Skip to main content
GullySystem

Waterproofing Software Views for Owners, Estimators and Supervisors

A waterproofing job passes through several hands, from the first leak call to a warranty reminder years later. Every role lands on the screens for its own stretch of the job.

One job, four roles

Owners

See jobs on hand, quotations awaiting a reply, dues and retention outstanding, warranties ending soon and callbacks by treatment system. This is the view for deciding where to push.

Estimators

Open inspection notes and photographs, price each area from the rate list, send the quotation and follow enquiries that have gone quiet.

Site supervisors

See the day’s sites. Record each stage and the material used, run the ponding test and take the client’s signature at handover, all from a phone.

Accounts

Raise advance, running and final bills, record receipts, follow retention held by builders and pass the figures to the accountant.

Following a job through the roles

A leak call is logged by the office and passed to a supervisor for inspection. The estimator prices the work from their notes. After acceptance the supervisor records the coats and the material drawn, and runs the ponding test. Accounts bills along the way. Months later the same record answers a complaint.

Callbacks and warranty

A complaint years later goes to the office first. The entry shows the system applied and the warranty period. The supervisor who revisits sees the earlier stage record and photographs. The owner reads the cause and the cost afterwards.

A day in the life of each screen

The estimator starts with quotations waiting for a reply and then opens new inspections. The supervisor opens the day’s sites and tags the work done as the day goes on. Accounts begins with receipts and moves to bills due. The owner reads one page in the evening, covering stock, dues and open complaints. Each person ends the day with the same record updated, and nobody hunts for a paper that stayed in a pocket.

Why rates and margins need a rule

A supervisor who sees the quoted rate may talk price on site. An estimator who sees what a client owes may change the offer. Neither is wrong, but the firm should choose. Hide what a role does not need, and give a reason for any access you do grant.

What the client decides

  • Which roles exist on site and in the office, and who holds them
  • Which site job records each role may open, change or cancel
  • Whether supervisors see rates and margins
  • Who may offer a discount or waive a callback charge
  • Whether estimators see dues owed by a client

Screens used at each stage of a waterproofing job

A waterproofing job meets four sets of hands between enquiry and warranty, and each opens a different screen. Following one terrace job shows what each person sees on the day. It also shows what stays out of view. Each screen is built for its own purpose.

Coordinator taking the call

The coordinator opens the enquiry list, enters the caller’s address and books a visit. Quotation rates and margins are not on this screen. It is built for speed on the phone. The visit slot appears for the supervisor immediately.

Supervisor at the site

On the terrace, the visitor opens the inspection form and later the stage log for the same address. Measurements, photographs and layers are typed into a phone. Money columns are absent. The screen stays quick and light.

Estimator pricing at the desk

Pricing happens at the desk, where the inspection record sits beside the rate list and warranty terms. Lines are built one by one. Site entries can be read but not edited. Any doubt goes back to the visitor, not silently corrected.

Owner reading margins

Quoted figures sit against material issued and bills raised, job by job, on the screen reserved for the person running the firm. A few jobs run thin. Questions go to the right person. Other roles do not see these numbers.

Deciding who sees prices and margins

Role views protect the screens people do not need, and the contractor decides where each line falls. These points are best settled between the owner and the senior estimator before staff are given their logins. Decide them once, on paper.

Which roles see rates

Decide whether site visitors may see the rate list at all. Some owners say yes so a visitor can answer a client’s question on the spot. Others say no. Both are workable. The rule must be chosen, not left to chance.

Who sees job margins

Margins are the figure a contractor guards closely. Choose one or two people who read them. Everybody else sees quantities and progress. A narrow list reduces gossip and awkward talk about pay across the team.

Covering for absence

Agree how a role is covered when someone is ill or on leave. A temporary change should be made by the owner and ended on a stated date. Otherwise short-term access quietly becomes permanent access. Nobody remembers why. Nobody checks.

Reviewing access each year

Once a year, read the list of people and roles. Remove leavers. Check that nobody has drifted into a view they no longer need. This is quick. Ten minutes with the owner is enough for a small firm.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Callbacks and warranty

What proves that a planned task was actually completed?

Select an overdue entry in “Callbacks and warranty”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.

Background reading: ERPNext: maintenance plans

Why rates and margins need a rule

Which rule wins when two rates or offers apply?

Use “Why rates and margins need a rule” to check an ordinary sale and one that meets two pricing conditions. Ask for the calculation behind each final amount, rather than only the total.

Background reading: ERPNext: pricing conditions

FAQ

Frequently asked questions

Can a supervisor see the price of a job?

That depends on your settings. Some firms show supervisors the area, system and material but not the rate.

Do site supervisors need a computer?

No. Supervisors get compact screens built for site use, while quotations and billing stay with the office.

Can an owner with several crews see all sites together?

Yes. The owner’s view lists every site with its stage and crew, and can be filtered by crew or supervisor.

Who changes what a role can open later?

The firm decides who holds that right. Changes can also be requested from the GullySystem team.

Can a supervisor also hold the estimator role?

Yes. A small firm’s owner may also estimate, and a login can carry both.

Is there a role for a branch manager?

If you run branches, a role can be restricted to a single branch. Confirm the structure during scoping.

Can the owner see each role’s screen?

Yes. The owner’s login can open any screen, though the usual page is a summary.

Can a new hire be set up quickly?

A role is assigned to a login. Training time depends on how many screens that role uses.

Where it fits

How this feature fits the system.

Waterproofing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and leak complaints

The office logs enquiries from clients, builders and referrers with address and type of leak, and assigns the inspection visit.

Lead Management

Quotations by area and system

Terrace, bathroom, basement and tank work is priced from measured square feet and the treatment system chosen for each area.

Estimate/Quotation Management

Crew and applicator scheduling

Supervisors assign applicators and helpers to sites by day and can see which jobs are waiting for a free crew.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements