on site from a phone.

Does it work without a mobile network at the site?

Whether entries can be saved offline and synced later is confirmed in scoping. Basements have poor signal, so say so early.

Can a moisture meter reading be stored?

A reading can be typed in against the area with the date. Direct reading from a meter needs separate scoping.

Can one site have many areas?

Yes. A flat can have a terrace, three bathrooms and a tank, with every one recorded and rated separately.

What should a waterproofing inspection check?

Slab condition, slope to outlets, cracks, damp patches, earlier coatings, outlets and junctions. Photographs and measurements back each point.

Can the client see the inspection report?

Photographs and findings can be shared with the client as part of the quotation. A separate inspection report is a scoping choice.

Can sketches be attached?

Yes. A photo of a hand sketch with dimensions can sit with the area.

Who checks the measurements?

Review happens while the quotation is priced. Some firms ask a second person to check large sites.

Where it fits

How this feature fits the system.

Waterproofing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and leak complaints

The office logs enquiries from clients, builders and referrers with address and type of leak, and assigns the inspection visit.

Lead Management

Quotations by area and system

Terrace, bathroom, basement and tank work is priced from measured square feet and the treatment system chosen for each area.

Estimate/Quotation Management

Crew and applicator scheduling

Supervisors assign applicators and helpers to sites by day and can see which jobs are waiting for a free crew.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements