Skip to main content
GullySystem

Liner and medium reel stock for corrugated box plants

Liner and medium reel stock records every paper reel on the day it arrives, with its grammage, width and mill lot. Planners see which reels can go onto the corrugator stands, and the reel store sees what to issue. Each reel then stays linked to the board run it fed.

What each paper reel record holds

Paper is bought by the tonne but used by the metre, so its record must follow it from the gate to the stand. Each record carries fixed facts and facts that change. Four of them decide whether a planner can use the reel. Each is short.

Grammage and paper type

Each reel is logged as liner or medium, with its grammage, such as 150 gsm liner or 120 gsm medium. Planners match grammage to the board grade an order needs. The core label stops being the only record.

Width and weight on arrival

Width is entered in millimetres, with the weight where scale input is set up. A reel that arrives narrower than the purchase order is seen at the gate, not at the stand. Only the dock staff need touch it.

Mill lot and supplier

The mill’s lot number and the supplier name are kept on every reel. If a stack of boxes fails a test, the lot is the thread to pull. It leads back to one delivery. It names one supplier.

Rack position and issue history

The rack position, the date issued to the corrugator and any part-used reel returned to the store are noted. Planners know what stands where. A part reel is not forgotten behind a full one.

Reel stock through a corrugator plant’s day

Paper moves all day, from the truck to the rack to the stands. Each hand-over is a chance for the record to drift from the floor. Four moments show how the store, the planners and the crew keep them together. Each takes only a minute.

A truck at the gate

At the gate, store staff book each reel in on arrival, entering grammage, width and mill lot, before it can be issued to a board run. No record means no loading. That rule keeps the racks honest.

The planner checks paper

Before confirming a run, the planner compares the liner and medium it needs with stock by grammage and width. A shortfall goes to purchasing at once. The corrugator is not left waiting for a lorry.

Issue to the stands

The store hands reels to the corrugator crew and records the issue against the run. The slip that used to be binned after loading is replaced by a record. The lot is never left on a scrap of paper. Anyone can read it later.

A part-used reel returns

At the end of a run, a reel not finished comes off the stand and goes back to the store. Staff log it with its new rack position. The next planner sees it as available paper.

Who handles reels and who reads the stock

Reel stock is touched by the dock, the store, the planners and the crew, and read by the owner. Each person sees the part that concerns the work. Four views follow. They differ more than you might expect.

The reel store and loading bay

Store clerks book reels in at the gate, label them, rack them and issue them to the corrugator. They see what arrived, what waits for issue and what has gone to the stands. Their screen is quick to read.

Corrugator crews load reels

Crews see which reels to load for the next run, with grammage, width and rack position for each. They confirm the load. Their record is the link that ties a board run to its paper.

Quality staff trace a lot

When a burst or compression result is poor, quality staff open the run and read the reels it used. They see the mill lot at once. A supplier conversation can then begin with facts in hand.

Owners see reel cover

The owner reads how much liner and medium is on hand by grammage and width, and which reels are low. It shows where paper is thin before a run is lost. Purchasing is then asked in good time.

Decisions to settle before set-up

Reel records are simple, but the habits around them need agreeing. Four choices made with the store and the planners keep the first month calm. Write them down. Do it before the first reel is booked in.

Who may adjust stock for Liner and medium reel stock

Decide who can change a reel’s record after it is booked, for example to correct a width keyed wrongly. A wrong width is found at the stands. Fix it fast. Make sure the correction stays visible beside the original entry.

What is left out for Liner and medium reel stock

Tiny offcuts and core scraps need no record. Agree the smallest part-reel the store will log. Anything smaller goes to waste paper. A clear line keeps the racks list short, trusted and easy to count.

How current counts come across

Reel counts are copied in from what you hold today, and the store then counts the racks against that list. Differences are settled before the first live run. Do the count in one quiet shift.

Which report matters first for Liner and medium reel stock

Choose the first view the owner wants, such as reel use against sheets produced. Set-up is built around it. The other views follow. Add them once the store is booking in without fuss, and planners trust the counts.

How reel stock joins the rest of the product

Reel stock sits between purchasing and the corrugator. It answers planners before a run, and it answers quality staff after one. Its records are short. The five links below show where they are read, and where figures come back to it from the floor and from the test bench.

  • Taking orders and quoting dates checks paper before promising a date
  • Corrugator planning picks reels that suit each board run
  • Strength and moisture tests trace a failure to its mill lot
  • Trim and waste analysis compares reel width with board made
  • Box specification library names the board grade that sets the paper

Where reel stock stops

The reel record tells the plant what it holds and where it went. It does not buy paper or bargain with the mill. The price, payment terms and any claim against a supplier for faulty paper stay with the owner and the accountant. They are business decisions. A box maker who buys board sheets and only converts holds no reels, and has no need of this page.

FAQ

Frequently asked questions

What is entered when a reel arrives?

Entries cover liner or medium, the grammage, the width, the mill lot and the supplier, plus a rack position. Until that is done, planners cannot issue the reel to the stands. No exceptions are made.

Can a part-used reel return to the rack?

Yes, once the crew takes it off the stand. Staff log it back with a rack position. It shows in stock again, so a later planner can choose it for a smaller job. That saves paper.

How do planners know which reel suits a run?

They match the grammage and width the board grade needs against the reels on the racks. Only reels that fit are offered. The planner picks one. The choice is written against the run, and the reel is then marked as taken.

What happens if a mill lot proves faulty?

Open the lot and see every reel that came in under it, and every board run that used one. Quality staff then know which orders to check. The supplier is told with the numbers in hand.

Who orders more paper when stock runs low?

Purchasing does. The planner’s paper check shows the gap by grammage and width, and purchasing is told. The product records what is held and used. It does not place orders with a mill on its own.

Where it fits

How this feature fits the system.

Corrugated Box Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Estimating and quotations

Quotes are built from blank size, board weight, print colours and tooling, and a revised price for the next enquiry sits beside the earlier one.

Quote & Proposal Management

Liner and medium reel stock

Each reel is booked on arrival with grammage, width and supplier lot before it can be issued to a board run.

Goods Receipt (GRN)

Corrugator planning

Orders of like width are grouped on the corrugator, and the board shows which run feeds which converting machine this week.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements