Skip to main content
GullySystem

Splints, aids and equipment orders for occupational therapy

A splint or aid is measured on one day and fitted much later, and someone must remember in between. This feature tracks each item through measurement, ordering or fabrication, fitting and review, with supplier, cost and due date. Overdue thermoplastic splints, orthoses, pressure garments and aids appear on a single list.

What an equipment order record holds

Each item has its own record. The notes refer to it but do not hold it. It follows one splint or aid from the first measurement to the review. The status is always visible, so the therapist can tell at a glance who is still waiting.

Item, client and measurements

The record names the item and the client it is for. Items include a thermoplastic splint, an orthosis, a pressure garment, adapted cutlery or a seating insert. Measurements are saved as numbers. A photograph of the limb or the chair is attached.

Supplier, cost and due date

An item ordered from outside has a supplier, a cost and a due date. One made in the clinic has a fabrication date instead. Either way the date is on the record. The list shows when it passes.

Status from measurement to review

Status runs through measured, ordered or being made, received, fitted and under review. The therapist moves it on after each step. A client can be told where the item stands without anyone hunting for it.

Fitting and follow-up review

A fitting is recorded with its date, the fit and any adjustment made on the spot. A review date is set for each item. Splints may need an early review, seating inserts a later one.

Equipment orders through a working week

Every item passes through several hands before it reaches the client: the therapist, the supplier, the front desk and the assistant. Each hand-over is a chance for it to be forgotten. Four items follow. That status keeps them in view.

A splint measured on Monday

A hand therapist measures a client for a thermoplastic splint and enters the measurements as numbers. The item is created with a fabrication date. It reads measured, and the client is booked for the fitting.

A garment ordered from a supplier

A pressure garment is ordered from a supplier. The cost and the due date are entered, and the status changes to ordered. The front desk sees the due date when it plans fittings. The supplier’s name stays on the line.

The overdue list on Wednesday

On Wednesday, the front desk opens the list of overdue items. A splint due last week and an aid that has not arrived appear. A call to the supplier gets a new date. The new date is entered on the line.

A fitting and a review date

A client returns for the fitting of the splint. The therapist checks the fit, makes an adjustment and records it. It moves to fitted, and a review date is set. The item leaves the overdue list.

Who handles splints and aids

Equipment moves between a therapist, a supplier and the front desk, so each role needs a different slice of the record. Each sees the same status, and only the detail differs. Here is each role’s part.

For the clinic owner

The owner sees splints, orthoses, seating and aids ordered, fitted and overdue. Supplier and cost sit on each line. A supplier that is slow to deliver shows up in the overdue list. Overdue items are chased first.

For the therapists

A therapist measures, orders or fabricates, fits and moves the status after each step. The overdue list shows which of their own clients are still waiting. Orders start from the session note. Nobody fills in a separate form.

For front desk staff

Front desk staff phone suppliers, record the new due date and book the fitting once an item arrives. They also tell the client or carer. A late item is on the overdue list. They enter the cost when the supplier’s bill arrives.

For therapy assistants

An assistant sees which fittings are booked and lays out the splint, the strapping and the tools before the client arrives. Status changes are left to the therapist. Late deliveries are the front desk’s to chase.

Decisions to settle before orders go live

Equipment has money and a client’s comfort attached, so the clinic agrees its rules first. The choices cover who may order, which items are tracked and how current orders come across. Settle them early with the lead therapist.

Who may order or alter

Decide who may place an order, who may alter a cost or a due date and who may close an item as fitted. Decide whether the owner approves any item above a set cost. Write the limit down.

Which items are tracked for splints aids and equipment orders

Not every aid needs a record. A pencil grip handed over on the day may stay off, while a custom splint, a pressure garment or a seating insert is tracked. Decide where the line falls, so the overdue list stays worth reading.

How open orders come across for splints aids and equipment orders

Items still waiting on a supplier or a fitting are keyed in with their status, due date and cost. Closed items stay in the old file. Someone checks each open item against the supplier’s paperwork before anyone works live.

Which equipment report matters first

Splints, orthoses, seating and aids ordered, fitted and overdue is the report this feature feeds. Decide whether the owner starts with the overdue items, to chase suppliers, or with items fitted, to plan reviews. Choose one first.

How equipment orders connect to the clinic

An order starts with a measurement and ends with a fitted item, and several features meet along the way. It takes measurements from the assessment and its trigger from the session note. It hands the fitting to the diary and the review date to the therapist’s list. The list shows where each link sits.

  • Assessments and outcome measures supply the saved measurements
  • Session notes start an order and record the fitting
  • Appointments and room booking hold the fitting slot
  • Goals and progress show what the item is meant to achieve
  • Reports and letters can list items supplied and reviewed

Where equipment tracking stops

The feature tracks an item from measurement to review. It does not design a splint, check that a supplier’s product is safe for a client or hold stock. A supplier’s price and delivery date are what the supplier gave, entered by hand. Clinical fit remains the therapist’s call. A clinic that fits a handful of aids a year may manage with a note in the file.

FAQ

Frequently asked questions

Can we track splints from measurement to fitting?

Every item has a status that runs from measured through ordered or made and received to fitted and reviewed. Status moves on step by step. Staff can see who is waiting and who is overdue, without asking the therapist.

Does the system show which items are overdue?

One list covers every item. Overdue thermoplastic splints, orthoses, pressure garments and aids appear together. Each line shows the client, the supplier and the due date, and the front desk can work down it each morning.

Where are supplier and cost recorded?

They sit on the item. Each line carries the supplier, the cost and the due date, with a fabrication date for items made in the clinic. A call to a supplier can be followed by a new date on the same line.

Can adapted cutlery and grab rails be tracked too?

The steps are the same. Adapted cutlery, grab rails and wheelchair seating follow the route of a splint: measured, ordered or fabricated, fitted and reviewed. A clinic can leave out items it hands over on the day.

Is the review of a fitted item recorded?

A fitting is recorded with its date and any adjustment, and a review date is set. Reviews are booked like any visit. The outcome goes on the item, while whether it still suits the client is the therapist’s judgement.

Where it fits

How this feature fits the system.

Occupational Therapy Clinic Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Appointments and room booking

Reception books each therapist against a client and a room, handles cancellations, and sends reminders to the client or the parent.

Appointment Scheduling

Appointments and room booking

Treatment rooms, the sensory gym and shared items such as standing frames are booked alongside the therapist, so two sessions never claim the same space.

Resource and Room Booking

Home, school and workplace visits

Visits outside the clinic are placed against a therapist by day and area, with travel time allowed between them.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements