Skip to main content
GullySystem

Material Issue and Consumption for Waterproofing Sites

Coatings, membranes, cement and sealants go from the godown to several sites at once. The system records each issue against a job and compares it with the quantity the quotation allowed for that area.

What is tracked

Waterproofing material is costly and is carried from site to site in the back of a tempo. Without a record, a leftover pail is a mystery. A shortage is found only when the crew is standing idle.

Godown stock

Coating pails, membrane rolls, primer, sealant cartridges, mesh and cement, each counted in its own unit with a reorder level.

Issue to a site

A supervisor draws material for a job. Each issue note names the job, the area, the quantity and the supervisor collecting the drums.

Return of unused material

Sealed pails and unopened rolls come back to the godown and are added to stock. Opened containers are recorded as partly used.

Use against the quotation

Each area was quoted for a quantity of material. The record shows how much was issued and how much was applied, area by area.

Where the quoted quantity comes from

Makers print a coverage rate on the data sheet, as area per kilogram or per litre for a stated number of coats. Quantity is area, times coats, divided by that rate, plus an allowance for waste. Rates differ by product, by surface porosity and by whether the surface is flat or vertical. A data sheet therefore beats a rule of thumb, and the figures behind the quotation should be the same ones the store compares against.

Why thin application costs more later

Stretching a pail over more area looks like a saving. The coat ends up thinner than the maker specifies. The membrane may then fail and come back as a callback. A comparison of issued against quoted quantity flags a site that used suspiciously little as well as one that used too much.

Questions for a coating or membrane supplier

  • What coverage per coat does the data sheet give for each surface type?
  • How long does an opened pail keep?
  • Are lot numbers printed on the pack and on the invoice?
  • Which minimum order and lead time apply?
  • Will the dealer take back sealed stock?

Purchases and suppliers

When stock falls below the reorder level, the office raises a purchase order to the dealer or manufacturer. Received material is added with its batch or lot number. A lot number matters when a product turns out faulty and every site that used it must be traced.

Seeing wastage

A site that used far more than its quotation allowed stands out in the report. The owner can then ask whether the area was measured wrongly, whether a coat went on too thick, or whether material left the site unrecorded.

What the client decides

  • Which items are tracked and in what unit
  • Reorder levels for each item
  • Who may issue material from the godown
  • How much variation from the quoted quantity is acceptable
  • Whether lot numbers are recorded at receipt

Issuing coatings and membranes day by day

Waterproofing materials leave the godown in drums, rolls and bags, headed for several sites at once. They show who writes each entry. They also show what the office learns from it.

Loading the van at dawn

The storekeeper hands out two drums of primer and four membrane rolls for a terrace, and enters the issue against that job. The applicator signs for it. Short on the day, the storekeeper notes the gap before the van leaves.

Extra bags mid-job

A bathroom turns out larger than the sketch. The crew asks for more cement and a sealant tube. The extra issue is logged with a reason. It shows against the quoted quantity at once, not weeks later.

Returning what is left

At the end of a site, the crew brings back half a drum of coating. The storekeeper weighs it, enters the return and the job’s consumption falls by that amount. The count then matches what was applied.

Month-end wastage look

The owner opens issues against quotations for each finished job. Two sites ran well above the allowance. The supervisors are asked why. Nothing is assumed, and the answers are written next to the figures for the next review.

Setting rules for material control

Material records depend on a few habits agreed before the first issue is logged. The owner, storekeeper and estimator settle these points together. They decide who signs, what counts as wastage, and how opening stock is counted. Agree them early.

Who may issue stock

Anyone else asking is sent to them. Fewer hands means cleaner entries. The list can change over time, but only with the owner’s agreement and a note of the date.

Units that suit the godown

Pick the units staff already speak in: litres, kilograms, rolls, bags. Converting in the head at the counter causes mistakes. Stay with one unit per item. That keeps issues and purchases comparable, and quotations easy to check later.

What counts as wastage

Agree how much spilled coating, trimmed membrane and torn bags is acceptable, and how each is recorded. A fixed meaning prevents argument at review. Otherwise two supervisors report the same loss in different words, and the figures cannot be compared.

Counting the opening stock

Before the first day of use, count every item once with the owner present. Enter those numbers as the opening balance. Later differences can then be traced to a date and a person, instead of to guesswork and memory.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Purchases and suppliers

Does receiving less than ordered leave the correct quantity open?

Bring a short delivery to the “Purchases and suppliers” walkthrough. Separate what arrived, what was accepted and what remains due before checking the supplier’s bill.

Background reading: ERPNext: purchase receipts

Use against the quotation

Which assumptions stop being valid when the quotation changes?

For “Use against the quotation”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

FAQ

Frequently asked questions

Can material be issued directly from a dealer to a site?

Yes. Record it as received and issued in one step, so the stock figure stays right and the job still carries the cost.

Does it handle partly used pails?

Yes. An opened pail is noted as partly used, and its estimated balance can stay in stock for the next job.

Can a barcode or label printer be used?

Only if scoped for your printer. Godowns manage with typed item names and a lot number.

Does it work out the material needed for a new job?

The quotation holds a quantity for each area. The coverage rate you enter for each system drives that figure.

How much extra material should be allowed for waste?

There is no single answer. The rate depends on the product, the surface and the method. Enter your own allowance, based on past jobs and the data sheet.

What if the issued quantity is far above the quotation?

The site stands out in the variance report. Check the measurement, the coat thickness and whether material was moved to another site.

Can lot numbers be traced to sites?

Yes, if recorded at receipt. Each issue then shows which lot reached which job.

What if the supervisor forgets to record an issue?

The variance report will show the gap later. Firms can ask the store keeper to enter issues at the gate, so no pail leaves unlogged.

Where it fits

How this feature fits the system.

Waterproofing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and leak complaints

The office logs enquiries from clients, builders and referrers with address and type of leak, and assigns the inspection visit.

Lead Management

Quotations by area and system

Terrace, bathroom, basement and tank work is priced from measured square feet and the treatment system chosen for each area.

Estimate/Quotation Management

Crew and applicator scheduling

Supervisors assign applicators and helpers to sites by day and can see which jobs are waiting for a free crew.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements