Resource inventory for cloud tenants by plan
Resource inventory lists each virtual machine, storage volume, IP address, firewall and backup job a cloud provider has built, filed under its paying tenant. Each line carries size, region, start date and plan. Engineers record it and support reads it. Billing checks usage against it.
What the inventory records for each resource
Every item an engineer builds becomes a line in the inventory. The line says what it is, where it runs, when it began and which plan covers it. Each answers a question that comes up later.
Using the inventory through an engineer’s week
Resources change whenever engineers build, resize or retire them, and the inventory is touched each time. Four moments show who opens it and why. Each belongs to a person with a defined job in a cloud provider, and each is described below.
What each role sees in the inventory
Engineers write the inventory, yet others read it every day. Each role gets the view that fits its job. Owners and directors read totals by plan. The four roles below read the detail.
Decisions to settle before the inventory is filled
An inventory is only as good as the habit of keeping it current. Agree four points first. Do it with your platform engineers and your finance lead before the first resource is entered.
How the inventory connects to the product
The inventory sits between what was sold and what was measured. Plans give each resource its price, and usage readings arrive for each one. Invoices and incident records then draw on the same list. Five links carry data between features. Each is named in the list here.
- Tenant records show every resource beside the contract
- Plans and rate cards price each listed resource
- Usage import matches readings to listed servers and volumes
- Incident log names the nodes and tenants affected
- Margin by plan counts hardware cost against these resources
Where the resource inventory stops
This record does not build servers, start them or watch them run. Provisioning stays in your control panel or hypervisor, and facility work belongs to Data Centre Operator Management Software. Engineers still decide capacity and placement. A provider with a single server and a few websites can note the details in a spreadsheet and stop there.
Frequently asked questions
Can resources be imported instead of typed in?
Resources can be entered by hand or imported. Tell the team which platform you run. The import route depends on what that platform exposes, and your engineers check the first imported lines against the live list.
What happens to a server nobody billed?
A resource with no plan or no tenant is listed for review. That list is where forgotten servers show up before the invoice run. Finance and engineers settle each line together. The decision is recorded on the line.
Are backup jobs and firewalls listed too?
Backup jobs, firewalls and IP addresses sit beside servers and volumes, each filed by tenant. Every type has its own fields. Open the list for one tenant to see how the types mix on a single account.
How is a decommissioned resource closed?
The engineer sets an end date on the line. Billing stops from that date. History stays visible, so a later query can be answered. A manager can reopen a closed line if the removal turns out to be a mistake.
Does the inventory show what a tenant actually uses?
It shows what exists and what it was sold as. Actual consumption comes from platform readings. Those sit beside the inventory in metering. Comparing the two is how overage and forgotten servers are found, line by line.
How this feature fits the system.
Cloud Service Provider Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Plans and rate cards
Fixed plans, metered units and tenant-specific prices are defined once, and each billing cycle picks up the quantity and rate that apply.
Subscription BillingInvoicing and tax
One invoice per tenant joins fixed plan lines, metered use and credits, numbered and taxed according to the tenant’s country.
Invoice ManagementTickets and incident log
A ticket opens against a named service, so support sees the tenant’s plan and recent outages before replying.
Ticket ManagementTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements