Skip to main content
GullySystem
Manufacturing · Corrugated Box Manufacturer Management Software

One system for box specifications, paper reels, board runs, dies and strength tests.

Box specifications, liner and medium reel stock, corrugator planning, converting routes, cutting dies, strength tests, bundles and invoices sit together. Each order carries its ply, flute, board grade and print colours, and each board run carries the reels it consumed. Estimators, planners, machine crews, testers and dispatch staff read the same record, from the buyer’s first size enquiry to the strapped pallet.

  • Box styles, plies and flutes typed in using each buyer’s own wording
  • Buyer list, die register and reel counts copied in from what you hold today
  • Planning and test-rule changes made afterwards by our own staff, whenever you need them

Corrugated box plants run orders, paper reels, corrugator planning and converting routes in Corrugated Box Manufacturer Management Software, which GullySystem configures for cases, trays and die-cut boxes. Each board run links its liner and medium reels to the burst and compression tests taken from it. Bundle counts and print details follow the buyer’s approved sample into the delivery.

Where it breaks today

What goes wrong before the software.

Reels are not linked to board runs

Liner and medium go onto the corrugator in whatever order the racks hold them. Grammage and supplier lot sit on a slip that is binned after loading, so no one can say which reel fed a given stack of sheets. The link is gone.

Trim is estimated, never measured

Board width, reel width and run length are scattered across shift sheets. Whether a quotation allowed enough waste is learnt only after the job. By then it is late.

Tooling is lost on the racks

Cutting dies, creasing rules and print plates are kept by habit. A repeat order waits while the die worn last season is found.

Specifications live in sample boxes

Flute, ply, print colours and the approved logo version sit in a drawer of samples. A new planner cannot read them. Samples fade.

Strength results lack a job number

Burst and compression readings are written under a date. When a stack collapses at the buyer’s warehouse, the matching board run cannot be found. Claims stall.

Bundle counts are fixed at the dock

The buyer wants a set number per bundle and a particular label. A mismatch appears when the truck is already loaded. Rework follows.

How it runs

How the work flows through it, step by step.

  1. 1

    Enquiry and estimate

    A buyer gives box size, ply, flute and print. The estimator works out the blank, the board grade and the sheets per tonne.

  2. 2

    Specification approval

    The box specification and print proof are confirmed against the buyer’s saved version before the order is booked.

  3. 3

    Paper check

    Liner and medium reels are checked against stock by grammage and width, and purchasing orders any shortfall.

  4. 4

    Board run

    Orders of like width are grouped on the corrugator. Each run notes the reels it consumed.

  5. 5

    Converting

    Sheets pass through the printer slotter, rotary die cutter, stitcher or gluer with the right die and plates fitted.

  6. 6

    Testing, packing and dispatch

    Samples are tested, boxes are bundled and strapped, and a packing list goes with the load.

Modules

What is inside.

Every module can be switched on, left out or changed to match how your team already works.

Box specification library

Keep inside dimensions, ply, flute, board grade, print colours and the approved sample for every buyer.

Estimating and quotations

Price boxes from blank size, board weight, print colours and tooling. Every revision is kept for the next enquiry.

Taking orders and quoting dates

Each quantity and date is checked against corrugator hours first. The buyer’s packing line is then never promised a stack the plant cannot make.

Liner and medium reel stock

Log each reel on the dock with its grammage, width and mill lot so planners see which can go to the corrugator.

Corrugator planning

Group orders by board width, sequence flute changes and show which run feeds which converting machine.

Converting queue

Line up printer slotters, die cutters, stitchers and gluers, with the die and plates each job needs.

Tooling register for dies and plates

Track each cutting die, creasing rule and print plate with impressions run, repairs and rack position.

Strength and moisture tests

Record burst, edge crush, box compression and board moisture against the run, and hold a job that fails its limits. A failed job stays on hold.

Trim and waste analysis

Compare reel width, board width made and length run to show trim per order and per corrugator shift.

Bundles, packing and dispatch

Bundle counts and pallet loads are recorded at the strapping station, and the packing list prints from them.

Invoices and buyer accounts

Bill on thousands delivered, enter payments, and see which buyer owes most and for how long.

Solutions inside

The business modules it is built from.

Each one is also available on its own, or inside a system built for you.

  • Quote & Proposal Management

    Quotes are built from blank size, board weight, print colours and tooling, and a revised price for the next enquiry sits beside the earlier one.

  • Goods Receipt (GRN)

    Each reel is booked on arrival with grammage, width and supplier lot before it can be issued to a board run.

  • Production Planning

    Orders of like width are grouped on the corrugator, and the board shows which run feeds which converting machine this week.

  • Batch and Serial Tracking

    Every board run takes a number that ties its sheets back to the liner and medium reels loaded on the stands.

  • Quality Control

    Burst, edge crush and compression readings are entered against the board run, and a run outside its limits is held from dispatch.

  • Fixed Asset Register

    Each cutting die, creasing rule and plate is listed with impressions run, repair history and rack position.

  • Barcodes and Labels

    Bundle labels print in the buyer’s layout with the job number the packing list shows, so the dock can match both.

  • Work Order Management

    The printer slotter or die cutter receives a job with its sheets, die and plates listed, and the crew closes it with counts.

Services

How we would put it in.

Setup, data migration, integrations and anything built on top.

Who uses it

One system, each person sees their part.

For owners

See board runs, reel cover, trim by shift, tests outstanding and balances by buyer.

For estimators and sales

Build box quotations from stored blank sizes and tooling, and reopen an older revision.

For corrugator and converting crews

Read the day’s queue, the reels to load and the die and plates to fit for each job.

For quality staff

Enter burst and compression results, set sample sizes and decide whether a run is released.

For the reel store and loading bay

Reels are booked in at the gate and issued to the corrugator. Counted, labelled bundles leave from the loading bay.

Reports

The numbers the owner asks for.

  • Board runs by flute and width
  • Reel use against sheets produced
  • Trim per order and shift
  • Tests per run with pass or hold status
  • Dies and plates by impressions since repair
  • Bundles dispatched by buyer
  • Open invoices per buyer, longest unpaid at the top
Good fit

Who this is built for.

  • Plants that run a corrugator and several converting machines
  • Box makers who buy board sheets and convert only
  • Makers of die-cut trays and wrap-around boxes for retail packs
  • Export packers’ suppliers who need heavy-duty cases
  • Companies whose buyers ask for compression test records
Honest answer

When it is not the right choice.

Made to fit

Adapted to your business before it goes live.

You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.

Flutes, plies and board grades

Your board grades, flute profiles and paper mills are set up with your estimators.

Machine list

The corrugator, printer slotters, die cutters, stitchers and gluers become the planning board.

Test types and limits

Burst, edge crush and compression tests are defined together with your lab, using the limits written in each buyer’s purchase terms.

Units and currency

Box sizes in millimetres or inches and weights in kilograms or pounds follow each buyer, and currency and tax lines are checked per country at setup.

Works alongside

  • Barcode and bundle label printing
  • Weighing scale input
  • Email
  • WhatsApp or other messaging
  • Accounting software export
Common questions

Questions owners ask before a demo.

Can a board run be traced to its paper reels?

Yes. Each corrugator run records the liner and medium reels it drew from. A box order opens to the run, the reel lots and the tests taken from it.

How does it help with trim waste?

Reel width, board width and run length are recorded for each run. The trim report then shows which orders left the most waste, and your estimators can revise their allowance.

Can it hold a die and plate for each repeat order?

Yes. Each box specification points to its cutting die, creasing rule and plates, and the register shows the rack position and impressions run.

How are burst and compression results entered?

A technician enters the sample size, the reading and the result at the lab bench or on a tablet. A run that fails its limits is held back from dispatch.

Can different flutes run through one plant?

Yes. B, C, E and double-wall boards each have their own grades and reel needs. Planning shows which flute is on the corrugator each day.

Does it manage buyers who want their own bundle labels?

It stores each buyer’s bundle count and label layout, and prints them from the packing screen so the dock does not rewrite them.

Can we start with live orders?

Yes. Orders still open, box specs and reel stock are copied in from your sheets. The first live run waits until planners have matched them to what stands on the floor.

Which files do we get back on exit?

Board specifications, runs and strength test results come out as files in the format agreed in the quotation. Nothing is held back at exit.

How is pricing set?

Cost grows with users, corrugator and converting machines, and box styles set up. A figure comes after a demo built on your own case and tray orders.

Wondering what it would cost? Share your requirements and an engineer will come back with a scope.

Book a demo

See Corrugated Box Manufacturer Management Software with your own data.

Tell us how you run things today. We’ll show you the parts that matter to you and say plainly what would need changing.

  • No obligation
  • A reply within one business day
  • Your details stay private

Start with your requirements

Seven short steps that tell us what you need. An engineer reads them before getting in touch.

Share your requirements