Skip to main content
GullySystem

Chemicals and consumables for pressure washing

Chemicals and consumables logs each delivery of detergent, degreaser, hypochlorite, sealer and petrol. It notes what every job drew down and sets a reorder point for the staples. Crew leads see what is on the trailer. The office sees what to order. Cost per job follows.

Deliveries and drawdowns for detergent and petrol

A pressure washing yard holds drums of detergent and degreaser, bottles of hypochlorite, tubs of sealer and cans of petrol. Each moves in on a delivery and out on a job. This record tracks both ends. The shelf and the book then agree.

Delivery of each product

Each delivery is logged by product, quantity and date. Four drums of detergent and two of degreaser go in as one entry each. The supplier’s name is noted. Nothing is guessed from an empty shelf.

Draw-down on each job

When a job is finished, the operator or crew lead notes what it used. Hypochlorite goes down for a roof, degreaser for a car park, petrol for the machine. Use is tied to the job. It is not spread across the week.

Reorder point for staples

Staples such as detergent and petrol carry a reorder point. When stock falls to it, the item is flagged. The yard sees the warning before the last drum is opened.

Cost per job

With delivery costs entered and draw-down noted, each job picks up a cost for chemicals and fuel. Set it beside the invoice. A cheap quote that ate expensive hypochlorite shows up. Margin is no longer a guess.

A delivery, a roof job and a low drum

Stock moves fastest in the busy months and is checked least. A week at the yard shows where the record helps. A delivery arrives on Monday. A roof job eats hypochlorite. Before the week ends, a drum quietly runs down.

Monday delivery at the yard

The van from the supplier brings detergent, degreaser and sealer. The lead counts them in and logs each line. Counting takes care. The shelf and the book match from the start of the week, as they should.

A roof job draws hypochlorite

A soft wash on a moss-covered roof uses hypochlorite and detergent. The operator notes both on the job card. That roof now carries its own chemical cost, apart from the driveway next door. The split is clear.

Degreaser reaches its reorder point

By Thursday the degreaser is down to two drums, and the stock list flags it. Staff order more that afternoon, before a car park contract needs it. Nobody finds out on site. The delivery arrives in good time.

Petrol before a long route

Before a long route, the crew lead checks petrol against the record. The cans loaded are logged as drawn. The crew leaves with enough fuel. The cost lands on the day’s jobs, where it belongs.

Who counts, who draws and who orders

Chemicals pass through several hands each day. The crew lead loads them, the operator uses them, the office orders more and the owner watches the cost. Each needs only part of the picture.

For owners watching cost per job

Owners compare chemicals and fuel with revenue, job by job. A cheap quote that eats hypochlorite shows up. The reading does not wait for the accountant. It uses what the crews noted at the stop.

For the office ordering stock

Office staff see which items sit below their reorder point and what each cost last time. They order before a drum runs dry. The list is short. It can be read at a glance, standing up.

For operators noting what they used

Operators add the chemicals drawn to the job from the phone. It takes a few taps. A job closed without the figure leaves a gap, and the crew lead will chase it before the day ends.

For crew leads counting drums

Crew leads check chemicals and fuel before leaving and record what the route used. They count drums at the yard. A short delivery is spotted there. Their count is the one the stock figure trusts.

Choices to make before the first delivery is logged

Stock records go wrong when units are muddled. Before the first delivery is logged, the company decides how each product is counted and who writes down what a job used. These decisions are cheap now.

Which products get a reorder point

Give staples such as detergent, degreaser and petrol a reorder point. Skip items bought once a year. A flood of alerts teaches people to ignore them. Choose the few items that stop a route when they run out.

How drums and bottles are counted

Decide the unit for each product. Detergent may be counted in drums, hypochlorite in litres, petrol in cans. A mixed unit makes a job’s draw-down meaningless. Pick one unit per product and keep it for good.

Who notes what a job drew

Agree whether the operator or the crew lead writes down what a job used. The operator knows the dilution. The lead knows the drum. One of them must own the entry, or neither will do it.

Counting the shelf on day one

Count what is on the shelf before the first delivery is logged. A wrong starting figure spoils every reading after it. Choose a day. Count together. Write the number once and sign it off with the owner.

Stock figures that feed other screens

Chemicals link the yard to the job and the bill. A job card collects the draw-down, a delivery adds to stock, and a reorder alert reaches the office. The job’s cost then sits beside the invoice. The same figures serve the crew lead and the owner.

  • Job cards carry what each clean drew down
  • Quoted extras such as sealing tell the lead what to load
  • Each job’s cost sits beside invoices, receipts and dues
  • Route load from route and job scheduling shapes the trailer’s contents
  • Reorder alerts reach the office before a route runs short

Limits of the chemical and fuel record

The record counts what you tell it. It does not weigh a drum, read a label or check a mix. Safe handling, storage rules, disposal and any permits belong to the owner and an adviser. The feature does not order from suppliers. A lone operator with one trailer can count stock by eye and a pencil.

FAQ

Frequently asked questions

Can petrol be tracked like a chemical?

Yes. Petrol is logged on delivery and noted against jobs in the same way as detergent or sealer. It can carry its own reorder point. Machine hours stay under machines and trailers, so the two do not mix.

What happens when stock hits the reorder point?

The item is flagged on the stock list and the office sees it. Nothing is ordered automatically. A person places the order with the supplier. The flag only means nobody learns about it on site.

How is cost per job worked out?

From what you enter. Each delivery has a cost, and each job notes what it drew. The result covers chemicals and fuel drawn. Your accountant decides how labour and other costs are added on top.

Do we need to log every splash of detergent?

No. Agree a practical unit, such as a measure or a can, and note it on each job. Exact millilitres are not the aim. A steady habit beats a perfect count that nobody keeps up.

Can old stock figures be brought in?

Starting stock is counted once and entered. Anything you keep in a spreadsheet is worth raising during set-up. A clean count is more useful than a long history of old deliveries, and it is quicker.

Where it fits

How this feature fits the system.

Pressure Washing Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and online booking

A booking page lists the cleans you offer and the open slots, and each request lands with the office carrying its address and surface.

Online Booking Portal

Surface and area quotes

Quotes pick from rates held per surface type and area unit, with sealing or stain extras added and every revision kept.

Estimate/Quotation Management

Route and job scheduling

Stops are placed on a route and a day, and a rainy morning moves the whole day with one change instead of many calls.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements