Skip to main content
GullySystem

Strength and moisture tests for corrugated board

Strength and moisture tests record burst, edge crush, box compression and board moisture against the board run that made the sheets. Limits come from each buyer’s purchase terms. A job that fails its limits is held, and it stays on hold until quality staff decide whether it is released.

What each test result records

A strength reading is only useful if it names the run, the limit and the person who took it. Otherwise a collapsed stack at a warehouse cannot be traced to its cause. Four entries make each result a usable record. All four are required.

Test type and the buyer’s limit

Each result names its test, whether burst, edge crush, box compression or board moisture, beside the limit written in the buyer’s purchase terms. The reading is compared with that limit.

Sample size and reading

The technician enters the sample size and the reading for each test. Different tests can use different sample sizes. Setting them is the lab lead’s task. The record shows the number of boards or boxes that stood behind the figure.

Run number and sampling time

Every result is stored against the board run it came from, with the date, the time and the name of the person who took the sample. The run leads on to the reels. The chain is complete.

Pass or hold status

A result inside its limit shows as a pass. Outside the limit, it shows as hold, and the job carries that mark. It stays there until quality staff record a decision. The decision is stored with a name.

Testing through a working day

Tests are taken at the corrugator and at the bench, and their results matter at the dock. Four moments show how technicians, quality staff and the loading bay handle one stack of boxes from sampling to release. Each moment is brief.

Sampling as a run closes

A technician takes sheets from the finished stack as the run closes and notes the run number. Moisture is read first, because it changes fast. The other tests wait for the bench, where the instruments stand.

Entering readings at the bench

At the bench, burst and edge crush readings go in against the run, then compression on finished boxes. The screen shows the buyer’s limit beside each field. The verdict appears as the figure is typed. No second sum is needed.

A job fails its limit

A compression result comes in below the buyer’s limit. The job turns to hold, and the loading bay sees it at once. The stack stays where it is. Someone from the lab opens the run to look.

A complaint from a warehouse

A buyer reports that a stack collapsed. The quality lead opens the order, reaches the board run and reads the tests and the reels behind it. The reply starts from records, not from memory or guesswork.

Who enters results and who acts on them

Testing is a small team’s work, but its outcome reaches the whole plant. Four views follow, beginning with the people who hold the instruments.

Quality staff decide release

Quality staff enter or check results, set sample sizes and decide whether a run is released. They see every test against its limit, and which ones are overdue. The call to release is theirs alone.

Corrugator crews see the status

Crews see whether the run they made passed, is waiting for tests or is on hold. They do not edit results. Knowing early that a run is in doubt lets them adjust before the next one.

Owners read pass and hold

The owner reads tests per run with pass or hold status, and sees which runs and which buyers produce a hold more than once. It shows where quality problems cluster. It also shows how long tests wait for entry.

The loading bay and dispatch

Bay staff see a held job marked clearly, so it is not loaded by mistake. They continue with the jobs that passed. A released job turns clear again. The dock then proceeds as normal and loads it.

Decisions to settle before set-up

Test rules differ between plants and between buyers, and they must be written down before results are entered. Settle four things with the lab and the quality lead. Your buyers supply the limits themselves.

Who may release a held job

Decide whether the quality lead alone can release a job on hold, or whether the owner must agree for certain buyers. The release is recorded with a name, a date and a short reason. The next reader can follow it.

What is left out for Strength and moisture tests

Not every run needs every test. Agree which tests a buyer asks for and which the plant takes for its own sake. A shorter list is easier to keep up. Extra tests can be added later.

How test formats come across

Bring the sheets and record formats you use now. Test types and limits are defined together with your lab. Past results need not be keyed in. They stay in the files where they already sit.

Which report matters first for Strength and moisture tests

Pick the first view to prove, such as tests per run with pass or hold status. The screens are arranged for that view first. Once technicians enter every reading on the day, other views follow without argument.

How testing connects to the rest of the product

Tests hang on the board run, so they depend on planning for the run number and on reel records for the paper. Their outcome flows forward to the converting queue and the dock. Results matter only if they reach the person who can act. These five links carry results through the plant.

  • Corrugator planning supplies the run number each test attaches to
  • Liner and medium reel stock links results back to mill lots
  • Converting queue holds a job that fails its limits
  • Bundles, packing and dispatch stops a held job leaving
  • Box specification library names the board grade being tested

Where strength and moisture tests stop

The product records tests. It does not carry them out, calibrate an instrument or certify a laboratory. Those limits belong to your buyers and your lab, and whether a borderline result is acceptable is a judgement for quality staff and the buyer. Accreditation and any legal duty over product safety rest with the owner and an adviser. A plant with no buyer demand for test records can keep a bench notebook.

FAQ

Frequently asked questions

Who sets the limits a result is checked against?

Each limit is taken from the buyer’s purchase terms and entered when the test types are set up with your lab. The product compares readings with them. It does not choose a limit on its own.

Who decides when a held job is released?

Whoever leads quality does. They open the held job, read the results and record a decision with their name and date. Until then the job stays on hold, and the loading bay cannot treat it as ready.

Can sample sizes differ from one test to another?

The lab lead sets a sample size for each test type. Burst can use one size and compression another. The entry shows the size beside the reading, so a reader knows how much stood behind the figure.

How are results found after a warehouse complaint?

Start from the buyer’s order and open its board run. The tests taken on that run sit beside the reels it used. The sequence takes only a few clicks. The claim can then be answered with facts.

What shows when a test has not been entered?

The run shows tests awaiting entry, and an overdue one is flagged. It cannot be missed. Each morning the list is there to read. Shift leads see it too. A run cannot be treated as passed until its required readings are in.

Where it fits

How this feature fits the system.

Corrugated Box Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Estimating and quotations

Quotes are built from blank size, board weight, print colours and tooling, and a revised price for the next enquiry sits beside the earlier one.

Quote & Proposal Management

Liner and medium reel stock

Each reel is booked on arrival with grammage, width and supplier lot before it can be issued to a board run.

Goods Receipt (GRN)

Corrugator planning

Orders of like width are grouped on the corrugator, and the board shows which run feeds which converting machine this week.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements