Skip to main content
GullySystem

Counting every truck at the fertiliser gate

Truck receipt and bag count logs each lorry against the company invoice and counts the bags by grade while the driver is still at the gate. A shortage, a torn sack or a wrong grade is written down before anyone signs. Storekeeper, owner and accountant read the same count.

What a fertiliser truck receipt records

Every lorry becomes one receipt that holds the company invoice and the count taken beside it. Each receipt stands alone. It answers who counted, what arrived and what was wrong with it, for anyone reading the file after the lorry has gone.

Invoice and lorry details

Each receipt opens with the company name, invoice number, invoice date and lorry number. Bags billed are keyed by grade and pack size, so the gate count has a figure to be held against. Dispatch papers are attached.

Bags counted by grade

Bags received are entered for each grade, such as DAP or urea, with the stack or bay each lot was sent to. Loose bags sit on their own line. No grade is folded into a single total.

Shortage, torn and wrong-grade flags

Three flags sit beside every grade line. Shortage records the gap against the invoice, torn sack records the split bags, and wrong grade records what was stencilled instead. Each flag carries a typed note from the storekeeper.

Signature, time and names

Gate sign-off carries the time and both names, the storekeeper’s and the driver’s. Any shortage is written on the delivery slip, with the bag count, before the lorry leaves. Signed copies stay on file for later.

A truck day at the fertiliser gate

A receipt opens when the lorry reaches the gate and closes when the driver signs. Between the two, the storekeeper works grade by grade beside the loaders. They run from first light to the evening read.

Lorry reaches the gate

A lorry from the company depot arrives before the shed opens. Storekeeper opens a receipt, picks the invoice and starts counting grade by grade as the loaders break the first row. The driver waits at the gate.

A split bag on the tailboard

A loader lifts a bag of ammonium sulphate that has split and spilled. Torn is marked against that grade, with the batch mark noted. The count carries on. The spill is not lost in the total.

A stencil that does not match

Halfway down the load, one stack carries a grade that differs from the invoice line. That line is entered as wrong grade. The driver sees it, and the dispute is raised at the gate, not weeks later.

The evening read

After the shed shuts, the owner opens the day’s trucks. Tallied invoices sit apart from those with a gap. Short lorries come first. The slip with the driver’s signature stands beside each one for checking.

Who reads a truck receipt and what they see

Receipts are written once, at the gate, and read by four people afterwards. Nobody retypes a figure from a paper slip.

For the storekeeper

Counts grade by grade, flags shortages and torn sacks, and takes the driver’s signature. The invoice quantity stands beside each line. Any gap shows the moment the last bag is entered, while the lorry is still there.

For the owner

Reads trucks received with their shortages and torn sacks, by company and invoice. A short lorry is easy to find. The count with both signatures is there to put in front of the company at any time.

For the accountant

Reads each receipt against the company invoice before it is passed for payment. Shortage and torn-sack lines show which amount to query. Received quantity goes to the books through the accounting export. Nothing is retyped.

For counter staff

Sees that a lot has arrived and which stack holds it. A grade that came in torn is visible before it is promised to a farmer. The counter reads the result. It does not need the whole receipt.

Decisions to settle before gate counts go live

A few choices decide how strict the gate is. Settle them with the storekeeper and the owner before the first live lorry. They are short conversations. Each one saves an argument on the day a dispute arrives.

Who may change a signed receipt

Decide whether the storekeeper alone may reopen a receipt, or whether a correction needs the owner’s word. A count signed in front of a driver should not move quietly afterwards.

What the gate does not count

Agree what stays outside the receipt, such as sample bags, bags returned by farmers or stock moved between sheds. Each has its own record. Mixing them into a truck count blurs the shortage figure for the company.

How trucks in transit come across

Lorries still on the road at cut-over need their invoices keyed so they can be counted on arrival. Opening stock is loaded from your ledger and checked against a physical count by your office. Cut-over is a quiet day.

Which report matters first for truck receipt and bag count

Name the one report the owner opens every evening, probably trucks received with shortages and torn sacks, by company and invoice. That page is checked first against a real run of lorries. Everything else follows it.

How the gate count connects to the product

A truck receipt is the first entry in a bag’s life in the shed. What gets counted becomes saleable stock. What gets flagged travels on to the owner and the accountant. Five links carry the count onward from the gate to the stacks and to the books.

  • Counted bags post into grade and warehouse stock
  • Invoice quantities are read against company allotments and indents
  • Torn sacks found at the gate go to write-offs
  • Shortage lines back the claim raised with the company
  • Received quantity reaches the accountant through the accounting export

Where the gate count stops

Gate counts record what was counted and what was wrong. They do not decide whether a company accepts a shortage claim, and they do not move money. That conversation stays with the owner and the company’s representative. Payment of the invoice stays with the accountant. A shop that unloads a lorry only now and then can keep a signed paper slip.

FAQ

Frequently asked questions

Can one lorry carry several company invoices?

Set it up so each invoice gets its own receipt. One bill, one receipt. Storekeeper then counts against one bill at a time. Each shortage is tied to the right company invoice. Nothing needs sorting out later and nothing is guessed.

What happens to a bag that arrives torn?

Counted, flagged torn against its grade and noted with the batch mark. The bag does not join saleable stock. Month end brings it to the owner’s write-off review, with the reason beside it for each grade.

Who signs the gate count?

Storekeeper and driver both sign. The time and both names are kept with the receipt. A disagreement weeks later is settled by reading what was agreed at the gate, not by memory or by phone calls.

Can a weighing scale back up the bag count?

A weighing scale link is among the connections listed for the product and is quoted as a line of its own. The bag count stays the record. The scale is an extra check beside it.

Where do we read shortages for one company?

The trucks received report lists shortages and torn sacks by company and invoice. Open one company and read its invoices in date order. Each short lorry shows its gap. The signed slip sits beside it.

Where it fits

How this feature fits the system.

Fertiliser Dealer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Truck receipt and bag count

The count at the gate is booked against the company invoice by grade, and shortages or wrong grades are recorded before the driver signs.

Goods Receipt (GRN)

Grade and warehouse stock

Stock is held by grade, bay and stack, so the counter knows which shed to send a loader to for forty bags.

Warehouse Management

Company allotments and indents

Allotments, lifted quantities and pending balances sit beside each indent, so the next order to the company is placed against real figures and not a remembered total.

Purchase Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements