Skip to main content
GullySystem

Stage Billing and Retention for Waterproofing Contractors

Bills follow the stages of the job: advance, running bills and final bill. Receipts are recorded as they come in, and retention held by a builder stays on its own list until released.

Billing along the job

Waterproofing is paid in parts. A homeowner may pay an advance, a middle payment and a balance at handover. A builder pays against measured work.

Advance

Raised when the quotation is accepted and recorded against the job. It is adjusted on the later bills.

Running bills

Raised when stages complete, from the area treated and the rates agreed. A builder’s bill follows the measurement sheet for that block.

Final bill and handover

Raised after the ponding test and signed handover, with the advance and earlier bills adjusted.

Extras and variations

Work added on site is entered as a line with its own measurement, so the client sees what changed against the quotation.

How retention works in practice

A builder holds back a stated part of each certified bill. That amount builds into a running balance. Payment follows when the contract says, after a defect period. A cap or a release date is set in the contract. Three figures matter: retained so far, released so far, and what is still held. Keep them apart from ordinary dues, or the office chases money that is not yet payable.

Measurement sheets

A running bill for a builder rests on measured area. The sheet names the block, floor and area, with the length and breadth taken on site and the rate applied. Disputes start with a measurement, so the sheet should match the stage record. Agree early who signs it on the builder’s side.

What can hold up a final bill

A final bill waits on handover, and handover waits on the ponding test. If the test is delayed, so is the cash. Snags noted at handover can also hold a builder’s payment. List them on the handover record and close them one by one. Where the contract ties the last payment to a defect period, the office should know the date from the day of billing, not from a memory of the contract.

Receipts and follow-up

Cash, cheque, bank transfer and UPI receipts are matched to bills. Reminders can go by message. Accounts sees, client by client, what is due and what is overdue.

Tax and books

Tax lines on a bill follow the settings agreed with the client’s accountant, who also advises on how retention and advances are treated in the books. An export to Tally can be scoped separately for a particular ledger layout.

Questions for a builder’s accounts team

  • Is retention a fixed share of each bill, and is there a cap?
  • After what period or event is it released?
  • Who certifies the measurement for a running bill?
  • How many days does the builder take to pay a certified bill?
  • Does a variation need a written order before it is billed?

Raising bills across a builder’s project

Stage bills for a builder’s project pass through the site team, the office and the builder’s accounts section. These four moments show what is entered when. They also show what the office watches as bills and retention move forward over the life of a project.

The advance bill

Once the builder accepts the quotation, the office raises the advance as the first stage. The receipt is entered when money arrives. The bill number and date stay with the job. Later bills refer back to it.

A running bill after measurement

After a block is done, the supervisor’s measurements are entered. The office turns them into a running bill with the earlier advance adjusted. The builder’s engineer checks the sheet. Only then is it submitted for payment.

Retention held back

The builder pays less than billed and keeps a share. The held amount is recorded as retention, due on a stated date. It sits on its own list. The owner always sees how much is waiting.

Final bill and release

At handover, the final bill goes out together with the signed test record. Retention stays listed. When the builder finally releases it, the entry is closed. Anything still held is chased from the same list.

Billing rules to agree with the accounts team

Bills that follow stages need rules settled between the owner, the accountant and the site team. These points decide who raises a bill, what supports it and how retention is entered, before the first stage is billed. Agree them once.

Who raises each bill

Name the person authorised to raise advance, running and final bills. Others may prepare but not issue. One name per type keeps numbering tidy, and the accountant knows exactly whom to ask when a bill looks wrong.

Supporting papers per bill

Decide what must be attached: measurement sheet, stage log, ponding record. Send the same set every time. A bill that leaves the office that way is paid faster, and disputes with the builder’s accounts section become rarer.

Entering retention terms

Record the builder’s retention rule on the job at the start, including the release condition. Entering it later invites mistakes. Each bill then calculates against the agreed figure, not a remembered one. The accountant will welcome that.

Moving unpaid old bills

Choose whether old unpaid bills are entered as opening balances. Doing so gives a true list of money due. It needs a clean list from the accountant first, with names and dates. Clean data matters.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Billing along the job

Can you explain the balance from its original documents?

Select a partly settled example in “Billing along the job”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

Receipts and follow-up

Can the same receipt be allocated without counting the money twice?

Take an unallocated amount in “Receipts and follow-up” and apply it to the intended balance. Review the remaining amount and the original receipt reference together.

Background reading: ERPNext: payment allocation

FAQ

Frequently asked questions

Can a bill be raised from measured work?

Yes. Measured area and the agreed rate give the bill value, and the measurement sheet stays attached.

How is retention tracked?

Each bill shows the amount held back. A separate list shows what is held for each builder and the date it can be claimed.

Can a client pay by UPI?

Yes, if a UPI or gateway link is scoped. Receipts are matched to the bill once payment is confirmed.

Does it produce GST invoices?

Tax lines follow the settings agreed with your accountant. Check the invoice layout you need during scoping.

What is retention money in a waterproofing contract?

Retention is a part of each bill that the builder holds back until a stated period or event. The contract fixes the share and the release.

Can an advance be adjusted against later bills?

Yes. Later bills show it as a credit, so the client sees the balance.

Can part of a final bill be held for snags?

Yes, if the client’s terms say so. The held amount is listed with its release condition.

Can bills be sent by WhatsApp?

A bill can go as a document by WhatsApp or email once those links are scoped.

Where it fits

How this feature fits the system.

Waterproofing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and leak complaints

The office logs enquiries from clients, builders and referrers with address and type of leak, and assigns the inspection visit.

Lead Management

Quotations by area and system

Terrace, bathroom, basement and tank work is priced from measured square feet and the treatment system chosen for each area.

Estimate/Quotation Management

Crew and applicator scheduling

Supervisors assign applicators and helpers to sites by day and can see which jobs are waiting for a free crew.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements