Skip to main content
GullySystem

Drawing and finish approvals for cabinet makers

Drawing and finish approvals hold each version of a cabinet drawing together with the customer’s approval and the finish sample. The cutting team and the finishers build only what was agreed. Designers record the approval, planners read it before releasing a job, and a later disagreement starts from a dated record.

What each drawing and approval record keeps

A drawing record is a series of versions, and only one version carries the customer’s approval. The record shows which one. The finish sample is held beside it, so the layout and the colour are never agreed apart from each other.

Numbered drawing versions

Each change to a layout becomes a new version, stored beside the last. Nothing is overwritten. Elevations, plans and notes on the plinth, cornice and worktop stay together, so the designer can see what moved between versions.

The customer’s approval

Approval is recorded against one version, with the date and the person who gave it. A customer who approves by email or message has that noted. Fresh approval is needed for later versions. Nothing carries over automatically.

The finish sample

Samples are entered by name, colour and type, whether veneer, melamine, lacquer or thermofoil. A physical sample that was signed off is noted too. The finishers read this entry. They do not rely on a memory of a meeting.

Grain, handle and hinge notes

Grain direction on veneer and lacquer doors, handle position and hinge side are written on the approval. A wrong guess ruins a whole shutter run. The cut list later takes these details from the approved drawing.

An approval from first sketch to release

Approvals are small steps. They decide how a job runs on the floor. The scenes below follow one drawing from its first version to the release of work. Each shows a person in the trade at work, with a clear job to do.

Designer sends the first version

The designer finishes the first layout and sends it to the customer by email or messaging. The version is saved with its date. It waits for an answer. Replies are filed against this version, not the next one.

A customer wants taller wall units

The customer wants taller wall units. The designer saves a second version, and the first stays visible. Only the second goes back for approval, so nobody mistakes the old drawing for the current one on site.

Supervisor checks before release

Before release, the supervisor opens the approvals for the day’s jobs. Any drawing with no approved version is held back. The check is short. It stops a shutter run being cut to a draft layout.

Finisher reads the sample entry

At the spray booth the finisher opens the approval and reads the lacquer or veneer entry. The name and colour are compared with the sample on the bench. A doubtful match goes back to the designer.

Who reads and records each approval

Approvals are written by a few people and read by the whole shop floor. Every role below opens the same drawing record. Each reads it to answer a different question.

Designers and sales staff

Designers and sales staff save each version, send it out and record the customer’s reply. They mark one version approved. That is the only version the rest of the factory is meant to build from.

Planners and supervisors

Planners and supervisors read the approval status before releasing work. A job with an unapproved drawing is visible as such. They hold it and ask the designer. Nobody finds the mistake at the saw or the spray booth.

What accounts note

Accounts see the date of approval when the advance is recorded. Approval comes first. The advance follows, then the release of the job, and the dates sit side by side on the order for anyone to check.

The owner’s view for Drawing and finish approvals

Owners see which drawings are waiting on a customer and which jobs are held for that reason. A long wait is a conversation. The owner may want to have it with the customer, politely and early.

Decisions before approvals go live

Approval rules are easiest to set before the first live job. Settle these four points with the head designer and the production planner. Write the answers into your own notes for new staff. Keep them short.

Who may change an approval for Drawing and finish approvals

Decide who may mark a drawing approved and who may withdraw an approval. Limit both to designers and the sales lead. Once a version is approved, a change becomes a new version, never an edit to the old one.

What counts as approval for Drawing and finish approvals

Decide what evidence you accept, such as a signed print, an email, a message or a spoken yes confirmed in writing. Name the kind of evidence in the record each time. The wording stays the same.

How open jobs come across for Drawing and finish approvals

Open jobs come over with their drawings. Mark the version being built as approved on import. Then check a few against the files and against the finished samples on the shop floor. Do this before go-live.

Which report matters first for Drawing and finish approvals

Begin with orders by production stage and station. It shows jobs still sitting at the approval step, before they reach cutting or edge banding. Agree who reads it each morning, and who chases the customers concerned.

Where approvals link to other features

An approval sits in the middle of the order. It takes what was chosen at the start and hands the agreed version to the floor. Steps before and after it rely on the same record, and the links are listed here. Each one is a handover, not a copy.

  • Takes finish choices recorded in enquiries and design requests
  • Receives the agreed lines from quotations and rate lists
  • Gives cut lists and bills the approved drawing version
  • Tells production planning which jobs may be released
  • Offers quality checks the agreed finish to test against

Where drawing approvals stop

The record shows what was agreed. It does not draw, check the engineering or judge whether a layout is sound. Design software stays where the designers work, and importing from it is separate paid work. A disagreement over meaning is settled by the owner with the customer, and a legal question goes to an adviser. A single trusted carpenter on small jobs may do well with a signed print.

FAQ

Frequently asked questions

Can the factory build from a drawing not yet approved?

The planner sees the approval status before releasing a job. A drawing with no approved version is plain to see, so the work can be held. That choice stays with the planner and the owner. It is not automatic.

Does a revised drawing replace the approved one?

A revision is a new version. The approved one stays on file beside it, and the new one needs its own approval. Nobody on the floor has to guess which drawing the customer agreed to.

How is the customer’s finish sample recorded?

It is entered by name, colour and type, such as veneer, melamine, lacquer or thermofoil. A physical sample that was signed off is noted. Finishers read that entry. They do it before any spraying or wrapping starts.

Can drawings be imported from our design software?

Not directly. Drawings are filed against the order by hand. Files can also be loaded against it. Connecting one particular design program is separate paid work, which is agreed at the first workshop with your team.

What if a customer disputes the layout later?

Open the record. It shows each version, the date of approval and who approved it, in order. That is the starting point. The owner settles the matter with the customer, and any legal question goes to an adviser.

Where it fits

How this feature fits the system.

Cabinet Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and design requests

Each enquiry is logged with its source and site, and drawings, photographs and finish choices stay attached to the customer record.

Lead Management

Quotations and rate lists

Quotes are built from board, hardware, labour and finish rates, every revision is kept, and open quotations stay in one list for follow-up.

Estimate/Quotation Management

Drawing and finish approvals

Each drawing version is stored with the customer’s approval and the finish sample, so the cutting team works from the agreed one.

Project Document Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements