Skip to main content
GullySystem

Master key systems for locksmith firms

Master key systems records the levels of each system on a site, the keys cut at each level and the person holding every key. Returned and lost keys are marked as they happen. Key custodians and owners use it. Charts are kept as documents against the site.

What a master key record keeps per system

A master key system is a plan of who can open what. Here the plan becomes a list a locksmith can check. Four parts make up each system. Together they show the state of every key today. Nothing is guessed.

Levels of the system

Each system lists its levels, from a top master through sub-masters to the individual keys. The doors each level opens are noted. A new level is added as a new entry.

Keys cut at each level

Every key cut is entered with its level and its stamp. A second copy of a key gets its own line. Duplicates are therefore visible at once. A caretaker’s copy and a manager’s copy are never confused.

Who holds each key

Each key line names a holder, such as a caretaker, a tenant or a manager, with the date of handover. A key held by a firm is held under the firm’s name. A change of holder is a new entry.

Returned and lost keys

A returned key is marked returned with the date. A lost key is marked lost, and the doors it opened are listed. Exposure is then easy to see. Whether to rekey is for the building’s owner.

Master key moments in a locksmith’s week

Work on a master key system is slow and careful, and it spans several visits. These four moments show how the record is used, from first design to the last returned key. Each changes a line, not a whole chart. Nothing needs redrawing.

Setting up a new office

An office takes a master key system. The locksmith enters the levels, cuts the keys and records each holder against its line. Handing keys to the tenant’s staff brings the issue list to its first full version.

A new starter at a shop

A shop takes on a staff member. A key at the right level is cut and logged to that person. The manager’s key and the new key both show against the site’s holder list. Staff changes are never lost.

A departing caretaker

A caretaker leaves and hands back keys. Each is marked returned against its line. One is missing, so it is marked lost. That entry lists the doors the key opened, ready for the building manager.

A contract key audit

At a contract visit, a technician walks the site with the issue list and counts each key against its line. Any difference is written on the record. The audit result then sits beside the contract it belongs to.

Who reads master key records and why

These records show which doors a key can open, so they are shared with care. Roles are agreed with you at set-up. Four people use the records in different ways.

Key custodians keeping the lines

Custodians enter levels, cuts and holders and mark keys returned or lost on each line, as the keys move. Adding or retiring a key happens under a logged approval. Questions about a system go to them.

Owners checking exposure

An owner reads which systems are held, the number of keys out and which keys are lost. A lost top master is plain to see. The owner decides what to offer the customer. That choice is not automatic.

Technicians on an audit visit

On a contract visit, the technician is given the issue list for the site if the role allows it. Keys are counted against it. Gaps are noted on the spot and passed to the custodian.

Commercial customers on account

A building manager reads the keys issued for their own sites through the account record. They see who holds what on their buildings. Other customers’ systems stay out of view, and so do the codes.

Decisions on master key records before set-up

Older systems carry old history, so set-up needs honest answers about what is known. Four answers are needed first. Settle them before any key is entered, and write each one down.

Who may change a system

Adding a level changes who can open what. Agree which custodians may add one, and who approves it. The user and the time are logged against every edit. Nobody else edits a line. Keep this list short and named.

What the record leaves out for Master key systems

Door-by-door drawings stay as documents on the site. This record holds levels, cuts and holders only. Agree which old systems are recorded in full and which only as far as the firm can prove. A half-known system is marked as such.

How existing charts come across for Master key systems

Your chart, book or spreadsheet supplies the first entries. Careful entry matters more than speed. Check every line. A technician then counts the keys on the first audit visit and corrects any line that is wrong.

Which report matters first for Master key systems

Read the access log for key records first. It shows who opened each system and when. Do this while the first charts are being keyed in, so any odd view is explained early, not months later.

How master key records link to the product

A master key system sits under a site in the key register and draws on stock, job cards and contracts. Each link below saves a second entry somewhere else. Read them as a chain that starts at the cutting bench and ends in the audit. Five links matter.

  • Sits under each site in the key register
  • Takes blanks for each key cut from stock
  • Raises key audits on commercial contract visits
  • Records new cuts from the closed job card
  • Logs every view and change in the access log

Where master key records stop

Levels, cuts and holders are what it shows. It does not design a master key system, cut a key or tell a customer whether to rekey after a loss. Those choices sit with the locksmith, the building owner and any security adviser. The software holds the answer, not the decision. A small site with one or two keys needs only a list.

FAQ

Frequently asked questions

Can one site hold more than one master key system?

Each system is recorded separately under the site, with its own levels, cuts and holders. A shop unit and a shared store room can therefore sit on different systems. Each stays distinct. Lines from one system are not mixed with another’s.

How is a lost key shown in the record?

The line for that key is marked lost, with the date and the doors it opened. The line stays on the record. History is not rewritten. Rekeying is decided by the building’s owner, with advice from the locksmith if asked.

Can a key audit be done from the record?

A technician at a contract visit counts keys against the issue list. Any difference is noted on the record and sits beside the visit. The audit checks what is held. It does not change the system.

Who may add a level to an existing system?

Adding a level changes who can open what, so only the people you name may do it. Who they are is agreed at set-up. A logged entry shows who made the change and when. Ask the owner who holds the approving role.

Can a returned key be issued again?

A returned key can be issued again as a new line with a new holder and date. The earlier line stays. The history of that key then reads from first cut to latest holder, with every date.

Where it fits

How this feature fits the system.

Locksmith Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Technician schedule

Emergency cover and booked visits sit on one calendar, so a contract visit is moved deliberately and not lost when a call takes the technician.

Technician Scheduling

Job cards and identity checks

Each job card holds the call, the check made on the caller, the work done and the parts fitted, and it closes only when billed.

Job Cards

Key and keycode register

Only the roles you name can open a site’s keycodes or issue lists, and everyone else sees that a record exists and nothing more.

Roles and Permissions
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements