Skip to main content
GullySystem

Crew and Applicator Scheduling for Waterproofing Contractors

Applicators and helpers are assigned to sites by day. The schedule shows who is on which roof, which accepted jobs are waiting for a crew, and which sites are on hold for weather.

Who is on which site

A waterproofing firm runs several crews at once, and a crew may move between sites in a single week. One screen holds those moves. Nobody rings round each morning to learn where a crew went.

Supervisors

Each job has a supervisor who inspects, issues material, records the stages and runs the ponding test. One supervisor can hold several sites on a day.

Applicators and helpers

Skilled applicators handle coats and membranes. Helpers prepare surfaces and carry material. Each is assigned by day, so a gap in a crew shows up early.

Own crew and sub-contract gangs

A firm may use its own people and also bring in a gang for a large terrace. Both can be assigned, and a gang’s work is logged on the job.

Waiting and on hold

Accepted jobs with no crew yet are listed. Jobs paused for rain or for the client’s access carry the reason.

Why a day plan goes wrong

Three things upset most plans. The earlier coat is not dry. The client has not cleared the terrace. Rain arrives on the day.

  • A coat that needs a drying gap keeps the crew off that area, so the plan should show when the area is next ready.
  • A gang booked for a big terrace is idle if the screed layer or the plumbing trade has not finished.
  • A job held for rain still has a crew waiting, and that crew can be moved only if somebody sees the hold.

Matching crew to the kind of work

A bathroom treatment and a large terrace call for different people. Bathrooms are small, wet and fiddly, and they need a careful hand at corners and pipe collars. Terraces need more bodies and a quick turnaround before the weather changes. A schedule that carries the job type beside the crew lets the owner send the right skills the first time. It also shows which applicators have never done a membrane job, which matters when the next big order is one.

Linking the roster to the job

The names on the roster carry into the stage record, so each coat shows who applied it. Attendance entered for the day also feeds the labour cost of the job. Wages are paid through whatever payroll the firm already uses.

Planning around the season

Work bunches up before the monsoon and thins out during it. Accepted jobs set against the crews available show the owner when to hire an extra gang. They also show when to tell new clients that the wait will be longer, before a promise is made that the roster cannot keep.

Questions to settle about crews during scoping

  • Is labour paid by the day or by the area treated?
  • Do sub-contract gangs work under your supervisor or their own?
  • How many sites may one supervisor hold on a single day?
  • Who decides to pull a crew off a rain-hit site?
  • Does attendance come from a register, a phone or a biometric device?

What the schedule leaves out

It does not forecast the weather or pick the crew for the owner. The firm decides who works where. Whether labour is paid by the day or by the area is set with the client and kept outside this screen.

A week of crew plans for roof jobs

A waterproofing contractor moves a handful of applicators between terraces, bathrooms and basements every week. These four show who looks at it. Each also shows what changes as a result.

Saturday plan for Monday

The site coordinator lists accepted jobs waiting for a crew and drops each onto a day. Names go against sites. A helper booked twice shows up on screen straight away. The week then starts with a plan, not a phone round.

Early morning on the roof

Applicators gather at the godown, check the sheet for the day and load the materials listed for their site. One look tells them where to go. The site lead already knows who reached which terrace and when.

Rain at ten o’clock

Clouds roll in during a terrace coat. The supervisor marks the site on hold for weather and the crew is moved to an indoor bathroom job. The terrace gets a new date once the forecast clears.

Month-end attendance check

The owner looks back at the days each applicator spent on sites against the days paid. Gaps are discussed with the coordinator. This is a count of days, not a judgement of the quality of the work.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Planning around the season

Which observation would change the proposed scope?

For “Planning around the season”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.

Background reading: GOV.UK: researching user needs

Questions to settle about crews during scoping

Can a correction be traced to the right date and session?

For “Questions to settle about crews during scoping”, check a late correction against the original register. Agree who may amend it and which downstream total should change after the correction.

Background reading: Frappe HR: attendance records

FAQ

Frequently asked questions

Can an applicator be booked on more than one site on the same day?

Yes. Half-day moves between nearby sites are common, and the roster can hold both entries for the person.

Do applicators need to log in?

No. The supervisor can mark attendance and stages for the crew. Whether applicators get a login is a scoping choice.

Can a sub-contract gang be recorded?

Yes. A gang is added as a team, assigned to a job and its work logged on the same stage record.

Can attendance come from a biometric device?

Only if scoped for your device model. Without that, attendance is entered by the supervisor or the office.

How do I plan crews before the monsoon?

List accepted jobs by area and compare them with crews available week by week. The gap tells you how many extra gangs to line up.

What happens to a crew when rain stops a job?

The job is marked on hold with the reason, and the crew shows as free. The office can move them to a covered or indoor job such as a bathroom or basement.

Can I see which crews are free next week?

Yes. The roster shows each person by day, so gaps are visible ahead of time.

Is the schedule shared with clients?

Not by default. The client gets a visit date by message, and nothing more.

Where it fits

How this feature fits the system.

Waterproofing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and leak complaints

The office logs enquiries from clients, builders and referrers with address and type of leak, and assigns the inspection visit.

Lead Management

Quotations by area and system

Terrace, bathroom, basement and tank work is priced from measured square feet and the treatment system chosen for each area.

Estimate/Quotation Management

Crew and applicator scheduling

Supervisors assign applicators and helpers to sites by day and can see which jobs are waiting for a free crew.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements