How a quotation is put together
One site needs several systems. A terrace may take a cementitious coat with mesh, while a bathroom takes a flexible coating and a tank takes a different product altogether. The client reads one document.
Scope lines a client should see
Clients compare quotations and pick the cheapest. A clear scope helps you hold your price. Name the surface preparation, the number of coats, the product, the treatment at outlets and junctions, the ponding test and the warranty. Say what is excluded, such as tile re-laying or plumbing repair. A quotation that is vague on these will be compared unfairly with one that is not.
Sending and following up
A finished quotation goes to the client as a document by email or WhatsApp. Its status is open, accepted or lost, and the open ones appear in a follow-up list that the estimator works through each morning.
Why the same site gets different prices
Two firms can quote the same terrace and differ widely. One may include a screed and a ponding test. Another may offer a single coat and a short warranty. A third may measure the parapet and the first may not. When a client asks why you cost more, the quotation should answer. Show area, system, coats, preparation and warranty line by line, so the extra cost sits against a visible extra scope.
Acceptance becomes a job
On acceptance, the quote becomes a job with the same areas, systems and quantities. Material allowed for each area carries over, so consumption can later be compared against it.
Questions an estimator should settle with the owner
- Is the rate per square foot of plan area or of surface treated, including parapet height?
- How are minimum charges for small bathrooms handled?
- Which extras are billed on measurement and which are lump sums?
- When does a quotation lapse?
- Who may cut a rate to win a job?
What the client sets
- Treatment systems and the coats in each
- Rates for each system and kind of extra
- Warranty period and wording for each system
- Who may offer a discount on a quotation
- How long a quotation stays valid
Pricing a quotation from inspection to acceptance
A quotation passes from the supervisor’s notes to the client’s answer in a few steps. They also show what changes once the client says yes. Each step is brief.
Settling rules before quotations go out
Quotations carry the contractor’s name and promises, so a few rules matter from the start. The owner and the estimator agree these before the rate list is loaded. They agree them before the first document is sent. Write them down.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
How a quotation is put together
Which assumptions stop being valid when the quotation changes?
For “How a quotation is put together”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.
Background reading: ERPNext: quotation terms
Warranty terms
What proves that a planned task was actually completed?
Select an overdue entry in “Warranty terms”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.
Background reading: ERPNext: maintenance plans
Frequently asked questions
Can one quotation cover a terrace and three bathrooms?
Yes. A line group per area carries its own system, rate and warranty.
Are tax rates applied on the quotation?
Tax lines follow the settings agreed with your accountant.
May a builder’s rate differ from a homeowner’s?
Yes. Keep separate rate lists or set a rate on the quotation for a given client.
Does the quotation fix the price of the job?
It fixes the price for the scope listed. Work added on site is billed as a variation with its own measurement.
How do waterproofing contractors price a job?
Most price by area treated for each system, then add extras such as skirting, crack work and screed. Your rate list holds those figures.
Does a revised quotation keep the old one?
Yes. The earlier version stays on file beside the new one.
Can a quotation show coats and warranty per area?
Yes. System, coats and warranty period are listed per area.
Is a reason recorded for a lost quotation?
Yes. Mark it lost and add a reason such as price, timing or another contractor, so the owner can see patterns.
How this feature fits the system.
Waterproofing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and leak complaints
The office logs enquiries from clients, builders and referrers with address and type of leak, and assigns the inspection visit.
Lead ManagementQuotations by area and system
Terrace, bathroom, basement and tank work is priced from measured square feet and the treatment system chosen for each area.
Estimate/Quotation ManagementCrew and applicator scheduling
Supervisors assign applicators and helpers to sites by day and can see which jobs are waiting for a free crew.
Technician SchedulingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements